Loading...
CF-Village-CS 890607 (2) · CITY 0¥ COPPELL 255 PARKWAY BL%q). P. O. BOX 478 COPPELL, TE~S 75019 I PROJE~: (214) 462-0022 A~E~ION: WE ARE SENDING YOU ~ Attached [ ] Under Separate Cover via the following items: [ ] Mark Up Plans [ ] Plans [ ] Prints [ ] Copy of Minutes [ ] Copy of Letter [ ] Specifications Change order 1 [ ] COP I ES DATE NO . DESCRIPTION THESE ARE TRANSMITTED as checked below: ~] For Your Use -~ O]~Tg~4/ [ ] Approved as Noted [~ As Requested [ ] Approved as Submitted [ ] For Review & Comment [ ] Note & Reply To: [ ] Returned for Corrections [ ] Note & Forward To: [ ] Resubmit Copies for Approval [ ] Submit Copies for Distribution [ ] Return Corrected Prints [ ] Return Markup Plans with Corrections REMARKS: 2OPY TO: SIGNED: DATE T"ANSalTTAL ~tE~IORANDUM TO: D~'T. ~0 FROM: Investigate and Report ;- Per Your Request Take Approorint- ~j/~., ~ ~ .~,'~,.Ir Your Information '1~ p~r my Signature ~ Your Recommendation R~ R, ~tua ~_ ~ l~a Request Approved ~o ~,~,41'~'~''' ~ ~uest Denied A~a' ~ ~ and Return ~gnature ~/N 190-0041-1 TRANS/~I TTAL ~EkOR&N DU/~i ~)D^TE~"- '~ "'~ "°: I ~'~', ~ ~0 ~ Investigate and Report ~ Per Your Request · ~ Take Appropriate Action ~ For Your Information Nay [?, ~989 ~ S~ ~ ~ File ~ Prepare Reply for my Si[nature~ Your Recommendation ~ Read and Return ~ R~uest Approved ~For Your ~proval ~uest Denied · 0 = Ru ~ Attach File and Return ~Signature ERON: Da co.~.zs: have appro, Parkway Pump ~ R~T~ ~ ~;~)8~, :he Village the electric. :omply with May 17, 1989 TO: Russell Doyle, City Engineer FROM: Dale Jackson, Chief Building officia~ RE: Change Order - Village Pump Station I have approved the proposed electrical disconnect for the Village Parkway Pump Station. The proposed change order will comply with the electrical code. GINN, INC. CONSULTING ENGINEERS Mr. Ru sell/Doyl , P.E., City Engineer Post Off/ce Box 478 Coppel~, Texas 75019 Re: Village Parkway Pump Station Change Order #2 Dear Mr. Doyle: Attached please find six (6) copies of Change Order #2 for the above referenced project. This change order has been initiated at the request of Mr. Dale Jackson, Building Official, for the City of Coppell. The purpose of this change order is to allow for the main electrical service(s) to the pump station to be remotely tripped from the outside in the event of an emergency. The proposed modifications will increase the contract amount by $2,300.00. There will be no change in contract time. We recommend that the City approve this requested change. If you concur, please forward this Change Order to Mr. Ratliff for his approval. Cajun has requested a response on this item by April 28, 1989 in order to avoid possible delays to the pump station. If we can be of further assistance or if you have any questions, please contact us. Sincerely, attachment cc: Steve Goram Dale Jackson Karl Hirschey, Cajun Contractors, Inc. H. Wayne Ginn, P.E. Joe Kotrla, P.E., C.R. McCreary & Associates, Inc. File 380 17103 Preston Road · Suite 100 · LB 118 · Dallas. Texas 75248 · Phone 214/248-4900 CHANGE ORDER Onstmctions on reverse side) No. 2 . PROJECT: Village Parkway Pump Station DATE OF ISSUANCE: :"- : ' ' -' : '-.i"' .='- ' '~'. -' - ' ' OWNER: City of Coppell (Name, P.0.Box 478 Address) Coppell, TX 75019: · ,, '.., ! CONTRACTOR: Cai Lin Contractor$~ 'T~-7 ................ OWNER's Project No. P.0. BOX 104 .......................................... Baton Rouge, LA 70821-0104 ENGINEER:' Ginn, Inc. Consulting Engineers CONTRACT FOR: Village Parkway Pump Station 380 ENGINEER's Project No. You are directed to make the following changes in the Contract Documents. Description: Install remote trips for main service breakers in accordance with C.R. McCreary & Assoc. 's letter dated 2/17/89. Purpose of Change Order: Install remote trips for main service breakers per the request o£ the City Building O££icial. Attachments: (List documents supporting change) 1. Cajun Contractors, Inc. letter dated 3/30/89 2. Ginn, Inc. letter dated 2/24/89 3. C.R..~4cCreary & Assoc. letters dated 2/16/89 ~ 2)17/8 CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $ Z,336,772.00 300 calendar days days or date Previous Change Orders No. 0 to No. i Net change from previous Change Orders $ -0- -O- days Contract Price prior to this Change Order Contract Time Prior to this Change Order $ 2,336,772.00 300 calendar days day~ or date Net Increase (c]0~ of this Change Order Net Increase (decrease) of this Change Order 2,300.00 -0- $ days Contract Price with all approved Change Orders Contract Time with all approved Change Orders 2,339,072.00 300 calendar days $ days or dale RECOMMENDED: APPROVED: APPROVED: EJCDC No. 1910-8-B (1983 Edition) Prepared by the Engineers' Joint Contrac! Documents Committee and endorsed by The Associated General Contractors of ^merica. Home Olflce: Dallas Office: Atlanta Office: P.O. Box 104 · Baton Rouge, LA 70821-0104 P.O. Box 540487 · Dallas, TX 75354-0487 4000 Cumberland Pkwy., Bldg. 800, Sra. A '* Atlanta, GA 30339 (504) 293-5857 · Fax No. (504) 291-9777 (214) 5508611 · Fax No. (214) 550-1816 (404) 3330195 · Fax No. (404) 3330199 Ginn, Incorporated 17103 Preston Road Suite 100 Dallas, Texas 75248 Attention: Mr. Sanford Case, P. E. RE: Village Pkwy Pump Station Gentlemen: In accordance with your February 24, 1989 request, Cajun Contractors, Inc. has investigated the work involved in adding remote trips for the main service breakers for the above referenced project. This work can be performed, if a decision can be reached on this matter by April 28, 1989, for the cost of $2,300.00. Time is of the essence so as to prevent delays in equipment fabrication and delivery. A brief cost summary is listed below with a detailed breakdown attached for your review. Pyca Industries, Inc. $1,970.00 Bonds & Insurance 30.00 Subtotal $2,000..00 Cajun 15% 300.00 Total Change Order Cost $2,300.00 Your review of and response to this change order request at your earliest possible convenience shall be appreciated. Should you have any questions, please do not hesitate to call. Sincerely, CAJUN CONTRACTORS, INC. Karl D. Hirschey Project Manager cc: Field File 16.00 (8821) RO. BOX 59354 · DALLAS, TEXAS 75229 ° (214) 357-4533 FAX: (214) 350-4280 ELECTRICAL ~blished 1969 March 28, 1989 Mr. Karl Hirschey Cajun Contractors and Engineers Inc. P.O. Box 540487 Dallas, Texas 75354 Re: Coppell Village Parkway Pump Station Subject: Change per your letter dated February 28, 1989. Dear Karl; As per your request I am attaching a copy of our cost breakdown for the emergency shut down proposal. Our cost will increase our contract by $1,970.46. Please let me know with in 30 days your decision on this so no delay will occur. Very Truly Yours Pyca Industries, Inc. President ;)(]'FED ITEMS: SWITCHGEAR 750o00 4,00 ]THER :~1 285,00 11.50 JB-TOTAL 1,090.74 21 ~I_ES TAX 0.00% 0.00 UB-TOTAL 1 ~ 090,74 21.60 ]N-PF{ODUCTIVE LABOl:~ HOURS; rR6VEL TlblE 4.00 JB-'rOTAL 1,090.74 25,60 DURLY RATE l~ $15,00 384,00 '-" 1,0~0,74 384.00 JB I O'I'AL DB EXF'ENSESI ;'~YROLL/INS ~ 21.60 % 82.74 ~ ~0 ~L 1,557.68 JB-CONI'RACI': ' : 1,557.68 IB-TOI'AL f~RKUP: H6TERIAL 15,000 % on ,j ,..,=' ""' . 74 8.36 :.~lJO'rEh MTI_ -1.5,000 % on 1,035000 155.25 [.Ali{OR 15.000 % on 384.00 57.60 JOD FXPENSE 15.000 % on 82.94 12.44 UB-TOTAL 1,771 PROFIT 10.000 % on 1,791..3;.{ 179.13 ID SUMMARY TOTAL $1,970.46 OB '-~- 591" COF'F'ELL W P S ys'bem, ~. ~2 CHANGE PROPOSAL I: 1 HATER I t~L HATER I AL LABOR LRBOR ESCR I PT I ON [IU~NT I TY UN I T TOT AL UN [ T TOTAL THHN/THWN STR CU 1'~,. 237 0.06~ i4.4& 0.0040 OTALS 14.46 '. F'~GE ;Of'-" -'~- 5%1 COF'PELL W P S i.;y~'t¥.'r., '--I: 22 CHANGE PROPOSAL H R'I' EI"~ I :~E SCR I Pl'I ON [~UANI' I TY LIN I T TOTAL UN I 1' TOTAL :'VC SCH 40 SLA[{/UGRI) 5/4' 50 0.165 4,95 0,0500 0,90 -'VC AI'IAF'TERS (F'EHALE) 5/4' 4 0.297 1..19 0,1000 0,40 JF~C NO SUPPORT 3/4' 15 0,660 9,90 0,0450 0,65 JI'-~C 90 ELBOW J/4' ~ 1o644 9,86 0,3~00 2.16 }F~C COUPLINGS 5/4' 12 0,550 6,60 I_[]CKNUT 3/4' 4 0,108 0,43 0,0500 0,12 BONi'IINO T'{USI"II NBS 5/4' 4 2,088 8,55 0,2500 0,92 'OTALS 41 , 28 5,15 PRICING SHEET ESTIMATE NO ~STIMATED BY - ~-Io~~ _1 ........... U---, ......... LL-,.--L-I .... )~.~_L~: - I _._~: ~: ........ ~ ._.[_._¢o .~ ...... 1 .... l_.l._i~I ~'~ ~~'~ ~ ~ ~ ........... I ..... I ....... ............ = .......... ~.-~1 . I ...... I.. i._i __11 - ~ ',~l :1i ~ ~'~' ~~~' ~- ..................................... ~---t--~--~' ~ .... ~~ ~ ~ ~ L~ ~ - _. ~_ .... ...... ~' ........................I ..................... ' ...... t " --'-'1 ~ ..... ~-- ................... ....... [ ......................... , .... .... - ---' ...... " ..... t ........................ ~ .... ~--- ................................ I .... i ............................ ...... ~1 .... - - ................ ~ .......... GINN, INC. CONSULTING ENGINEERS February 24, 1989 Mr. Karl D. llirschey Cajun Contractors, Inc. Dallas, Texas 75354-0487 Re: Village Parkway Pump Station ~CAJUN city of coppell, Texas DALLAS Proposed Change Order - Electrical Breakers Dear Mr. Hirschey: We have been requested by the City of Coppell's Building Inspection Department to investigate the possibility of adding remote trips for the' main service breakers on the above referenced project. Enclosed is a letter from C.R. McCreary and Associates which outlines the additional materials required for this modification. Please review the enclosure and prepare a proposal for this work. Upon receipt of your proposal, we will discuss the matter with the city of Coppell and determine if a formal change order will be pursued. Please call if you have any questions. Sincerely, Sanford W. Case, P.E. Project Manager -enclosure cc: Russell Doyle, P.E. Steve Goram Dale Jackson Joe Kotrla, P.E., C.R. McCreary and Associates H. Wayne Ginn, P.E. Gabe Favre J.R. Richardson File 380 17103 Preston R. oad · Suite 100 · LIi 118 · Dallas, Texas75248 · Pho.c 214/248-4900 ::- FILE COPY / CONSULTING ENGINEERS ' SUITE 2]7 CHAR/ES R. /I//cCREARY & ASSOCIATES / ~3~0 LBJ FREEWAY /.. DALLAS, TEXAS 7524[7 ~ 2]4/458-8745 ,., .i/ '! J!' 'I, II February 17, 1989 Mr. Sanford Case, P.E. Ginn, Inc. 17103 Preston Rd., Suite 100 Dallas, Texas 75248 Re: Village Parkway Pump Station City of Coppell, Texas- Subject: City of Coppell Electrical Ordinance Dear Sanford, I met with Mr. Dale Jackson of the City of Coppell earlier this week regarding the City ilectrical Ordinance. lie gave us permission to let the main breakers be tripped from the outside of the building. Please initiate a change to do this. The breakers are already specified to be electrically operated, so all we have to do is add the pushbuttons, control wiring, and the enclosures. The contractor will need to do the following: 1. install a 3/4 inch conduit with 5 # 12 awg control wires from the switchgear to a NEMA 3R enclosure on an outside wall. The conduit should be in the slab. The enclosure should be on the outside building wall inside of the fence next to the double doors for the switchgear room. 2. The Enclosure shall be NF~tA 3R at least 10'l tall by 8" wide by deep, Hoffman # A-10R86HCR with a # A-10NSP backpanel. The pushbuttons shall be red in color, maintained type (push to trip, pull to reset) with a mushroom head, Square D class 9001 type SK. Each pushbutton shall be mounted in a Square D class 9001 type KY enclosure inside the Hoffman enclosure. Each pushbutton shall trip its respective main. The pushbutton shall not re-close the main when it is reset, however it will be required to be reset before the breaker can be manually re-closed from the inside. 3. The outside of the enclosure shall have an engraved nameplate stating "MAIN BREAKER REMOTE TRIP" with white 1" high letters on a red background. Inside the pushbuttons shall have nameplates stating "MAIN BREAKER # 1 TRIP" and "MAIN BREAKER # 2 TRIP" white 1/4I' high letters on a red CtlARLES R. /t//cCREARY & ASSOCIATES background. Also, there shall be a nameplate on the inside door of the Hoffman enclosure stating "BREAKERS CAN ONLY BE CLOSED MANUALLY AFTER TRIP". Pleas~ call if you have any questions or if I can be of any assistance. Sincerely, Joseph Kotrla, P.E. page 2 of 2 ::- " FILE COPY' ;:. CONSULTING £NGIN£ER$ f SUITE 217 CHAR/ES R. /I//cCREARF & ASSOCIATES ,,.:' ~]o LB] FREEWAY O,~LC4S, TEX4S 7~40 214/45~.~745 February 16, 1989 Mr. Dale Jackson City of Coppell P.O. Box 478 .. Coppell, Texas 75019 Re: Village Parkway Pump Station City of Coppell, Texas Subject: City of Coppell Electrical Ordinance Dear Mr. Jackson, This ~s to conf~.rm our discussion on Monday the 13th of February, 1989. in order to comply with the City of Coppell's electrical ordinance we will initiate a change to install remote trip pushbuttons for each main breaker. These pushbuttons will be on the outside o~ the building in a lockable enclosure. The outside of the enclosure will have a permanent nameplate stating "MAIN BREAKER REMOTE TRIP" in white letters 1" tall on a red background. Inside two emergency type pushbuttons will be marked "MAIN BREAKER # 1 TRIP" and "MAIN BREAKER # 2 TRIP". Please notify us if you have any questions or comments. Sincerely, ~rla, P.E. CC: Mr. Sanford Case, P.E. Ginn, Inc. 17103 Preston Rd., Suite 100 Dallas, Texas 75248