Loading...
COS Lutheran-CS 981217CASE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CHRIST OUR SAVIOR LUTHERAN CHURCH SITE PLAN P & Z HEARING DATE: C.C. HEARING DATE: LOCATION: SIZE OF AREA: December 17, 1998 January 12, 1999 Along the east side of S. Heartz Road, approximately 450 feet south of E. Sandy Lake Road. 4.936 acres of property; Existing buildings - 15,959 sf New building - 15,264 sf Total proposed building size 31,224 sf CURRENT ZONING: SF-12-S.U.P. (Single Family-12, Special Use Permit) REQUEST: Site Plan approval. APPLICANT: Owner: Engineer: Chrst Our Savior Lutheran Church & School Brockette, Davis, Drake, Inc. 104 E. Heartz Road 4144 N. Central Expwy. #1100 Coppell, TX 75019 Dallas, TX 75204 (972) 462-0225 (214) 824-3647 FAX: (972) 462-0881 FAX: (214) 824-7064 HISTORY: The property was platted in June of 1988. In November of 1989, the property was rezoned from SF-12 to SF-12-Special Use Permit, to allow the operation of a church, day nursery and school. TRANSPORTATION: Heartz Road is a C2U, 2-lane undivided collector street contained in 50' of right-of-way. SURROUNDING LAND USE & ZONING: North- South - East- West - Texas District Lutheran Church; "O" Office vacant; PD-SF-7 vacant; PD-SF-7 Braewood West residential subdivision; SF-7 Item # 8 COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for Public and Institutional uses. DISCUSSION: The church wishes to expand its facilities. The new 15,000 sf addition faces Heartz road and adjoins the existing building. Once the addition is completed the church will have a sanctuary that will seat 293 people, a fellowship hall, approximately 17 classrooms and a number of church and school offices. The face brick, metal roof, windows, gutters, and downspouts shown on the new addition will match the existing building. The church is also proposing to add a total of 17 new parking spaces, of which 3 will be handicap spaces. A new driveway is being created off Heartz Road that will tie in with an existing on-site driveway. Staff would like to point out that in July of this year, the applicant obtained a variance from the Board of Adjustment to allow a temporary 1,200 sf shade structure for a period not to exceed 24 months. The shade structure covers existing play equipment. During the Board of Adjustment meeting, a representative for the church explained that once the church addition was complete, the playground equipment will be moved to an inner courtyard area. The new courtyard area would have permanent masonry pillars that will be in compliance with city code. The applicant has indicated on the plans that the existing canvass covered shade structure will be removed once the new addition is in place. The applicant will have to modify the landscape plan to indicate the size of the existing trees on site, as well as indicate the location of the existing monument sign. Staff requests that on the building elevations the applicant relocate the new electrical box shown on the southwest elevation to a more inconspicuous location on site. The box as shown is too visible from Heartz Road. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: The planning staff recommends approval of the site plan subject to the following conditions being met: 1) 2) 3) 4) 5) Modify the landscape plan to indicate the size of the existing trees on site. Relocate the new electrical box shown on the southwest elevation to a more inconspicuous location on site. All portions of the building are to be within a 150 feet of a fire lane. (See Fire Department Comments) An additional fire hydrant may be required. (See Fire Department comments) Roadway impact fees will be required for the new building. (See Engineering Department comments) Item # 8 6) 7) New paving will have to meet requirements of the Coppell Subdivision Ordinance. (See Engineering Department comments) Provide ADA ramps at driveways. (See Engineering Department comments) ALTERNATIVES: 1) Recommend approval of the request 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Site Plan 1) Utility Plan 2) Paving and Grading Plan 3) Landscape Plan 4) Building Elevations 5) Departmental Comments Item # 8 ITEM: DRC DATE: CONTA CT: COMMENT STATUS: DEVELOPMENT REVIEW COMMITTEE FIRE PREVENTION COMMENTS CHRIST OUR SA FTOR LUTHERAN CHURCH NOVEMBER 24, 1998 TRA~7$ CRUMP, ~RE MARS~ (214) $0~$5~ F/NAL All portions of the building arc to be within 150 feet of a fire lane. An additional fire hydrant may be required. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Christ Our Savior Lutheran Church, Site Plan Review, to allow the development ora 15,265 sf addition consisting ora sanctuary, fellowship hall, classrooms and offices on 4.956 acres of property, located along the east side orS. Heartz Road, approximately 450' south of E. Sandy Lake Road, at the request of Brockette, Davis, Drake, Inc. ! DRC DATE: November 24, 1998 and December 3, 1998 CONTACT: Mike Martin, P.E., Assistant City Engineer (972-304-$679) COMMENT STA TUS: r~ ~r r~,~r~ r A r~ v ~ FINA L 1. Roadway impact fees will be required for the new building addition. 2. New paving will have to meet requirements of the Coppell Subdivision Ordinance. 3. Provide ADA ramps at driveways.