Loading...
Rosebriar-CS130311 T H E C 1 T Y O F COPPELL, ,,,,„,, ,,,-- .-.-„,._,,, * ..a._„,„ .,,,, , ,,,.__ „ o x a March 11,2013 Kenny Hafner Rosebriar Development, LLC 300 E. Carpenter Fwy, Ste 940 Irving TX 75062 RE: Rosebriar Estates Final Acceptance Dear Mr. Hafner: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bonds and record drawings have been received. Maturity on the bonds will be two years from the date of this letter. The Erosion Control bond will be in effect until all lots in the subdivision are developed. You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT)to discontinue coverage under the SWPPP permit. A follow-up inspection of the facilities will be conducted prior to the expiration of the two-year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely, L. , f a 's Cons, don I ..- or Offi∎e Pone: (972 304-3684 Fax (9 )304-3570 cc: Ken Griffin,P.E.,Director of Engineering&Public Works Glenn Hollowell, P.E.,Asst. Director of Public Works Michael Garza,P.E., Civil Engineer Tim Oates, Deputy Chief/Prevention Michael Arellano, Chief Building Official Jennifer Miller, Finance Director 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673