Rosebriar-CS130311 T H E C 1 T Y O F
COPPELL, ,,,,„,,
,,,-- .-.-„,._,,, * ..a._„,„ .,,,,
, ,,,.__ „ o
x a
March 11,2013
Kenny Hafner
Rosebriar Development, LLC
300 E. Carpenter Fwy, Ste 940
Irving TX 75062
RE: Rosebriar Estates
Final Acceptance
Dear Mr. Hafner:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for
the referenced project. The two-year maintenance bonds and record drawings have been received.
Maturity on the bonds will be two years from the date of this letter. The Erosion Control bond will
be in effect until all lots in the subdivision are developed.
You may notify the MS4 (City of Coppell) at any time during the two-year maintenance period if
stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a
Notice of Termination (NOT)to discontinue coverage under the SWPPP permit.
A follow-up inspection of the facilities will be conducted prior to the expiration of the two-year
bond period. If any punchlist items are noted at that time, you will be contacted to make repairs.
Thanks for your cooperation.
Sincerely,
L. , f a 's
Cons, don I ..- or
Offi∎e Pone: (972 304-3684
Fax (9 )304-3570
cc: Ken Griffin,P.E.,Director of Engineering&Public Works
Glenn Hollowell, P.E.,Asst. Director of Public Works
Michael Garza,P.E., Civil Engineer
Tim Oates, Deputy Chief/Prevention
Michael Arellano, Chief Building Official
Jennifer Miller, Finance Director
255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673