Loading...
COS Lutheran-CS 890831The City With A Beautif PRE-CONSTRUCTION PACKET P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 ATTENDANCE SHEET NAME: COMPANY: PHONE: (~) PRECONSTRUCTION MEETING Christ Our Savior Lutheran Church Minutes of Meeting Held August 31, 1989 Present: Larry Davis-City of Coppell, Glenn Fabian- TU Electric, Barbara Boone- City of Coppell, Don Beverlin- COS Lutheran Church, Oliver "BUB" Murray- Murray Construction, Bryce Penland- Clay Construction, James Rainey- City of Coppell, Howard Pafford- City of Coppell, Jacento Reyes- Service Associates ITEM 1: Call to Order - The meeting was called to order by Larry Davis at 1:49 p.m.. ITEM 2: Sign In Sheet - Everyone signed in, presence. acknowledging their ITEM 3: Introduction - Each individual introduced their respective employers. themselves and ITEM 4: Larry Davis made a public apology for failing to have the utility companies (i.e. Lone Star, Paragon, GTE) contacted. (Staff shortage- unavoidable). ITEM 5: TU Electric - Glenn Fabian with TU Electric made the comment that all plans were okay. The only exception is that TU is in need of documented information stating that the plans include the design be able to expand. ITEM 6: Contractors - Discussion concerning the testing of the utilities. It was decided that the video test requirement would be waived due to the fact that only 30' of sewer was being laid. The street cut and street patching was then discussed and Larry Davis referred the contractor to Per Birdsall, Street Superintendent for permitting. Contractor asked to use 6" x 2"- 3 way iron fitting for the 2" tie in into the 6" line, Water Utilities Superintendent, Howard Pafford, asked that he use a dull 6" x 2" compact ductile iron fitting (4 way)- all parties in agreement. The Superintendent also asked the contractor that the fire hydrants match the existing hydrants in the area. Contractor will submit a drawing from Dalworth (6'd - 5'w and 1' from outside of wheel on valves). Howard Pafford informed the Contractor that he could get 2" water service details from his office. ITEM 8: Paving/Excavation - Larry Davis informed contractor densities are required. Xerox copies of the test will need to be distributed to the Inspector, Engineer and to Murray Construction. Mix design required for concrete, submittal from producer needed. Sanitary sewer lines will be PSI 4 lbs. Infiltration- Mandrel / 33 ft. Inspector to be present. Televising- Waived Main Inst. / Taps Only - no bact - No PSI test on 2" Public Protection: Barricades (traffic/work zone) needed. Flagmen will be required on site - no exceptions-. Trench Safety- Follow Ail Rules ITEM 9: Warning - Initial Notice of Problem will be verbal and written notification, second notice of problem will be asked to halt all work/ actual stoppage. ITEM 10: Fire Dept. - Siamese connection was discussed. Check with Dale Jackson- 240 ft. to the fire line (i.e. St. Ann's Catholic Church, Minyards, Stock Tab) ADJOURNMENT CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: DATE: TIME: ASSIGNED INSPECTOR: I. AI~FENDANCE: II. (See Attached List) PLANS FURNISHED TO: A) CITY YES B) CONTRACTOR YES C) C~NER YES III. IV. Ve UTILITY COMPANIES NOTIFIED: A) TELEPHONE B) GAS C ) ELECTRIC D) CABLE T.V. E ) OTHER STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES HIGHWAY PERMIT YES RAILROAD PERMIT YES STREET CUT PERMIT YES BORING PERMIT YES INSPECTION: A. B. DAILY INSPECTION BY ASSIGNED INSPECTOR AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST 5WENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SEWER/STORMSEWER/ PAVING CONSTRUCTION BEGINS. NO NO NO NO NO NO NO NO (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. ,APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES __ IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-T~O (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: IX. A. REQUIRED YES B. TRAFFIC DETOUR YES C. WARNING LIGHTS YES IF STREET DEPARTMENT HAS TO COME OUT TO MOVE Mo THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMIYTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. INFORMATION: DEVELOPER: NO NO NO NO NAME: ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3) GENERAL CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES DATE AS-BUILT DRAWINGS - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK SHEET COMPLETED/ STREET ASSESSMENTS WATER AND SEWER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: LEYTER OF ACCEPTANCE WRITTEN DATE: LETI~ER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMITTING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVEMENT, STRENGTH, THICKNESS SCREEN WALL. DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPP~LL ENGINEERING DEPARTMENT. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FITTINGS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL. 4' BURY ON HYDRANTS. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS). COLOR CODE HYDRANTS, TOP BONNET AND CAPS. CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. TEMPORARY SANITARY FACILILTIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE CON~4ITTMENT. LANDSCAPE MAINTENANCE AGREEMENT. PRE.CNSTRCTN. PZAGN (5) August 25, 1989 Mr. Russell Doyle, P.E. CITY OF COPPELL City Engineer P.O. Box 478 Coppell, Texas 75019 Re: CHRIST OUR SAVIOR LUTHERAN CHURCH Building Project, 150 Heartz Road 'Pho,.~. ~ This letter will serve to summarize the variances approved by the City Council regarding the above at the council meeting of August 8th: 1. Concrete paving of parking lot and fire lane approved to be five inches thick 2. Five inches of crushed rock as a substitute for five inches of concrete paving in parking area bounded by fire lane (see yellow highlight on attached site plan). Concrete paving in this area will be scheduled for Phase II consmaction. 3. 410 linear feet of sidewalk along Heartz Road to be omitted until Phase H consuuction (see attached highlighted area). This should assist in ke~ping'sll concerned adequately informed. If there am any tin'diet qu~lim~ or ¢lafificatkms necessary please contact Blessings, CHRIST OUR SAVIOR L~ CHURCH k..OMIT NEABTZ AUG 2 5 1989