PRE-CONSTRUCTION PACKET
P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
ATTENDANCE SHEET
NAME: COMPANY: PHONE:
(~)
PRECONSTRUCTION MEETING
Christ Our Savior Lutheran Church
Minutes of Meeting Held August 31, 1989
Present: Larry Davis-City of Coppell, Glenn Fabian- TU Electric,
Barbara Boone- City of Coppell, Don Beverlin- COS Lutheran Church,
Oliver "BUB" Murray- Murray Construction, Bryce Penland- Clay
Construction, James Rainey- City of Coppell, Howard Pafford- City
of Coppell, Jacento Reyes- Service Associates
ITEM 1: Call to Order - The meeting was called to order by Larry
Davis at 1:49 p.m..
ITEM 2: Sign In Sheet - Everyone signed in,
presence.
acknowledging their
ITEM 3: Introduction - Each individual introduced
their respective employers.
themselves and
ITEM 4: Larry Davis made a public apology for failing to have the
utility companies (i.e. Lone Star, Paragon, GTE) contacted. (Staff
shortage- unavoidable).
ITEM 5: TU Electric - Glenn Fabian with TU Electric made the comment
that all plans were okay. The only exception is that TU is in need
of documented information stating that the plans include the design
be able to expand.
ITEM 6: Contractors - Discussion concerning the testing of the
utilities. It was decided that the video test requirement would
be waived due to the fact that only 30' of sewer was being laid.
The street cut and street patching was then discussed and Larry Davis
referred the contractor to Per Birdsall, Street Superintendent for
permitting.
Contractor asked to use 6" x 2"- 3 way iron fitting for the 2" tie
in into the 6" line, Water Utilities Superintendent, Howard Pafford,
asked that he use a dull 6" x 2" compact ductile iron fitting (4
way)- all parties in agreement. The Superintendent also asked the
contractor that the fire hydrants match the existing hydrants in
the area. Contractor will submit a drawing from Dalworth (6'd -
5'w and 1' from outside of wheel on valves). Howard Pafford informed
the Contractor that he could get 2" water service details from his
office.
ITEM 8: Paving/Excavation - Larry Davis informed contractor densities
are required. Xerox copies of the test will need to be distributed
to the Inspector, Engineer and to Murray Construction.
Mix design required for concrete, submittal from producer needed.
Sanitary sewer lines will be PSI 4 lbs.
Infiltration- Mandrel / 33 ft. Inspector to be present.
Televising- Waived
Main Inst. / Taps Only
- no bact -
No PSI test on 2"
Public Protection: Barricades (traffic/work zone) needed.
Flagmen will be required on site - no exceptions-.
Trench Safety- Follow Ail Rules
ITEM 9: Warning - Initial Notice of Problem will be verbal and written
notification, second notice of problem will be asked to halt all
work/ actual stoppage.
ITEM 10: Fire Dept. - Siamese connection was discussed. Check with
Dale Jackson- 240 ft. to the fire line (i.e. St. Ann's Catholic
Church, Minyards, Stock Tab)
ADJOURNMENT
CITY OF COPPELL
PRE-CONSTRUCTION CONFERENCE
PROJECT NAME:
DATE:
TIME:
ASSIGNED INSPECTOR:
I. AI~FENDANCE:
II.
(See Attached List)
PLANS FURNISHED TO:
A) CITY YES
B) CONTRACTOR YES
C) C~NER YES
III.
IV.
Ve
UTILITY COMPANIES NOTIFIED:
A) TELEPHONE
B) GAS
C ) ELECTRIC
D) CABLE T.V.
E ) OTHER
STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
EASEMENTS YES
HIGHWAY PERMIT YES
RAILROAD PERMIT YES
STREET CUT PERMIT YES
BORING PERMIT YES
INSPECTION:
A.
B.
DAILY INSPECTION BY ASSIGNED INSPECTOR
AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST 5WENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SEWER/STORMSEWER/
PAVING CONSTRUCTION BEGINS.
NO
NO
NO
NO
NO
NO
NO
NO
(2)
VI.
TESTING OF MATERIALS:
1. DENSITIES
2. ,APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII.
STREET CLOSING REQUIRED: YES __
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-T~O (72) HOURS IN
ADVANCE.
VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
IX.
A. REQUIRED YES
B. TRAFFIC DETOUR YES
C. WARNING LIGHTS YES
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
Mo
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMIYTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
INFORMATION:
DEVELOPER:
NO
NO
NO
NO
NAME:
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
DATE
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SHEET COMPLETED/
STREET ASSESSMENTS
WATER AND SEWER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
LEYTER OF ACCEPTANCE WRITTEN
DATE:
LETI~ER OF ACCEPTANCE WILL NOT BE WRITTEN UNTIL THE PUNCH LIST MADE FROM
THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMITTING:
AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER
TO THE CITY OF COPP~LL ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL
REPORTS ARE RECEIVED.
COR-TEN BOLTS IN FITTINGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS).
COLOR CODE HYDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINEERING DEPARTMENT.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE CON~4ITTMENT.
LANDSCAPE MAINTENANCE AGREEMENT.
PRE.CNSTRCTN.
PZAGN
(5)
August 25, 1989
Mr. Russell Doyle, P.E.
CITY OF COPPELL
City Engineer
P.O. Box 478
Coppell, Texas 75019
Re: CHRIST OUR SAVIOR LUTHERAN CHURCH
Building Project, 150 Heartz Road 'Pho,.~. ~
This letter will serve to summarize the variances approved by the City
Council regarding the above at the council meeting of August 8th:
1. Concrete paving of parking lot and fire lane approved to be five
inches thick
2. Five inches of crushed rock as a substitute for five inches of
concrete paving in parking area bounded by fire lane (see
yellow highlight on attached site plan). Concrete paving in this
area will be scheduled for Phase II consmaction.
3. 410 linear feet of sidewalk along Heartz Road to be omitted
until Phase H consuuction (see attached highlighted area).
This should assist in ke~ping'sll concerned adequately informed. If
there am any tin'diet qu~lim~ or ¢lafificatkms necessary please contact
Blessings,
CHRIST OUR SAVIOR L~ CHURCH
k..OMIT
NEABTZ
AUG 2 5 1989