Loading...
COS Lutheran-AG 890808Rev. ~-24-89 AGENDA R. E ?EST FORM c'rI~z COUNCTr. August 8~ 1989 II ITEM CAPTION: Discussion and 6onsideration of approval of a variance from Appendix A page Z1 Subdivision Ordinance and Appendix A page 44 B of the Subdivision Ordinance which concern parking lot paving requirements and sidewalk requirements. The variance is requested by Don Beverlin, President of Christ Our Savior Lutheran Church, for the property located at 150 I~eartz Road. SUBMITTED BY: ~,_,~--~'~ ~. (Dire~or' g ~tgnature) - EVALUATION OF ITEM: STAFF R. EP.: OTMER REP.: D.ale Jackson~ Chief, Building Official DATE: July 31~ 1989 ,. , Don Beverlin, President of Christ Our Savior Lutheran Church, is requesting 3 variances from the Subdivision Ordinance for the new Christ Our Savior Lutheran Church building. The variances are: 1~/~ The parking area will be 5 inches thick concrete rather than 6 inches of concrete. Z.~/~Ah::erti;onfOcfotnh; PtruTt~ionngtlhOet Wicru~shbe~CfocmkPOwS;~ ;ef rC~l~;~dr~;~r~~j;:~;te. During ./~'~. Delay the insta~of a sidewalk along Heartz Road until phase Z conStruCtion is begun. BasEd on 'the letter f~nnessey En§ineerin§ and the report from AlPha.teSting' Staff d°es-.: not object t° the reduction in concrete thickness from 6 inches to 5 inches. Staff recommends that if the Council approves the third variance request, the City should reserve the right to require a sidewalk to be installed at any time the City determines that a sidewalk is needed for pedestrian safety. BI.GET AMT.: COMJWENTS: AMT. ESTIMATED: AMT. +/- BUDGET: FINANCIAL REVlE~ BY: LEGAL REVIEW BY: AGEndA REQ FORM. 0588DS REVI~'ED BY CB: Item: CITY MANAGERS COMMENTS/RECOMMENDATIONS Council Meeting: 8-8-89 Initially, this request was made and based purely on the desire to save money. They were advised that this was an insufficient reason, and unless there was some justification from an engineering firm how this could be accomplished without causing a degradation in the durability of the parking lot, staff would not support the request. There was some initial concern over staff's position; however, the church has now secured an engineering report which supports that the variance could be granted without causing a structural problem. We, therefore, recommend your approval. July 24, 1989 Mr. Dale Jackson CITY OF COPPELL Chief Building Official 616-A South Coppell Road Coppell, Texas 75019 SUBJECT: Construction Variance Request Dear Mr. Jackson, It is requested that the City of Coppell consider and approve certain variances for the construction of Christ Our Savior Lutheran Church the 100 Block of Heartz Road. These variances are cost cutting measures necessary to get the project within our approved District budget. Therefore, we formally request the following variances: in (1) Pour concrete firelane paving five (5) inches thick versus six (6) inches thick. (2) Substitute crushed rock for five (5) inch concrete paving in parking lot area bounded by firelane. Five (5) inch concrete paving of parking lot will be scheduled for Phase II construction. (3) Omit installation of 410 linear feet of sidewalk along Heartz Road. Sidewalk will be scheduled for Phase II construction. It is our understanding thatthese itemswill be addressed at the City Council meeting scheduled for August 8, 1989. Your consideration and approval of these items will greatly assist our budget and building efforts. We look forward to your favorable reply. Blessings, CHRIST OUR SAVIOR LUTHERAN CHURCH D~n~ld C. B~v~rlin President DCB/kb August 3, 1989 Mr. Dale Jackson CITY OF COPPELL Chief Building Official 616-A South Coppell Road Coppell, Texas 7,5019 SUBJECT: Phase II Construction REFERENCE: Phone Conversation August 3,1989, 10:00 am Dear Mr. Jackson, Per our phone conversation this morning, this will establish Christ Our Saviors time table regarding Phase II Construction. Based on current growth trends, we anticipate Phase II Constructiion for Fourth Quarter 1993. B_Jessings, X~HRIST OUR SAVIOR LUTHERAN CHURCH u-"Donald -C. Beverlin President DCB/jr HENNESSEY ENGINEERING, INC. 1409 THIRD STREET " CARROLI..TON, TEXAS 75006 · (214) 245-9478 August 2, 1989 Mr. Dale Jackson, Chief Building Official City of Coppell, Texas 616-A South Coppell Road Coppell, Texas 75019 Re: Christ Our Savior Lutheran Church - File No. 8594 Dear Mr. Jackson: The Church has requested that we review the drawings and specifications for a more cost effective program for building the Church. The following revision to the original design is requested: 1. Based on the subbase of the soil improved with 6" of 6% lime stabilization, 5 inches of concrete at 3,000 P.S.I. with reinforcing at 24" c.c. will perform as well as 6 inches of concrete at 3,000 P.S.I. with reinforcing at 24" c.c. The fire lane has adequate slope for drainage and the Church plans to maintain the surface well, so that good fire protection can be provided for the facility. We look forward to your acceptance of this construction cost reduction, and the Church does plan to pave the parking areas in Phase 2 to ensure the site functions well for the congregation. Yours sincerely, President PH/j h D.101:35 c.c. Mr. Russell Doyle, City Engineer, City of Coppell STRUCTURAL CIVIL PLANNING SURVEYING I I I I I ALPHA TESTING, INC. An AIl~no ~'¥ices Grou~ Compony 2209 Wisconsin St.. Suite I00 Dalla~ Texos 75229 214/620-8911 Metro 263.4937 June 13, 1988 Christ Our SaviOr Lutheran Church Building Committee 20g East Sandy Lake Road Coppell, Texas 75019 Attention: Mr. Jim Olsen Re: Geotechntcal Investigation SANCTUARY & EDUCATION BUZLDING COPPELL, TEXAS ALPHA Report Ho. 88152 Gentlemen: Submitted herewith is the report of our geotechnical investigation at the site of the referenced project. This study was authorized by Mr. Olsen on May 16, 1988. This report contains the results of our findings and an interpretation of the subsurface conditions disclosed with respect to developing geotechnical :?~' 'engineering design parameters for the project. Reconmmndations to aid design * ' r" and construction of foundations and other earth connected phases of this project .. ~._ are also addressed. · . We appreciate the opportunity to be of service to you on this project. If we Im can be of further assistance, such as providing our materials testing services during construction, please contact our office. AK/DAL: gt Copies: (1) Client (3) Clifton E. Owens Very truly yours, ALPHA TESTING, INC. Ali Khalilian, P.E. Geotechnical Engineer Manager of Engineering vices & Associates ! ! ! ! ! ! Ii ! for design of the post-tensioned slab. The edge moisture variation distance (em) for post-tensioned slabs constructed at this site would be about 5 ft according to information published by the Post Tension Institute. The slab should be designed with exterior and interior grade beams rigid enough for the foundation system used. A net allowable soil bearing pressure of 2 kips per sq ft may be used for design of all grade beams bearing in natural soils. In cases where grade beams bear on fill soils placed as recommended in Section 7~3, a reduced net allowable soil bearing pressure of 1.5 kips per sq ft should be used in selecting grade beam sizes. Also a moisture barrier of polyethylene sheeting or similar material should be placed between the slab and subgrade soils to retard moisture migration through the slab. 6.4 Pavements The clay soils encountered near the existing ground surface will probably constitute the subgrade for most of the parking and drive areas. Therefore, it is recommended that these soils be improved prior to construction of pavements. It is recommended that the existing clay soils in drive and parking areas be overexcavated to a depth equal to the thickness of the pavement section (asphaltic concrete or reinforced concrete). The exposed surface of the clays should be scarified to a depth of at least 6 inches and mixed with an estimated 6 to 8 percent of hydrated 15 lime (by dry unit weigh.t) in conformance with Texas Highway Department Item 260. The actual amount of lime required should be determined by additional laboratory tests. The soil-lime mixture should then be compacted to at least 98 percent of Standard Proctor maximum dry density (ASTM D 698) at or slightly above the optimum moisture content. ~In all areas where hydrated lime is used to stabilize the subgrade soils, routine Atterberg-limit tests should be performed to assure that the resulting plasticity index of the soil-lime mixture is at or below 12. The City of Coppell, lexas requires that plasticity index of lime stabilized subgrade should be below 12. California Bearing Ratio (CBR) tests have not been performed for this specific project, but our previous experience with similar soils indicates that the CBR value for lime stabilized clay will be in the range of 25 to 30. The CBR value for the natural untreated clay will be on the order of 3 to 4. Using the above CBR values, and assuming normal traffic for a 15-year project life, we provide the following pavement recommendations for the parking and drive areas. An asphaltic concrete pavement section constructed upon a lime stabilized subgrade could consist of at least 5.0 inches of asphaltic concrete, composed of 3.5 inches of binder under 1.5 inches of surface course in light duty (automobile) traffic areas. In areas where heavy truck traffic is expected, 6 inches of asphaltic concrete (4.5 inches of binder and 1.5 inches of surface course) should be adequate. In the event concrete pavements are used, the above recommended procedure for mechanical lime stabilization would also be required. Pavements could then consist of 5 inches of adequately reinforced concrete in both light duty and heavy truck traffic areas. All concrete for pavements should have a 28-day design strength of at least 3,000 psi. The calculations used to determine the required pavement thickness are based on only physical and engineering properties of the materials and conventional thickness determination procedures. Related civil design factors such as subgrade drainage, shoulder support, cross-sectional configurations, surface elevations, reinforcing steel, joint design and environmental factors will significantly affect the service life and must be included in the preparation of the constructed drawings and specifications. 6.5 Drainage Adequate drainage should be provided at the site to reduce seasonal variations in moisture content of the foundation soils. All pavements or sidewalks should be sloped away from the building to prevent ponding of water around the foundation. In order to enhance the performance of slabs underlain by select fill at this site, it is essential that every reasonable precaution be taken to inhibit infiltration of groundwater and surface water into the select fill. Past problems have been noted with slabs underlain by even extensive select fill thicknesses when poor drainage caused saturation of the select fill. In this instance the select fill can · , 17