Loading...
Villas at LV 2-LR121214 ALPHA ATESTING REPORT OF FIELD 2209 Wisconsin Street,Suite 100 COMPACTION TESTS Dallas, Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No.813 TESTED FOR: JBGL BF Development LLC DATE: 12/14/12 Dallas,Texas PROJECT: Villas at Lake Vista Phase 2-Utilities&Paving OUR REPORT NO.: 121732-13 MacArthur Boulevard and Lake Vista Drive Coppell, Texas TEST DATA: TECHNICIAN: J. Leighton TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT' NO. DEPTH NUMBER PCF PCF COMPACTION 93 12/14/12 SG 1 14.1 111.9 17.5 108 97 2-A 94 12/14/12 SG 1 14.1 111.9 15.8 106 95 2-A 95 12/14/12 SG 1 14.1 111.9 14.8 112 100 2-A 96 12/14/12 SG 1 14.1 111.9 16.7 106 95 2-A 97 12/14/12 SG 1 14.1 111.9 16.7 106 95 2-A 98 12/14/12 SG 1 14.1 111.9 14.7 108 96 2-A 99 _ 12/14/12 SG 1 14.1 111.9 15.0 112 100 2-A TEST LOCATION: 93 Snowshill Trail at Station 0+38 94 Snowshill Trail at Station 2+50 95 Snowshill Trail at Station 5+00 96 Snowshill Trail(Cul De Sac)at Station 0+38 97 Calcot Drive at Station 0+42 98 Calcot Drive at Station 1+55 99 Calcot Drive at Station 2+80 1. FILL 'A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Bulent Ethem,P.G. ALPHA TESTING,INC. Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shell not be reproduced and/or distributed except with express approval of ALPHA.The use of our name end test results must receive our written approval.Test results and reports apply only to the samples tested end/or observed,and are not indicative of the qualities of apparently identical or similar specimens. ALPHA TESTING REPORT OF FIELD 2209 Wisconsin Street,Suite 100 COMPACTION TESTS Dallas,Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No.813 TESTED FOR: JBGL BF Development LLC DATE: 12/14/12 Dallas, Texas PROJECT: Villas at Lake Vista Phase 2-Utilities&Paving OUR REPORT NO.: 121732-13A MacArthur Boulevard and Lake Vista Drive Coppell, Texas TEST DATA: TECHNICIAN: J. Leighton TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT` NO. DEPTH NUMBER PCF PCF COMPACTION 100 12/14/12 SG 2 16.1 108.5 19.2 97 90 2-B 101 12/14/12 SG 2 16.1 108.5 20.2 99 91 2-B 102 12/14/12 SG 2 16.1 108.5 18.6 100 92 2-B TEST LOCATION: 100 Chippin Way at Station 1+00 101 Chippin Way at Station 2+95 102 Cotswold Lane at Station 1+00 1. FILL *A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST 5tittuk Bulent Ethem,P.G. ALPHA TESTING,INC. Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA.The use of our name and test results must receive our written approval.Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens. ALPHA iikTESTING REPORT OF FIELD 2209 Wisconsin Street,Suite 100 COMPACTION TESTS Dallas,Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No.813 TESTED FOR: JBGL BF Development LLC DATE: 12/17/12 Dallas, Texas PROJECT: Villas at Lake Vista Phase 2-Utilities&Paving OUR REPORT NO.: 121732-14 Coppell, Texas TEST DATA: TECHNICIAN: J. Leighton TEST ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT DATE MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMMENT* NO. DEPTH NUMBER % PCF PCF COMPACTION 103 12/17/12 SG 2 16.1 108.5 20.2 103 95 2-AD 104 12/17/12 SG 2 16.1 108.5 21.9 103 95 2-AD 105 12/17/12 SG 2 16.1 108.5 20.1 103 95 2-AD• TEST LOCATION: 103 Retest of Test#100 Dated 12/14/12 104 Retest of Test#101 Dated 12/14/12 105 Retest of Test#102 Dated 12/14/12 1. FILL *A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Respectfully Submitted, 4. CEMENT TREATED D. RETEST Bulent Ethem,P.G. ALPHA TESTING,INC. Our test results and reports are for the exclusive use of the Client(and their designated recipients on file in our office)and shall not be reproduced end/or distributed except with express approval of ALPHA.The use of our name and test results must receive our written approval.Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens.