Loading...
Villas at LV 2-LR130118 ALPHA / TESTING DAILY FIELD REPORT 2209 Wisconsin Street,Suite 100 Dallas,Texas 75229 Geotechnical I Construction Materials I Environmental www.alphatesting.com TBPE Firm No.813 TESTED FOR: JBGL BF Development LLC DATE: 01/18/13 Dallas, Texas PROJECT: Villas at Lake Vista Phase 2- Utilities&Paving OUR REPORT NO.: 121732-29 Coppell, Texas TECHNICIAN: R.Jenkins WEATHER: Clear TEMPERATURE RANGE : 50-60 Degrees The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested. Upon arrival at the site, the technician was informed that previously scheduled concrete testing cancelled for inlets. Respectfully Submitted, . 94/14/1/2 Bulent Ethem, P.G. ALPHA TESTING, INC. Our test results and reports are for the exclus Iva use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except with express approval of Alpha.The use of our name and test results m ustreceive our written approval.Test results and reports applyonlyto the samples tested and/or observed,and are not indicative oftlre qualities ofapparentlyidentical or similar specimens.