Villas at LV 2-LR130118 ALPHA / TESTING DAILY FIELD
REPORT
2209 Wisconsin Street,Suite 100
Dallas,Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: JBGL BF Development LLC DATE: 01/18/13
Dallas, Texas
PROJECT: Villas at Lake Vista Phase 2- Utilities&Paving OUR REPORT NO.: 121732-29
Coppell, Texas
TECHNICIAN: R.Jenkins
WEATHER: Clear TEMPERATURE RANGE : 50-60 Degrees
The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested.
Upon arrival at the site, the technician was informed that previously scheduled concrete testing cancelled for inlets.
Respectfully Submitted,
. 94/14/1/2
Bulent Ethem, P.G.
ALPHA TESTING, INC.
Our test results and reports are for the exclus Iva use of the Client(and their designated recipients on file in our office)and shall not be reproduced and/or distributed except with express approval of Alpha.The use of our name and
test results m ustreceive our written approval.Test results and reports applyonlyto the samples tested and/or observed,and are not indicative oftlre qualities ofapparentlyidentical or similar specimens.