Villas at LV 2-LR121115 ALPHA \ TESTING DAILY FIELD
REPORT
2209 Wisconsin Street,Suite 100
Dallas,Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: JBGL BF Development LLC DATE: 11/15/12
Dallas, Texas
PROJECT: Villas at Lake Vista Phase 2- Utilities&Paving OUR REPORT NO.: 121732-1
Coppell, Texas
TECHNICIAN: B. Shockley
WEATHER: Clear and Cool TEMPERATURE RANGE : 40-50 Degrees
The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested.
The Technician provided proctor material verification at Utility Line Excavation with Owner present.
10/16/12- Block A, Pad 44 1)Brown and Tan Sandy Clay 111.9 at 14.1
10/16/12-Block A, Pad 40 2)Dark Brown and Gray Sandy Clay 108.5 at 16.1
10/16/12- Block P Pad 9 3) Light Brown and Dark Brown and Gray Clay 98.3 at 21.2
Based on observation,we have samples at locations representative of our proctor list.
The material at the West side of Line matches proctor#3 and the material at the East side of Line matches proctors 1 and 2.
No additional proctors picked up...
Respectfully Submitted,
5111"1")
Bulent Ethem, P.G.
ALPHA TESTING, INC.