Villas at LV 2-LR130124 ALPHA / TESTING DAILY FIELD
REPORT
2209 Wisconsin Street,Suite 100
Dallas,Texas 75229
Geotechnical I Construction Materials I Environmental
www.alphatesting.com
TBPE Firm No.813
TESTED FOR: JBGL BF Development LLC DATE: 01/24/13
Dallas, Texas
PROJECT: Villas at Lake Vista Phase 2 OUR REPORT NO.: 121732-33
- Utilities& Paving
Coppell, Texas
TECHNICIAN: Hossein Heidari
WEATHER: Sunny TEMPERATURE RANGE : 75°F
The Alpha technician traveled to the above referenced site to monitor ongoing work and perform field testing as requested.
Upon arrival at the site, the technician was informed that previously scheduled concrete testing would not be required for inlet
due to Plant did not have enough truck to cover job.
Respectfully Submitted,
Bulent Ethem, P.G.
ALPHA TESTING, INC.