Loading...
Villas at LV 2-LR130117 Alpha Testing, Inc. 2209 Wisconsin St., Suite 100 Concrete Compression Test Dallas,TX 75229 (972)620-8911 Report TBPE Firm No.813 Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-15 ATTN: SCOT WHITWER 3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G. DALLAS,TX 75205 Fax Number: (214)383-1117 Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE FIELD DATA Placement Location: PAVING,COTSWOLD LN.FROM STATION 1+58.11 TO 0+85.33 Sample Location: @ STATION 1+50 Date Placed: 12/20/2012 Plant Number: 955 Time Placed: 8:49 AM Delivery Ticket No.: 64334711 Slump(ASTM C-143): 3.0 Mix ID: 1701 Air Content: 5.1 (ASTM C-231) Made By: ALPHA Air Temperature: 41 Specimen Temperature: 59 Cured Specification: ASTM C-31 Date Received: 12/21/2012 Field Data Submitted By: Cranford,Jimi Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI: 9 LAB C-1231 12/27/201 7 8 N/A 4 12.56 68410 5450 10 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 80640 6420 11 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 77000 6130 12 LAB HOLD HOLD 8 N/A 4 12.56 0 Specifications: 28 3600 I Results to Date: PASS CC: GM Construction Respectfully Submitted By: of Alpha Testing,Inc. Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM C172,C143,C231,C173,C1064 AND C138.Compression strength tests per ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens. r ^. :3410, 1 1 71 4 X Alpha Testing,Inc. . ��� 2209 Wisconsin St., Suite 100 Concrete Compression Test Dallas,TX 75229 (972)620-8911 Report TBPE Firm No.813 Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-16 ATTN: SCOT WHITWER 3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G. DALLAS,TX 75205 Fax Number: (214)383-1117 Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE FIELD DATA Placement Location: PAVING,CHIPPING WAY FROM STATION 2+96.44 TO 0+46.20 Sample Location: @ STATION 1+50 Date Placed: 12/20/2012 Plant Number: 952 Time Placed: 11:09 AM Delivery Ticket No.: 62941538 Slump(ASTM C-143): 2.5 Mix ID: 1701 Air Content: 5.5 (ASTM C-231) Made By: ALPHA Air Temperature: 45 Specimen Temperature: 55 Cured Specification: ASTM C-31 Date Received: 12/21/2012 Field Data Submitted By: Cranford,Jimi Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI: 13 LAB C-1231 12/27/201 7 8 N/A 4 12.56 66310 5280 14 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 78840 6280 15 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 78470 6250 16 LAB HOLD HOLD 8 N/A 4 12.56 0 Specifications: 28 3600 Results to Date: PASS CC: GM Construction Respectfully Submitted By: 51111441 of Alpha Testing,Inc. Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM C172,C143,C231,C173,C1064 AND C138.Compression strength tests per ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens. .f,.f ' �' , ��I�t"eelcmg� .., . .t>i' `x �'' ��F, ,� � , t ..�. ��,e.� �..� +7. .,�`�� �_r�f#46 M. .. .. ...,, . _ � � ;fit� � Alpha Testing,Inc. 2209 Wisconsin St.,Suite 100 Concrete Compression Test Dallas,TX 75229 (972)620-8911 Report TBPE Firm No.813 Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-17 ATTN: SCOT WHITWER 3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G. DALLAS,TX 75205 Fax Number: (214)383-1117 Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE FIELD DATA Placement Location: PAVING,SNOWSHILL TRAIL @ STATION 0+38 Sample Location: @ STATION 1+25 Date Placed: 12/20/2012 Plant Number: 955 Time Placed: 12:40 PM Delivery Ticket No.: 64334738 Slump(ASTM C-143): 2.5 Mix ID: 1701 Air Content: 5.3 (ASTM C-231) Made By: ALPHA Air Temperature: 50 Specimen Temperature: 61 Cured Specification: ASTM C-31 Date Received: 12/21/2012 Field Data Submitted By: Cranford,Jimi Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI: 17 LAB C-1231 12/27/201 7 8 N/A 4 12.56 79740 6350 18 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 89000 7090 19 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 88640 7060 20 LAB HOLD HOLD 8 N/A 4 12.56 0 Specifications: 28 36001 Results to Date: PASS CC: GM Construction Respectfully Submitted By: of Alpha Testing, Inc. Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM C172,C143,C231,C173,C1064 AND C138.Compression strength tests per ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens. a s 0 O It) � n l s[If►g*Co tetr '_ :± 7.. TM , . 4, 68 X Alpha Testing,Inc. . .--%1 2209 Wisconsin St., Suite 100 Concrete Compression Test Dallas,TX 75229 (972)620-8911 Report TBPE Firm No.813 Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-18 ATTN: SCOT WHITWER 3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G. DALLAS,TX 75205 Fax Number: (214)383-1117 Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE FIELD DATA Placement Location: PAVING,COL COT DR.FROM STATION 0+37.12 TO 2+43.66 Sample Location: @ STATION 1+50 Date Placed: 12/20/2012 Plant Number: 955 Time Placed: 2:49 PM Delivery Ticket No.: 64334758 Slump(ASTM C-143): 2.5 Mix ID: 1701 Air Content: 5.2 (ASTM C-231) Made By: ALPHA Air Temperature: 53 Specimen Temperature: 60 Cured Specification: ASTM C-31 Date Received: 12/21/2012 Field Data Submitted By: Cranford,Jimi Mix Data Submitted By: LMC CYLINDER COMPRESSION TEST RESULTS Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI: 21 LAB C-1231 12/27/201 7 8 N/A 4 12.56 74380 5920 22 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 84430 6720 23 LAB C-1231 1/17/2013 28 8 N/A 4 12.56 91120 7250 24 LAB HOLD HOLD 8 N/A 4 12.56 0 Specifications: 28 3600 I Results to Date: PASS CC: GM Construction Respectfully Submitted By: tlUtibilof Alpha Testing, Inc. Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM CI72,C143,C231,C173,C1064 AND C138.Compression strength tests per ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the samples tested and/or observed,and yare not indicative of the qualities of apparently identical or similar specimens. a, r,� ;'; #,I 4,ILi _.,4 i#1 l s ****C****o . , ti .id t u a m er. f`'V „,{143