Villas at LV 2-LR130214 INk Alpha Testing, Inc. ( —>
2209 Wisconsin St.,Suite 100 Concrete Compression Test
Dallas,TX 75229
(972)620-8911 Report
TBPE Firm No.813
Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-25
ATTN: SCOT WHITWER
3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G.
DALLAS,TX 75205
Fax Number: (214)383-1117
Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING
SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE
HELD DATA
Placement Location: UTILITIES-INLETS
Sample Location: @ STATION 1+08.11
Date Placed: 1/17/2013 Plant Number: 952
Time Placed: 12:35 PM Delivery Ticket No.: 312757
Slump(ASTM C-143): 5.5 Mix ID: 1701
Air Content: 10.1 (ASTM C-173) Made By: ALPHA
Air Temperature: 48
Specimen Temperature: 55 Cured Specification: ASTM C-31
Date Received: 1/18/2013
Field Data Submitted By: DeVaul,Brian
Mix Data Submitted By: LMC
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI:
49 LAB C-1231 1/24/2013 7 8 N/A 4 12.56 40430 3220
50 LAB 2/14/2013 28 8 N/A 4 12.56 0
51 LAB 2/14/2013 28 8 N/A 4 12.56 0
52 LAB HOLD HOLD 8 N/A 4 12.56 0
Specifications: 28 4000 I
Results to Date: N/A
CC: GM Construction
Respectfully Submitted By: 5194/141 of Alpha Testing,Inc.
Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM C172,C143,C231,C173,C1064 AND C138.Compression strength tests per
ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or
distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the
samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens.
04iiit a';Engin er'lig;<Co s'(r}l tf 'Ll,�l` `r - . ' '',:Ailli414AROMOiliWZ7f1.4440
Alpha Testing, Inc. . -
2209 Wisconsin St., Suite 100 Concrete Compression Test
I Dallas,TX 75229
(972)620-8911 Report
TBPE Firm No. 813
Tested For: JBGL BF DEVELOPMENT LLC Our Report No.: 121732-25
ATTN: SCOT WHITWER
3131 HARVARD AVE.,SUITE 103 PM: BULENT ETHEM,P.G.
DALLAS,TX 75205
Fax Number: (214)383-1117
Project Desc:VILLAS AT LAKE VISTA PHASE 2-UTILITIES&PAVING
SE OF MACARTHUR BLVD.&LAKE VISTA DRIVE
FIELD DATA
Placement Location: UTILITIES-INLETS
Sample Location: @ STATION 1+08.11
Date Placed: 1/17/2013 Plant Number: 952
Time Placed: 12:35 PM Delivery Ticket No.: 312757
Slump(ASTM C-143): 5.5 Mix ID: 1701
Air Content: 10.1 (ASTM C-173) Made By: ALPHA
Air Temperature: 48
Specimen Temperature: 55 Cured Specification: ASTM C-31
Date Received: 1/18/2013
Field Data Submitted By: DeVaul,Brian
Mix Data Submitted By: LMC
CYLINDER COMPRESSION TEST RESULTS
Lab Cure Break Cap Date Age Avg. Avg. Avg Depth/ Area: Max
No.: Type: Type: Spec: Tested: (Days): Length Width Diameter Sq.In. Load: PSI:
49 LAB C-1231 1/24/2013 7 8 N/A 4 12.56 40430 3220
50 LAB C-1231 2/14/2013 28 8 N/A 4 12.56 51710 4120
51 LAB C-1231 2/14/2013 28 8 N/A 4 12.56 57190 4550
52 LAB HOLD HOLD 8 N/A 4 12.56 0
r Specifications: 28 4000 I
1 Results to Date: PASS
CC: GM Construction
Respectfully Submitted By: p3;t114t.9 of Alpha Testing,Inc.
Test Method:Unless noted,concrete was sampled and tested in accordance with ASTM C172,C143,C231,C173,C1064 AND C138.Compression strength tests per
ASTM C39. Our test results and reports are for the exclusive use of the Client(and their designated recepients on file in our office)and shall not be reproduced and/or
distributed except with express approval of ALPHA. The use of our name and test results must receive our written approval. Test results and reports apply only to the
samples tested and/or observed,and are not indicative of the qualities of apparently identical or similar specimens.
Geotechnical Engineering*Construction Materials Testing* Environmental Engineering*Consulting 144283