Loading...
Annual Report Cklist-07-08MS4 Phase 2 Annual Report Checklist Permit Number: TXR0403751TXR040053 Reporting Year. 2007 -2008 (Year 1) Permittee(s): City of Coppell /Northwest Dallas County Flood Control Dist. Yes / No / T. SWMP Overview N/A A. Signature and Certification: Does the signature meet the requirements of 30 TAC Section 305.128? Yes 1. For a municipality, state, federal, or other public agency, the report must be signed by either a principal executive officer or a ranking elected official, or by a person who has been properly authorized. Does the report include the following certification statement? "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Yes 2. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Yes 3. For a shared SWMP, is this a system -wide annual report that includes all permittees? If yes, did all permittees sign the report and were all of the above signatory requirements No 4. were met? (* The signature for NWDCFCD does not indicate the signer's title and therefore does not meet the requirement.) Yes B. If applicable, does the report indicate that the permittee is relying on another entity /ies to satisfy some of its permit obligations? No C. Did the permittee submit a copy of the annual report or cc: the TCEQ regional office? H. SWMP Implementation Did the permittee indicate that the SWMP was not yet implemented because the SWMP� No A. had not been approved by the end of Year I? Ong If "yes, "then skip items II.B. through H. J, and go directly to II.L. Yes B. Does the report include information on the status of compliance with permit conditions? No C. Does the report include an assessment of the effectiveness of the identified BMPs? No D. Does the report include information on progress towards reducing the discharge of pollutants to the maximum extent practicable (MEP)? Does the report include a summary of the results of any information (including No E. monitoring data) that was collected and analyzed during Year 1 to assess the success of the SWMP at reducing the discharge of pollutants to the MEP? Yes F. For MCM 1, Public Education and Outreach, does the report include documentation of the activities conducted and materials used to fulfill the MCM? For MCM 1, does the report document the amount of resources used to address each No G. group (e.g., visitors, residents, etc.)? (* The permittee listed the amount of resources used in each BMP but not the group(s) that they address.) (•luauua✓'inbod aqj laalu lou saop a�rofa�ragl puv 01111 s,dau�zs aql ajva7puz lou saop QjjoQ� .zof ddnivu�is aql *) L, podoid p pis �oql aiann pue a�ud uoiluogiliaolainluats u lugs saalliuuad agl jo Ilu3i puu ( ,,saA„ sung - £ •V •I •oN mall IsiploogD of aannsuu aql jl) podoi apron uialsXs u si uodai agl jr s3lsu malt sigl — •p d •I •oN mall IstlNoagD I :s;uatumoa Ieuoilippv ( djalv.mdas Z ivad ug paluawajdugz aq of sjMg jjv isy of spaau lnq uayM paluawajdiur aq of .[o paluaruajduq a.ry s lMg y; ri ym saivaj u1 aalilm.iad a l l .iodaa a o asinoa a 1 u aua 2utan a ulia un of suu d p �! �! .� y I �) �Z � P� P I sad aalliuuad oql lugl satlinilou aalunn uuols oql jo �aeuiuins u apnlout liodoi Iunuuu oql saoQ .ivaA Wuaad IxaN 'Al 4p4noadde aq uua satuega 3i auimialap of pa iinba i enaina i Iuuoilippe sI V/AI LdWAAS aql pannatnai ognn £ N /�I aalpm liuuod oql of paulwgns so2uugo polsonbai agl a.iann `olguoilddu lou si DON uu 3I Zpalliuzgns suns podoi Iunuuu oql lugl alup aql aaojaq panoiddu dWAAS oql suns `ou3I Z V /Al Lpalliuigns suns (DON) aBuugo jo aoilou e lugl aluotpui podw lunuuu aql saoQ I V /Al ::sad f� Z.iva� Buipodoi ftuzoo aql ui dW1AS oql of saBuugo pasodoid Xuu apnlout yiodoi sigl saoQ d oAI suotslAaH dIAIAAS III �poginlsip swou jo .iaquznu lulol agl apnlout Iiodw aql saoQ -g VIM Lsailin,ilou uoilonalsuoo ludioiunui jo .iaquinu aql apnlout liodoi aql sao(I T V/Al :nnolaq •g puu •u aannsuu `soX jj �WDW qlL aql oziltln aalltuuod aql saoQ Z ON Zuaiu p3luln2w aql uiglinn paun000 lugl (.ioluaado aql suns aalltuuad oql aaagnn asogl uugl.iaglo) sailintlou uotlongsuoo jo iogwnu aql apnlout podai oql saoQ i old :uoilonilsuoD "I Laalltuuod aql Xg poluauialdwi sa insuaui Io.iluoo luuotlippu Xuu jo snluls aql apnlout podo i oql saop `olquoilddu 3I X oA1 ffs)jvog ayl late dayl atoy inogv uozivtulofuz payviap adoui aq of spaau aja y,L «7vog laM,, sv dluo sjvog ajgv insvaus .rga yl ,8ulluauuajdtiq fo ssaaans ayl aglrasap sjvo2 ajgvinsvaw aq; fo lsoyll j :gulsszuz s1 lvgnt utvldxa `ou fl LsluoB olquinsuaui aql jo Ilu 2uiluauialduii jo swoons aql alunlun.a:vodai aql saoQ I oA1 : Sulssztu sl lvgat ulbjdxa `oufl LWDIN goua aoj sluo2 olquinsuaui aql lsil podai oql saoQ Sall Lsa2augosip .ialunn uuols -uou aql �/� .zoj pagstlqulsa on lugl suoilrpuoo puu sloiluoo pool agl agposop l.iodw oql saop `saX3I GsoBjugosip .ialunn uuols -uou alqunnollu 3o lstl u H o� apnloui uodai aql saop `(jaai) uoiluu,mita puu uoiloolaQ o2iugosiCl lioillI `£ Y� DW -io3 2. Checklist Item No. I. C. — This item asks if the MS4 has sent a copy of the annual report to the local TCEQ Regional office. If a copy of the annual report was not sent to your local TCEQ Regional office, please send a copy and provide conformation that it was sent. 3. Checklist Items II. C. & D. — The annual report needs to contain a statement or separate statements that will provide information about the effectiveness of the BMPs that the MS4 has identified for use and any progress made towards reducing the discharge of pollutants to the maximum extent practicable (MEP). 4. Checklist Item IL E. — This item is asking for the results of any information (including monitoring data) that was collected and analyzed during a permit year (year 1) to assess the success of the SWMP at reducing the discharge of pollutants to the MEP. The MS4 did not include the results of any monitoring data or other information in their year one (1) report that would assess the success of the SWMP at reducing the discharge of pollutants to the MEP. Please confirm that the MS4 will be collecting storm water monitoring data and providing additional information that will summarize the assessment of the success of the SWMP in remaining years of the permit. Checklist Item II. G. — The Year One (1) annual report from the MS4 does not include information about the amount of resources that were used to address each group (e.g., visitors, residents, etc.). (* The permittee listed the amount of resources used in each BMP but not the group(s) that they address.) 6. Checklist Item IL J. — The annual report included information about the measureable goals but did not provide information evaluating the success of implementing each measurable goal. Please provide additional information that will describe the outcomes and successes of the measurable goals of implemented BMPs. (* Most of the measurable goals describe the success of implementing their measurable goals only as "Met Goal. " There needs to be more detailed information about how they met the goal(s).) 7. Checklist Item II. L. 1. - This item is asking for the number of construction activities (other than those where the permittee was the operator) that occurred within the area that the MS4 regulates. Please provide additional implementation information for this requirement. Checklist Item IV. — This item requests that the MS4 provide a summary of the storm water activities, in the annual report, that the permittee plans to undertake in the following permit year. Provide this information in the form of a table that will provide information that will summarize the storm water activities that the permittee plans to undertake during the following permit year. (* In the course of the report the permittee indicates which BMPs are implemented or to be implemented when but needs to list all BMPs to be implemented in year 2 separately.) 9. Northwest Dallas County Flood Control District needs to supply information about the BMPs and Measurable Goals that they are implementing for MCM 6 and the appropriateness of those BMPs, the progress being made toward the measurable goals, ect. Please refer to the annual reporting template located at http: / /www.tceg.state.tx.us /assistance /sblaa /sw- ms4.html. The template will allow the permittee to create tables that list and provide the required information about the BMPs, measurable goals that were implemented during the permit term, etc. Reviewed by: Gordon Cooper 09/21/2009