Loading...
Red Hawk-CS120116i�� ax) V-�4�c- KADLECK & ASSOCIATES ENGINEERING PLANNING SURVEYING 2000 N. CENTRAL EXPRESSQAY, SUITE 113 PLANO, TEXAS 75074 972 -881- 0771/972 - 509 -1861 (FAX) TBPE FIRM NO. F- 6460/TBPLS REG. NO. 100555 -00 January 16, 2012 Mr. Michael Garza Engineering Department 255 Parkway Blvd. Coppell, Texas 75019 Re: Red Hawk Addition, Denton Tap Road, Coppell, Texas K &A Project 08528 Dear Mike, I have been furnished information regarding the placement of the sanitary sewer and water mains along Devon Drive within this project. Based on the information furnished by the surveyor doing the staking and the verification, the separation of the sanitary sewer and water mains does comply with the minimum of 10 feet center to center and /or 9 feet wall to wall. The sanitary sewer grades are as shown on the attached sheet. There were some fire hydrants moved and inlets shifted, but it is my understanding from Terry Holmes that he and Larry Davis (City Inspector) are in agreement on what is to be done for those items. We will eventually prepare as built plans for the project, which will reflect these results. Please contact me with any questions or comments. 4 ynre n Kadleck Kadleck & Associates Copy: Terry Holmes RED HAWK SANITARY SEWER GRADES The following is based on information furnished from the surveyor conducting the staking for the project. LINE A Station 0 +96.58 to Station 2 +76.52: 0.45% Station 2 +76.52 to Station 3 +52.78: 0.34% Station 3 +52.78 to Station 4 +16.50: 0.53% Station 4 +16.50 to station 7 +67.61: 0.42% Station 7 +67.61 to Station 11 +03.06: 0.45% Station 11 +03.06 to Station 11 +86.25: 3.35% Station 11 +86.25 to station 13 +41.04: 1.64% LINE B Station 0 +00 to Station 3 +00.82: 1.29% Station 3 +00.82 to Station 5 +47.82: 0.87% Station 5 +47.82 to Station 9 +66.3: 0.61% LINE C Station 0 +00 to Station 1 +19.24: 0.48%