Red Hawk Office-CS120402 (2)CREST STONE GROUP
April 2, 2012
Mr. Michael Garza
City of Coppell
Engineering Division
255 Parkway Blvd.
Coppell, Texas 75019
RE: ADA Ramps
Mr. Garza,
This letter is to inform the city that Creststone Group will not be installing the ADA ramps
at the following lots at this time. These lots are 14 /A, 23/A, 11 /B, 12 /B. and 28/B. The ADA ramps
will be installed by the builder when the house is either under construction or within the 2 -year
maintenance bond time period. Please contact us if you have any questions.
Sincerely,
t
David Hayes
225 East Highway 121, Suite 120, Coppell, Texas 75019
o. 214.488.5200 1 f. 214.488.5255