Loading...
Red Hawk Office-CS120402 (2)CREST STONE GROUP April 2, 2012 Mr. Michael Garza City of Coppell Engineering Division 255 Parkway Blvd. Coppell, Texas 75019 RE: ADA Ramps Mr. Garza, This letter is to inform the city that Creststone Group will not be installing the ADA ramps at the following lots at this time. These lots are 14 /A, 23/A, 11 /B, 12 /B. and 28/B. The ADA ramps will be installed by the builder when the house is either under construction or within the 2 -year maintenance bond time period. Please contact us if you have any questions. Sincerely, t David Hayes 225 East Highway 121, Suite 120, Coppell, Texas 75019 o. 214.488.5200 1 f. 214.488.5255