summary of our conversation during ~ meeting held
21, 1989. Those present includ~ yourself, Mr. Ben
;oppell, Engineering, Mr. Don Beverlin, President,
theran Church and Mr. B~ce Penland, Clay
nYwere(Generaladdressed.Contractor for Building Project). The
pment required for utilities tap at street (fire, water,
;fered to Mr. Howard Pafford, Water Utilities
I Mr. Steve Gorham, Director Public Works.
(2) Cutting street versus boring under street to tap utilities.
Refered to Mr. Pafford and Mr. Gorham.
(3) Installing south sewer drain (R.C.P. Line Q on Civil Drawings)
during Phase II Construction. It was concluded that this would not
be a problem provided grading was adequate.
Thank you for your time and guidance. We look forward to working with
you during our building project.