Loading...
COS Lutheran-CS 890803 (2)TO: CITY OF COPPELL 255 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 (214) 462-0022 WE ARE SENDING YOU [ ~1 Attached [ [ ] Mark Up Plans [ w~ians [ ] Prints [ ] Copy of Minutes [ ] Copy of Letter [ ] Specifications [ ] Change order [ ] COPIES DATE NO. DESCRIPTION THESE ARE TRANSMITTED as checked below: [ ] For Your Use [ ] Approved as Noted [ ] As Requested [ ~or Review & Comment [ ] Approved as Submitted [ ] Note & Reply To: [ ] Returned for Corrections [ ] Note & Forward To: Resubmit Copies for Approval Return Corrected Prints Submit Copies for Distribution V~eturn Markup Plans with Corrections CoPY To: SIGNED: TO: CITY OF COPPELL 255 PARKWAY BLVD. P. O. BOX 478 COPPELL, TEXAS 75019 (214) 462-0022 DATE: [ PROJECT: ATTElii']~ION :' ~ WE ARE SENDING YOU [ w~ Attached [ ] Mark Up Plans [ ] Copy of Minutes [ ] Change order ] Under Separate Cover via [ ~lans [ ] Copy of Letter [ ] the following item [ ] Prints [ ] Specifications COP I ES DATE NO . DESCRIPTION THESE ARE TRANSMITTED as checked below: [ ] For Your Use [ ] As Requested [ W~o~ Review & Comment Returned for Corrections Resubmit Copies for Approval Return Corrected Prints Approved as Noted Approved as Submitted Note & Reply To: Note & Forward To: Submit Copies for Distribution ~q~Return Markup Plans with Corrections REMARKS: COPY TO: ~/~ SIGNED: Ir , ERINU, INC 1409 ~8 August 2, 1989 . Mr. Russell Doyle, P.E., City Engineer City of Coppell, Texas P.O. Box 478 Coppell, Texas 75019 ~ Re: Christ Our Savior Lutheran Church - File No. 8594 Dear Mr. Doyle: The Church has requested that we review the drawings and specifications for a more cost effective program for building the Church. The following revision to the original design is requested: 1. The storm sewer drain pipe on the south side of the Church, Line "Q", may be omitted in this Phase of construction and installed later in Phase 2. The storm sewer on the north, Line "P", is being installed in Phase 1, and will improve the site drainage adequately to allow the later installation of Line "Q". The area does drain, though is very flat, and the Church would have to avoid any activities in this area after heavy £ains. With the Church being aware of this situation, it seems reasonable to allow the storm sewer to be installed at a future date. We look forward to your acceptance of this construction cost reduction, and the Church does plan for adequate maintenance to ensure the site is attractive for the community. Yours sincerely, President PH/j h D.101:35 c.c. Mr. Dale Jackson, Chief Building Official, City of Coppell STRUCTURAL CIVIL PLANNING SURVEYING HENNE_.SEY ENGINEERIN INC. 1409 THIRD STREET * CARROLLTON, TEXAS 75006 * (zl4l z45-9478 August 2, 1989 Mr. Dale Jackson, Chief Building Official City of Coppell, Texas 616-A South Coppell Road Coppell, Texas 75019 Re: Christ Our Savior Lutheran Church - File No. 8594 Dear Mr. Jackson: The Church has requested that we review the drawings and specifications for a more cost effective program for building the Church. The following revision to the original design is requested: 1. The concrete fire lane may be 5" thick, 3000 P.S.I. concrete, #3 reinforcing at 24" c.c., and installed on 6" of 6% lime compacted subgrade. The fire lane has adequate slope for drainage and the Church plans to maintain the surface well, so that good fire protection can be provided for the facility. We look forward to your acceptance of this construction cost reduction, and the Church does plan to pave the parking areas in Phase 2 to ensure the site functions well for the congregation. Yours sincerely, Pete Hennessey, President PH/Jh D.101.'35 Mr. Russell Doyle, City Engineer, City of Coppell STRUCTURAL CIVIL PLANNING SURVEYING I I I ' 4:,.~,t' ~.'.. Pavements could then consist of $ inches of adequately reinforced concrete tn both light duty and hea~' 'truck traffic areas. All concrete for pavements should have a 28-day design strength of at least 3,000 psi. The calculations used to determine the required pavement thickness are based on only physical and engineering properties of the materials and conventional thickness determination ,procedures. Related civil design factors such as subgrade ~lratnage, Shoulder' support, cross-sectional configurations, surface elevattons,"retnforcing steel, Joint design and, environmental factors will significantly affect the service 11fe and must be included in the preparation of the c:onstructed drawings and specifications, Adequate drainage should be provided at the site to reduce seasonal variations in moisture content of the foundation soils. All pavements or sidewalks should be sloped a~ay fro~ the butldtng to prevent pending of water around the foundation. In'order to enhance the performance of Slabs underlain by select fill .at this 'site, it is essential that every reasonable precaution be ('i~taken' to inhibit infiltration of grodndwat~e~ and surface water into the select fill. Past problems have:,.?b.~ee, noted with slabs underlain by even extensive select fill thicknesses Sen pooe drainage caused saturation of the select fill 17 In this instance the select fill can