Loading...
Coppell Ind 2-LR130315 (2) REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 230 3090 Olive Street, Suite 300 REPORT DATE: 03-15-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 03-08-13 TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Items Observed: Approach: 85-120’N, 190-270’E from NE building corner. Pier Caps: C.75/1 and D.5/1. Slab: Line AA-JJ from 1-2. Panels: 148-158, 159A and 159B. Reference Plans or Notes Used: Sheets C-2.01, S-1.00, S-1.01 RFI #32, S-1.1, S-4.00, S-4.02, Dayton Superior Book and Potter Panel Elevation book Comments:Chairs to be installed on slab pour at time of concrete placement. X There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. E-MailSubmitted by: Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland BW/cdl (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX