Loading...
Coppell Ind 2-LR130315 (3) CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 263 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 03-08-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Approach: 95’N, 250’E from NE building corner 10/50 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 5099 03-11-13 3 103750 3670 5099 03-11-13 3 106410 3770 3720 5099 03-15-13 7 143300 5070 5099 04-05-13 28 5099 04-05-13 28 5099 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 ) No. ID (inches)Sample(°F)(°F)(%) (lbs/ftNumber 1 5099 4.25 10:20 AM 57 62 4.0 148.2 32292 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Submitted by: Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Mr. Thomas Holland Bill Woolwine (1) Macgregor Associates/ Sr. Manager, CMT Mr. Lee Rader BW/cn (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 171 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 02-15-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Manhole: Line C STA 1+00 10/10 Design Information Source of Concrete Mix Identification Specified Strength (psi) Redi Mix 10L11524 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 4583 02-22-13 7 68030 5410 4583 03-15-13 28 84030 6690 4583 03-15-13 28 82290 6550 4583 03-15-13 28 77710 6180 6470 4583 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 4583 3.5 1:10 PM 47 60 3.3 148.2 25612351 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 170 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 02-15-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: C. Winchester PAGE: 1 of 3 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 80’S, 140’E from SE building corner 20/850 2 Paving: 35’S, 130’E from SE building corner 120/850 3 Paving: 78’S, 200’E from SE building corner 220/850 4 Paving: 30’S, 180’E from SE building corner 330/850 5 Paving: 10’N, 135’E from SE building corner 420/850 6 Paving: 55’N, 230’E from SE building corner 520/850 7 Paving: 160’N, 220’E from SE building corner 620/850 8 Paving: 65’N, 135’E from SE building corner 720/850 9 Paving: 210’N, 150’E from SE building corner 810/850 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 4570 02-22-13 7 100310 3550 4570 03-15-13 28 152760 5410 4570 03-15-13 28 142630 5050 5230 4570 Hold H 2 4571 02-22-13 7 126870 4490 4571 03-15-13 28 146580 5190 4571 03-15-13 28 139690 4940 5070 4571 Hold H 3 4572 02-22-13 7 117980 4180 4572 03-15-13 28 146580 5190 4572 03-15-13 28 154180 5460 5330 4572 Hold H 4 4573 02-22-13 7 124150 4390 4573 03-15-13 28 151600 5370 4573 03-15-13 28 135860 4810 5090 4573 Hold H 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT NO. 170 REG PROJECT NO. 18520 SAMPLE DATE: 02-15-13 PAGE: 2 of 3 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 5 4574 02-22-13 7 96070 3400 4574 03-15-13 28 151910 5380 4574 03-15-13 28 139320 4930 5160 4574 Hold H 6 4575 02-22-13 7 117920 4170 4575 03-15-13 28 149390 5290 4575 03-15-13 28 144550 5120 5210 4575 Hold H 7 4576 02-22-13 7 113490 4020 4576 03-15-13 28 149210 5280 4576 03-15-13 28 125360 4440 4860 4576 Hold H 8 4577 02-22-13 7 126860 4490 4577 03-15-13 28 149720 5300 4577 03-15-13 28 146180 5170 5240 4577 Hold H 9 4578 02-22-13 7 120620 4270 4578 03-15-13 28 129860 4600 4578 03-15-13 28 135760 4800 4700 4578 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 4570 5.5 4:25 AM 52 63 5.1 151.2 31041 2 4571 5.25 5:10 AM 50 63 4.9 151.2 31051 3 4572 5.0 6:10 AM 49 63 4.9 140.6 31061 4 4573 6.0 7:10 AM 48 62 4.8 149.6 31072 5 4574 5.75 8:15 AM 47 62 4.8 150.2 31081 6 4575 4.75 9:55 AM 46 62 4.8 152.0 31091 7 4576 5.5 10:50 AM 46 62 4.9 150.6 31101 8 4577 4.5 12:00 PM 47 62 4.9 152.0 31111 9 4578 5.0 1:05 PM 44 61 5.0 150.6 31120 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 170 REG PROJECT NO. 18520 SAMPLE DATE: 02-15-13 PAGE: 3 of 3 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell