Loading...
Cotton Belt-CS080613Eddie Vassallo From: Dan.Grant@kimley-horn.com Sent: Friday, June 13, 2008 11.06 PM To: Eddie Vassallo; BWalker @Billingsleyco.com Cc: H Billingsley@ Billingselyco. com-, Charles A. Salazar, ROY.WILSHIRE @kimley- horn.com; rob @baldwinplanning.com-, joel @themalingroup.com- peter @themalingroup.com; asinger @blakegloba1.com - rhawkins @blakeglobal.com; timarchibald@sbcglobal.net Subject: Cypress Waters -- Wet Utilities OPCC Reflecting Revised Demand -- 6/11 Meeting Attachments: Cypress Waters_OPCC_ 20080613 _Wet_Util_Appraisal_Focus.pdf Eddie & Bill, Please find attached the segment of our Cypress Waters Master OPCC built for our appraisal partners, reflecting the land use scenario described in the bullets below: Approximately 342 acres of land demand area — reflects original Billingsley purchase and includes condemnation land areas • No school demands reflected • Projected Land Uses as follows 0 10,843 combined multifamily and townhome units 0 600,000 SF of office space 0 100,000 SF of retail space The resulting changes in water and wastewater demand due to adjusting the projected office and retail land uses were minimal. Total Projected Construction Cost Opinion for the wet utility transmission and storage elements is currently $11,535,545 without contingency and engineering /survey /testing factors. Infrastructure elements outside these are not evaluated in this OPCC. I've copied those appraisal partners that I have contact information for. Please forward on to others as you see fit. Don't hesitate to contact me with any questions. I'll be prepared to review and adjust "on the fly" in our meeting planned for 10:00 AM this coming Tuesday. Thanks. Dan Dan F. Grant, P.E. (TX), CFM Kimley -Horn and Associates, Inc. 12700 Park Central Drive Suite 1800 Dallas, Texas 75251 972.770.1300 972.239 3820 fax 214 403.7645 cell dan. arant(D_kimlev -horn. corn CBP02944 CYPRESS WATERS PRELIMINARY INFRASTRUCTURE OPCC KIMLEY -HORN AND ASSOCIATES, INC.: IT 2008 EXHIBIT FOR LAWSUIT SUPPORT EXHIBIT BUILT FOR APPrrelcer 2 r,oy -c WEST AND EAST TRACTS RETAIL USE (SF) OFFICE USE (SF) /OOL USE (NUMBER 8 T w STORAGE b PUMPING INFRASTRUCTURE UNIT COSTS BASED ON KNOWN BID COSTS OF SIMILAR PROJECTS NTDFW AREA 10.483 10x000 REFERENCE ULTIMATE WSW W DEMANDS TAB FOR SIZING 604000 CALCULATIONS 0 OPINION OF PROBABLE CONSTRUCTION COST OPCC VEMENTS — CITY OF DALLAS SUPPLY FROM BELTLINE ROAD GROUND STORAGE TANK QUANTITY UNIT COS7 PER UNIT 5.0 TOTAL ELEVATED STORAGE TANK MG $ �•0� S 1,500,000 2 0 MG METERING STATION $ 1,400,000 $ 2.800,000 1.0 EA PUMP STATION $ 60.000 $ 15.0 60,000 MGD $ 150,000 $ 1 ,, - SANITARY SEWER IMPROVEMENTS — STATION ONE AND TRANSMISSION LIFT —STATION SYSTEM 24 INCH FORCE MAIN METERING STATION WATER IMPROVEMENTS TOTAL $ TRINITY RIVER AUTHORITY TRANSMISSION QUANTITY UNIT COST PER UNIT 12.1 MGD $ 100,000 $ 27,000 LF $ 100.00 $ 1 LS $ 60,000 $ SANITARY SEWER IMPROVEMENTS TOTAL $ CONSTRUCTION IMPROVEMENTS TOTAL a CONSTRUCTION CONTINGENCY o% $ ENGINEERING, SURVEYING, TESTING, CONSTRUCTION ADMINISTRATION FEES S% $ WET UTILITIES EASEMENT VALUATIONS _ LENGTH (LF) WIDTH (FT) VALUE IF PER SF $ OFFSITE SAONITARY EWER TRANSMISSION EASEMENTS 7,800 25 21,000 25 $ 5.00 PROJECT TOTAL $ 8,170,000 3TAL 1,205,545 2.100,000 60.000 7736_E;4_; 3,365,545 11,535,545 578,777 3,600,000 15,712,322 Because I- d—d llant doe, nut control Ina co,t of lapor, matanah, equipment or services lurnisbed by olnen, metnod, or eerarminin opini d u li as p toys. n,al. f j but not Ilm bad to Opinbns as to Ina cpsU of aonstmtlion and matadala.'ban pa made on lba basis of v BxpedanCB and Iepre,Mt itS ludgm 1 as an eRpedencae and quallbad prdes,ional, ramiller wiln the and to1 . Tne con g p ^m� or compeMbe Bidding a Fat mndp�lpn wanes graeler avwance a, to the amount of an 7 wasnt rs ^nd and does not guarantee that pmposab, bids or a ual toys w,ll not vary nom it, opinio, , u coal. t Ina Cron[ Y cost, ,t shall employ an indepentlant cost estimator. Consunant's serncea ,squired to bong costa witnin any Iimitatpn est'b'.- f by the Client will pe paid fa as Additional Sery kas. GI CI VI Ll6 3 9 7 30021DeslgnlOPCCsICypress Waters OPCC 20080613 _Wel_Utit_Appfalsal_FOCUS.xIs MASTER OPCC 20080613 - 6I13l2008 10:42 PM Page 1 of 1 CBP02945