Loading...
Amberpoint/IIT-CS130327 DEVELOPMENT FEES PROJECT NAME: Amberpoint Lot 2R Block A (IIT Corporate Center) ENGINEER: Half Associates ORIGINATION DATE: 4/10/2013 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE Water Impact Fee $8,550.00 Wastewater Impact Fee $4,797.00 Park Fee $0.00 Roadway Impact-Zone $0.00 Street Sign Street Light Construction Inspection $26,411.63 $26,411.63 ra 5/6/2013 EG or Bore Permit $2,933.12 $2,933.12 ra 3/27/2013 Overtime Inspection Water Tap Inspection $200.00 Wastewater Tap Inspection $50.00 Water Meter(Domestic) $882.00 Water Meter(Fire/Irrig) $299.25 Meter Deposit(Domestic) $30.00 Meter Deposit(Fire/Irrig) $90.00 Utility Final Inspection $50.00 Subtotal to Eng. $29,344.75 $29,344.75 $0.00 I Total Fees Fees Paid Amount Owed TOTALS $44,293.00 $29,344.75 $14,948.25 NOTES Prior To Construction Date Received Prior To Final Acceptance Erosion Control Approved As Built Plan Recd. E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. Erosion Control Maint. 4�- W '7 M ow w CD O � nib b O r•n co ft O 0 0 A O a co CD O d � A ¢, 'O+• C � � O b C rp b � o as O � o � ►OS � C m AD :z eD m c f Ds ❑Q ❑ ❑ L 00 ?! m p cn v < * 3. rD w D v m M -0 o ,r 0 w r) M- � Q Eq C n w fD :D. 3 '; a a m � 3 v O � r a � 0 a (D El El El �El 0 @ _ 0 0 �• D x to lQ y C. << o '+ n .* n 0 3 M eD z m 1 n o a N m n b 0 0 O 0 A O ►s O W eD a ro z 7d Or 0 ' � a � � o � o b � C a, co A o a CrQ. A O '0 0 0 A C1. O 0 C f9 O o. c O a � a � eD eb CA rA fD fD ►*� eD 'O CT— A C3 z CA S � L cn ' M °z � A O [ d . c CD V 0 av 8 60.3 9 � W � fD eD A A 1••1 yy qk a ro . C F"' n � H j � F�4 � O q � w V 0 av 8 60.3 9 `b° O A N 0 0 0 o � eor W �e A co y y bin O A � b 0'Q t0 0 0 IR�o n O A 1 T, O O n oC) C � Q do O ►� � A O � �'�`} � vi • � O C `C `C cy0 r, b a o � m OTI C v, �1 H tv ow t� �0 CD A CD cn H cn d O O O ti d CN � �• ID T, O O n oC) C � Q O d V,J CD It C. L T O O O � O O � O O O° a� b � w W r0 O �• ° O O 0 ° A n O A7 A fD O n O d O z b H H Ir�l O z A m do O y O � �'�`} � vi • � O C `C `C cy0 � CD ti CN �, fD �• ID 'S. �. fp N• • E m SSA n n1 '►3 ep Crt O O d `c' 'O O �• LS eD f� m O U�Q F.a r•* � O "Cy fD rD arc a m �b 0 �0 O d V,J CD It C. L T O O O � O O � O O O° a� b � w W r0 O �• ° O O 0 ° A n O A7 A fD O n O d O z b H H Ir�l O z A m C1 0 r C1 �o y �.9 7 c D CD Ln Ln o CD O �* b CD c°o 0 CD �• 0 CD " VC O (CD O0 CD O 0. N CD IZ3 °BCD CD Q- - P cr S c. bO CD At ' n c 2 V4 o' o �°^, N CD CD N C. ;07 � ? bOQ O' CD r ao o O o CD Vn (�D fD s d o t �. CD L3 p1 lD N 'Li ".�. CDD r CD• � � CAD N CD LL ° CD n o 1 � � o (D i CD CD CD o (D O Cl �• N �y CD (D C CD �o = 0 CD N � � /I �d M (7 zz Cri h7 C•1 l^ l °z y , *," n I" Fps i �A tit -4 0 w • o 0 �° Ln LA c fb -� O a y ° of 3 a N ( y N LA (D C (D � � A N a c7 °z n, O _ (7 (IQ A O fD CL a . ee Un v� rA ' o X A A ry y a9 � A N o• ro a O wo tl1 yp < ^� o � 4 C4 CL N ro rD d c D CD Ln Ln o CD O �* b CD c°o 0 CD �• 0 CD " VC O (CD O0 CD O 0. N CD IZ3 °BCD CD Q- - P cr S c. bO CD At ' n c 2 V4 o' o �°^, N CD CD N C. ;07 � ? bOQ O' CD r ao o O o CD Vn (�D fD s d o t �. CD L3 p1 lD N 'Li ".�. CDD r CD• � � CAD N CD LL ° CD n o 1 � � o (D i CD CD CD o (D O Cl �• N �y CD (D C CD �o = 0 CD N � � /I �d M (7 zz Cri h7 C•1 l^ l °z y , *," n I" Fps i �A tit -4 0 w CRB 111.3 City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 972/462 -0022 m y D Q d f OD.. 3..n 3 3: .Q 0;. c� o I?7 Z Z. p.. N ca ' o' mV� ,, o- - nm0 m D n 0 \ o 0 MZ m x o -n g -+ ID � C/) ° O •< W o O D � .a -o -+ OD CD 0 -ti X Oo m`� o 2 7E O —100 O O Xcu-0 C (1) o D cCJI O X Z A Z tO Z O -4 Z 3 O m OD Q N A � X oc o� v yo O D CO) 0 N a) m . o z D O 0 N N g -+ ID � W 1F -+ OD X Oo 7E co- W 00 O A Z tO 00 3 OD Q N A � m u �c 0 M 71 •1 } O ri CA I � `r `l 1 N ch z A V0 0 0 Xz Om cn 5; 0 cn Z C �C oM m CO) 0 m W< n m ^z m M a z z a o �o W z A O m xm D N 4 W N CRB 1113 City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 9721462 -0022 O CL (D c o� LD m o p N T CL m • __j T H E C 1 T Y O F comELL r X A SS' S April 10, 2013 Jared Canuteson, P.E. Halff Associates, Inc. 1201 North Bowser Rd Richardson, Tx 75081 RE: Amberpoint Bus. Park Lot 2r-3r Blk. A Fee Assessment Letter Dear Mr. Canuteson Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of$0.00 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be paid prior to scheduling a pre-construction meeting. The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when those fees are paid. Appropriate payment of the required fees will help insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely Z► Mic • r• ■'.E. Civil Engineer cc: Jennifer Miller, Finance Director Amy Swaim, Administrative Technician, Building Inspections Glenn Hollowell, Assistant Director of Public Works Tim Oates, Deputy Chief/Prevention Brad Reid, Director of Parks and Recreation Michael Arellano, Chief Building Official 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 DEVELOPMENT FEE TABLE Project: Amberpoint Business Park Lt 2R-3R Blk.A Date: 4/10/2013 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $8,550.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $882.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $299.25 (100% due at Issuance of Water Meter) Water Meter Deposit(Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $0.00 $0.00 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $14,948.25 I TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $0.00 DEVELOPMENT FEE WORKSHEET PROJECT: Amberpoint Business Park Lt 2R-3R Blk.A DATE: 4/10/2013 Water Impact Fee: Domestic Meter(s): 1 -2 inch = 5.33 ESU's Irrigation Meter(s): 1 - 1 inch = 1.67 ESU's 0 = 0 ESU's Fireline Meter(s): 2 -8 inch = 2.5 ESU's Total#: 9.5 ESU's @ $900.00 ea. $8,550.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total#: 4 Connections @$50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total#: 1 Domestic Meter(s) @ $882.00 $882.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) (This fee may change at the time of pick up) Irrigation/Fireline Water Meter Fee: Total#: 1 Irrigation Meter(s) @ $299.25 $299.25 Total#: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total#: 2 Fireline Meter(s) @ n/a meter provided by developer (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total#: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total#: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5.33 @ $900.00 ea. $4,797.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total#: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee(All developments): Total#: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multi-family @ $0.00 per unit $0.00 (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Assessed for lighting in the City's right-of-way. Information not Available This fee cannot be assessed until after Oncor submits the lighting plan for the proposed development. Once the plans are submitted, $352.44 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. Information not Available (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. Information not Available The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Amberpoint Business Park Lt 2R-3R Blk.A DATE: 4/10/2013 ROADWAY IMPACT FEE: Service Area * 1 Category** Light Industrial Land Use** General Light Industrial Building Area(sf) 300,800 Development Units ** 300.80 Vehicle Miles per Development Unit** 3.2 Fee per Vehicle Mile *** $150 Roadway Impact Fee due=(Development Units)x (Vehicle Miles per Development Unit)x(Fee per Vehicle Mile)= $144,384.00 *(Figure 4.1 -Roadway Impact Fee Study) **(Table 4.10-Roadway Impact Fee Study) ***(Schedule 2,Page 3 -The Master Fee Schedule) Percent of Credit Toward Roadway Impact Fees 100% Total Credit $144,384.00 $000 Credit per developers agreement 2001 CF Jordan Construction LLC 7700 CF Jordan Drive El Paso, TX 79912 Vendor CITOFC03 City of Coppell No. Invoice Inv Date Description 1 030813 03/08/2013 Early Grading Permit Northpoint IIT # : 467057 Date 03/25/2013 Invoice Amount Deduction Pay 2,933.12 0.00 2,933.12 TOTAL: 2,933.12 I THE FACE OF THIS DOCUMENT HAS A COLORED BACKGROUND ON WHITE PAPER Date Number CF ;Jordan Construction LLC 03/25/2013 467057 7700 CF Jordan Drive 88 -88 El Paso, TX 79912 1113 J JPMorgan Chase Bank, N.A. ...* "2,933.12 PAY Dallas TX TWO THOUSAND NINE HUNDRED THIRTY -THREE DOLLARS 12/100 TO THE City of Coppell ORDER Post Office Box 9478 ' OF Coppell, TX 75019 USA THE BACK OF THIS DOCUMENT CONTAINS A TRUE WATERMARK -HOLD TO A LIGHT TO VIEW m CASH �3 /.23 082593 RECEIPT Date ^ I,, o Received From OF JV 9 DO `, ,► as m Address 0Y S -7 Address Die Fj Avi p o$ $I%�i Dollars �� Z V T m N For%�l�L 0 =� Z. IL a AMT OF CASH 01 0 ACCOUNT HOW PAID ACCOUNT AMT. PAID f33 /Z CHECK , j BALANCE ,< MONEY 'ORDERG By, DUE GR €DIiOARD❑ City Contractor ❑ F1' COPPELL* EARLY GRADING / EXCAVATION PERMIT IN RIGHT -OF -WAY / EASEMENT / PRIVATE PROPERTY Date: -3 2013 Grading plans provided and approved. (Erosion Control must be installed prior to beginning work.) Tree Removal Permit from Parks & Recreation Dept. required. r-- �/A Hold Harmless Letter from the Property Owner /Engineer /Developer is attached. 305 S,�l Project Name /Location: TZT j� } �,, } Co>^par��e C` General Contractor: C F S„,,L,, Cons ry �i mr\ Permit issued to Compa Address: q4 1 y 6 reenyi lle Ave-, 0. t1Rr T -75'a K3 Telephone #: 2(t(- 341 790,0 Emergency Telephone #: a(� - q37- 19 V( General Description of work (provide copy of approved plans): 671Je {Y.K acre, sJe- 'fo do prepare Sp, P�infi ➢Was contact made with City and /or Utility Companies to locate existing utilities? if NO, Reason: (✓%s (-No *1 lodes -h de, dome, or ➢Was contact made with Parks & Recreation Dept. concerning Tree Removal Permit? if NO, Reason: Oo 4-rces 4a bc, re kovvA (' Yes (ylG0 Is removal of existing street, alleys, or sidewalks necessary? Yes ( No if YES, Attach Bore /Street Cut /Saw Cut Permit ➢Is Floodplain Permit required? (`Yes (--No if YES, Permit # or date of City Council variance Early Grading / Excavation Permit Page 2 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests will be required at the applicant's expense), Tree Ordinance and barricading according to the Texas Manual on Uniform Traffic Control Devices. Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage, vegetation, and erosion control). ➢Any work requiring closing of a lane of traffic, street, or alley must be approved by the Engineering Dept. with notification to the following prior to closing: Police Department @ 972 - 304 -3600 Fire Department @ 972 - 304 -3512 Street Department @ 972 - 462 -5150 Engineering Department @ 972 - 304 -3679 ➢Attach barricade plan / trench safety plan of a lane or street closure is required. Note: Street closures are allowed from 9.00 a.m. until 3.30 p.m. ONLY unless otherwise approved by City Engineer. ➢A 2% inspection fee for grading is required prior to beginning work. (Attach copy of excavation contract for verification) Amount Paid $ , �% , /Z Date Paid •:City inspector must be notified 24 hours prior to beginning work related to this permit. Printing your name indicates your acceptance of the terms and conditions of this form: Signature of Ap licant /Contractor Rep. Date sip � 3 L-z i E ty Engineer City Inspector for this project Date C4 EI . S Contact Number(s) Applicant shall indemnify and forever hold harmless against the City of Coppel/ each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. ■ INDUSTRIAL - I INCOME TRUST- HOLD HARMLESS AGREEMENT The owners of 350 S. Norhpoint Drive, Coppell, Texas understand and acknowledge that filling and grading to the above mentioned property prior to issuance of the building permit by the City of Coppell do so at their own risk. Furthermore, the owners shall hold the City of Coppell harmless should any changes be required during the building permit process of the above mentioned property that would require the owners to remove and/or replace any improvements installed prior to issuance of the building permit will be at the sole cost of the owners. March 20, 2013 (Date) IIT Northpoint CC, LP (Owner) i 2. Lime stabilize pad 8" 7% 42# 3. Cutback truck docks to paving subgrade. 4. Review the completed work with CFJ and concrete contractor. Approaches: 1. Saw cutting of existing concrete. 2. Demo and haul -off of concrete curb and gutter. 3. Excavation for specified paving requirements. 4. Provide required Traffic Control & Barricades for saw cutting of concrete curb /gutter (one month duration). 5. Attend mandatory pre- construction meeting with CFJ and other contractor. Exclusions: 1. Export of other subcontractor's spoils, sidewalk excavation, all erosion control other than silt fence, rock & structural excavation, testing, permits & bonds, Temp. water meter & construction water, tree removal, removal of any other items or material not identified on plans. Alternate (THESE ITEMS NOT INCLUDED WITHOUT A CHANGE ORDER): 1. Import & Place Common Fill to achieve proposed subgrade. ADD $20,000 for 2,000 TCY rl 11 c Contra Cost 1. Mobil zat on of Equipment = $10,820.00 ';N` 2. Strip /Grub & Stockpile Onsite = $9,414.00 3. Cut/Fill Site +/- 0.10' =$79,603.00 c- 4. Scagrify & Compact Paving Subgrade = $31,819.00 u u ,;ro Sul 5. 6. Lime St b liize Pad 8" 7 % 42 #'on $$84,1160.00 � � "� �; °" 4 7. Engineering/Staking for CSSTX Scope Only = $15,000.00 8. Cutback Truck Docks to Paving Subgrade = $4,901.00 9. Construction Entrance = $2,000.00 10. Silt Fence = $7,240.00 11. Lime Stabilize Firelane 8" 7% 42 #'s = $62,262.00 12. Backfill curbs = $14,800.00 Phase Code: 31.20.01.03 Contract Amount: $440,960.00 yw