Loading...
Cambridge Phase 1-CS 950103 (3) COPPELL PUBLIC WORKS MEMORANDUM DATE: January 3, 1995 ~ TO: Larry Davis, Construction Inspector ~ / '~/~' FROM: Howard Pafford, Utilities Superintendent~[.~ RE: Utilities Final Punchlist Walk-Thru for Ca~nB~:'ixl:tge Manor Phase I A follow up walk through was conducted December 29, and all punch list items were found to be corrected, except for the items dealing with the manholes located on the lots at the entry of the subdivision. You had previously pointed out that the developer had written a letter addressing this issue. Please send me a copy of this letter. If you have any questions regarding this matter, please advise. Howard Pafford Utilities Superintendent HLP/dg