Cambridge Phase 1-CS 950103 (3) COPPELL PUBLIC WORKS
MEMORANDUM
DATE: January 3, 1995 ~
TO: Larry Davis, Construction Inspector ~ / '~/~'
FROM: Howard Pafford, Utilities Superintendent~[.~
RE: Utilities Final Punchlist Walk-Thru for Ca~nB~:'ixl:tge
Manor Phase I
A follow up walk through was conducted December 29, and all
punch list items were found to be corrected, except for the
items dealing with the manholes located on the lots at the
entry of the subdivision. You had previously pointed out that
the developer had written a letter addressing this issue.
Please send me a copy of this letter.
If you have any questions regarding this matter, please advise.
Howard Pafford
Utilities Superintendent
HLP/dg