Loading...
Cambridge Phase 1-CS 941219 MEMORANDUM To: Howard Pafford, Street Superintendent Atul Patel, Graduate Engineer From: Larry Davis, Construction Inspector RE: FINAL WALK-THRU Cambridge Manor Estates / Utilities Only Date: December 19, 1994 A final walk-thru on the referenced project has been scheduled for Wednesday, December 21, 1994 at 1:30 p.m. for utilities only. If I can be of further assistance, please let me know. cc: Jack Bommarito Burkard Utility Contractors CLD/pc file!ldavis/Owalkthru, mm MEMORANDL~i To: Howard Pafford, Street Superintendent Atul Patel, Graduate Engineer From: Larry Davis, Construction Inspector RE: FLNAL WALK-THRU Cambridge Manor Estates / Utilities Only Date: December 19, 1994 A final walk-thru on the referenced project has been scheduled for Wednesday, December 21, 1994 at 1:30 p.m. for utilities only. If I can be of further assistance, please let me know. cc: Jack Bommarito Burkard Utility Contractors CLD/pc file.-"ldavis/0walkthru, mm