Loading...
Cambridge Phase 1-CS 941212DEVELOPMENT, INC. Mr. Ken Griffin ~ City Engineer/City of Coppell Post Office Box 478 Coppell, Texas 75019 Dear Ken: Pursuant to a preliminary walk-thru of The Estates of Cambridge Manor with MR. LARRY DAVIS (City of Coppell), MARK WAINSCOTT (Beamer Development) and myself on Monday, December 5th, 1994, the following items are hereby presented to you for your infor- mation and approval: ITEM DISCUSSED: Larry was concerned about the erosion control at the entry due to the steep banks of dirt on both sides of the approximately two hundred sixty (260') foot entrance to The Estates of Cambridge Manor. ACTION TAKEN: Larry was presented with the current land- scape plans for The Estates of Cambridge Manor and stated that although it would control erosion we still need to address the problem now. We will have silt fencing in place on both sides of the entrance not later than December 16, 1994. ITEM DISCUSSED: Larry pointed out that erosion control was needed around the six (6) acre lake on the east side of phase one of The Estates of Cambridge Manor. ACTION TAKEN: We will have the entire banks of the lake ...! raked and seeded not later than Monday, December 19, 1994. ITEM DISCUSSED: Provide silt fencing between all lots with "V" ditches that carry run-off water to paving areas. (PUNCH LIST ITEM) ACTION TAKEN: Silt fencing will be provided between these lots not later than December 19, 1994. POST OFFICE BOX 2312 · COPPELL, TEXAS 75019 Mr. Ken Griffin December 12, 1994 The Estates of Cambridge Manor - Page Two - ITEM DISCUSSED: Larry pointed out that erosion control was needed at all wheel chair ramps at the corner of the streets and also at all inlets. (PUNCH LIST ITEM) ACTION TAKEN: There will be approximately thirty (30) linear feet of erosion control at the wheel chair locations and approximately twenty (20) feet of erosion control at the inlets. We will solve this problem with silt fencing, which will be in place not later than December 16, 1994. ITEM DISCUSSED: Larry explained that The City of Coppell requires an EROSION CONTROL MAINTENANCE BOND LETTER along with a fee to be held by The City for a period of two (2) years to insure compliance with future erosion control. ACTION TAKEN: The City of Coppell will receive the EROSION CONTROL MAINTENANCE BOND LETTER along with the appropriate fee and/or bond not later than December 16, 1994. ITEM DISCUSSED: Larry pointed out that a trash pile located at the south end of the six (6) acre lake had to be removed. (PUNCH LIST ITEM) ACTION TAKEN: The contractor was contacted on December 6, 1994, and will start the clearing of trash on Saturday, December 10, 1994 and be completed not later than December 19, 1994. ITEM DISCUSSED: Larry pointed out that the area from the northeast corner of the EHLERS property (see attached plat) to our lake needs to be shaped for drainage in order for the run-off can flow to the lake. ACTION TAKEN: Dowdey, Anderson Engineering was made aware of this drainage problem and will commence re-shaping for proper drainage on Monday, December 12, 1994 with a completion date of December 16, 1994. Mr. Ken Griffin December 12, 1994 The Estates of Cambridge Manor - Page Three - ITEM DISCUSSED: Larry requested that Dowdey, Anderson Engineering submit an "as-built" drawing of the slopes of the banks of our six (6) acre lake to The City of Coppell Engineering Department to meet the current specifications setforth in the plans previously approved by The City. Another option would be to re-submit "slope grading" plan for review and approval if existing grading plan is to remain. ACTION TAKEN: Dowdey, Anderson Engineering was contacted, this date, and will re-submit new "as-built" drawings j. to The City not later than December 15, 1994. ITEM DISCUSSED: The excavation of the dirt from the weir was dis- cussed and what our plans were to dispose of same. ACTION TAKEN: The dirt from the weir will be transported to LOT 5/BLOCK "E" (northwest corner) to have that particular lot "built-up". The purchasers, Joe and Tina Boyd, will have the dirt tested and compacted per city regulations and will contact / The City regarding this item not later than December 14, 1994. ITEM DISCUSSED: Larry and Atul Patel (City of Coppetl), visited the site and were concerned about the lack of visibility when exiting The Estates of Cambridge Manor, which is caused by landscaping and trees located on the southeast corner of the TERRY property (see attached plat). ACTION TAKEN: I will personally visit Mr. & Mrs. TERRY, and ask them to possibly trim or remove the present landscaping and trees to allow adequate visibility as you exit The Estates of Cambridge Manor. This visit will take place this weekend (December 10th or 11th) and I will have a written report on same not later than Monday, December 14, 1994. Mr. Ken Griffin December 12, 1994 The Estates of Cambridge Manor - Page Four - ITEM DISCUSSED: Larry pointed out that due to the current conditions of Denton Creek, to wit, the height of the water in the creek; the constant fluxuation of same and the fact that the soil around the creek is saturated, it would be almost impossible to actually commence the installation of the weir at this time. ACTION TAKEN: The final plans for the weir have been approved by The City and the contractor is ready to commence the installation of same. However, due to the current condition of Denton Creek, as mentioned above, and the fact that seven (7) homes are already designed and ready to be built, we are hereby requesting that the plans for the weir be removed temporarily from the conditions necessary to receive our final certificate of substantial completion. We will, however, make every effort to commence building of the weir as approved by The City and keep your office apprised of same on a weekly basis. Ken, in closing, the installation/building of the weir is a "key" component in controlling the flow of water in The Estates of Cambridge Manor, however we feel at this time "our hands are tied" due to the fact that we have no control over the weather, nor the release of water into Denton Creek by The Army Corps of Engineers. On the other hand, all other conditions stipulated by The City will be completed as outlined in this letter. Additionally, I have instructed Dowdey, Anderson Engineering and Ro~Robertson, the contractor installing the weir, to keep your office abreast of the progress on a weekly basis and hopefully, we can have the weir operational by February of next year. Thanking You in advance for your serious consideration and approval of our request pertaining to the weir. If you have any questions, whatsoever, regarding any item or items in this letter, please feel free to call me anytime @ 214/ 908-1068. Si~3~re ly, A ~ ~leve lopment 1 Atch: Plat of Deforest cc: Atul Patel Bill Anderson :.1 ~ ~' ~ ~ , .... ; '::' 'A.-?-~_ L.-. - '% ~ ~"~ ' ' ~' '-" -. ~ %-- ~' ': ~ ~ ~l ~" ' -" ................... : ................... ~---b ~i ......... · ~ ~ I /~ ~ ~ [ - ~ ~, I I . ~ ~ - ~ -' ~ ~r~ '~ , ~ L~' ! · , f-~ ,,~ k~ . - .... <~:~ ~ " I . ~1 t?-".~~,~,d~ ,,~ .... '. ~--~ e-'- '%-' I - - .... ~ ]~ .... ~ .............. _... v !~,le ' ~ I : . ~ . ~ -* ~ 2' ............... ~ ~':~ ~:, ........ ~-. ,- ,~...~..~,, ~ ,, '.~'~ i~ ~ ~ ....... ~'' ~' ~ .--- .... 1~':-~ q ,,,..~' ~ ~ "- ~) - 21 ' ~., ~ ~", "' . ....................... ~~~~ X , ~:" ~'" ~' '"~i -" ~ '- -,~.i~ ~ ~ '~tt..-~ '~~ '; X ~ ~' :1'~ ~.~ //~-~'~ ~ ' i ~ .-~ '~. -'~-: ~'",."'-~'~ '~ ~ I ........ ' .............. '~ il '~' ......... ' ~ ...... -:' ' "' ' ......................................... ' t I I N ' / " - . ~ I ~ ...... _ I