Loading...
Cambridge Phase 1-CS 941108 ~::.:-~=_-- / ~: -_-~=~-~=~' ~ ~' .~-_-..~-.-~._- ~,'i.5_=_=_= ~=~ .. -. ~ Copaeu -exas 750~9 /~----7../~., ..~--," "~ The C~ty W~th A Beaut~fui Future ?. 4--'-62-0022 November 8. 1994 Site Concrete. Inc. P.O. Box 140096 Irving. TX 75014-0096 RE: Cambridge Manor Dear Mrs. Boney: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, October 29. 1994. The overtime rate including salaD' and benefits is $29.00 per hour. Eight hours were charged to your company on that date. Please send a check for $232.00 payable to the City of Coppeil to the following address: City of Coppeli Finance Department P.O. Box 478 Coppell. TX 75019 Attention: Alan Johnson If you should have any-' questions, please contact me at (214) 393-1016. Sincerely.A ~ COnstruction Inspector cc: Finance Department Doug Stevens, Engineering Technician filc-ovt.ltr 00T-28-94 FRI i ~,Iz P, 02 SITE CONCRETE, INC. f...;~' 3328 Roy Orr o Grand Prairie. 'FX ~5050-4207 · 214-313-0733 . FAX 214-517,-0825 Mailing Address: P. O- Box 140096 · Irving, Tcxas 75014 0096 Mr. Larry Davis October 28, 1994 City of Coppell Delivered by Fax ~ 393-0948 Re; C~abridge ~nor N0rthlake Woodlands C0~onwood Creek Dear Mr. Davis: We are requesting permission to work Saturday, , on the above mentioned project. Please sign and return by fax. Thanking you in advance. Sincerely, Site Concrete, Inc. Approved by: _ Date: