Loading...
Trinity River Kayak-PT130327 A copy of the approved permit must be on the job site at all times. CC: Applicant T 14 : c T Y a r Page 1 of 4 Public Works COPPELL Permit File Rev_ 06/2012 Opri . toPro'ect File ' e A ° 03- '5-1 3 F!1 J: RCVD govE u, RIGHT-OF-WAY USE PERMIT APPLICATION Permit valid for 90 calendar days from date of approval Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer@coppeiltx.gov(see button below) Date of Submittal: 3/25/13 Applicant's Job # /Work Order# PERMIT FEE: $100.00 (No charge to Utility Companies with approved Franchise/ROW Use Agreement) Refer to the City of Coppeli Ordinance No. 2001-944. Certificated Telecom Provider? Yes (i No f 0 Plans provided and approved (Erosion Control/Safetyfences must be installed prior to beginning work) Project Name/Location or address Trinity River Kayak Co./ 1601 Sandy Lake Rd (cet 5 t) General Contractor Texcomrn Contact# 817-822-7637 Email address to return permit I•west tberry @texcomm.net Representative: $enny Carrasco Franchise Telephone#: 972-877-6785 0 Company: E-mail address:bonny.carrascolatwcable.com (for contact if needed/If e-mall of approved permit is desired/permit cannot be e-mailed unless complete) Utility Company Represented: C` Oncor Electric Delivery C Atmos Energy C` Verizon C` SBC/AT&T (T Time Warner Cable r CoSery Electric/Gas C Other General Description of Work(tn accordance with Ord.No.2001-944):PLEASE ATTACH PLAN OF PROPOSED WORK Bore and Place 2"Pipe Estimated Start Date 3/27/13 Estimated Completion Date*4/27/13 * Completion requires submittal of Completion Verification Notice(see page 4) ">Was contact made with City and/or utility companies to locate existing utilities? if NO, Reason: Yes C' No >Is removal of existing streets, alleys, or sidewalks necessary? C Yes (+ No if YES,project must have City inspection prior to concrete replacement Right-of-Way Use Permit Application Page 2 of 4 Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices. ur . � ,n.i ti�`> � 61LI, n �e s " (grading, drainage, vegetation,and erosion control). To schedule Public Works final inspection (Page 4)call 972-462-5155. >Any excavation requiring closing of a street/alley must be reported prior to closing to the following: Police Department 0 972-304-3600 Fire Department @ 972-304-3512 Street Department 0 972-462-5150 Engineering Department 0 972-304-3679 >Attach barricade plan /trench safety plan if a lane or street closure is required. NOTE: Street closures are allowed from 9:00 am,until 3:30 p.m.ONLY unless otherwise approved by City Engineer. >Attach Work Order(franchise only)and/or 1 set of prints showing proposed work. Locates for Ming franchise utilities must be tone 48 hours prior to beginning work.;. For City utility locates_ ,call 972 4 2.51.56 to schedule__ 44t;''limo; prior to i nning work The application with signatures of Franchise and Contractor representatives must be submitted to Engineering Dept.for approval prior to beginning work.Submittals by e-mail should go to engineerwcQppelltx.gov. Printing your name indicates your acceptance of the terms and conditions of this form: -(ifrixr ant the approved permit returned via e-mail,provide a valid e-mail a#dress n Page 1,) . /,7 , .13 Signa Utility Company Representative Date Sig idature of Contractor Representative ep Date /-7,1 i i a e s ity Representative Date Comments >NOTE: Notify City,inspector at 972-304-3679 prior to beginning work and prior to backfill for concrete, trench, ditch and open pit inspections. Backfill must meet all construction standards approved by the City of Coppell. Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. • ,TimE WARNER CABLE GENERAL PROJECT NOTES TRINITY RIVER KAYAK CO 1. ALL CONSTRUCTION R WITHIN THE MUNICIPALITY IN WHICH THE WORKOISETO IN ACCORDANCE BE PERFORMED. THE 2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE. UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND 1601 E SANDY LAKE RD CONSTRUCTION SHALL ACTUAL AND PROTECTION OF ALL EXISTING FACILITIES WHETHER NOT. E CONSTRU ION CONTRACTOR SHALL ALSO FOR PNRS TO ANY EXISTING FACILITY DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE X DRAWINGS OR NOT. 3. C 0 P P E L L T/ \ THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK. CALL BEFORE YOU DIG 1-800-DIG-TESS ITS THE LAW VICINITY MAP 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO A) PREVENT DAMAGE TO PRIVATE AND . I PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION. I ' I S. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND • SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS '/� : SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT 4��. !� AND BARRICADED AT NIGHT. vOCA G. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING EXCAVATION.THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH ALL. LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL IiW'' ASPECTS OF IRORK RELATED TO EXCAVATION. LI z 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN THE STANDARD SPECIFICATIONS 5.B "PORTLAND CEMENT CONCRETE PAVEMENT"AND 7.4.5 "QUALITY OF CONCRETE" AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - 2004. ALL OTIIER CONCRETE SHALL BE CLASS A CONCRETE. 3 B. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT. 9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42' OF COVER, UNLESS OTHERWISE SPECIFIED. 10.ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO THE TYPE OF EQUIPMENT USED TO OBTAIN TIIC REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE USED FOR BACKFILL. PREPARED BY: DFW TELECOM,INC. --- I f / .... _ ...... ....------- ,.....____ ---SON-- . . 1 , \ ----' ---Qv---- .---,,,_.--....--,,,,,,...---,.......,..... ,, - -- /./ - •--- - - ';'40.4 , E SANDY LAKE RD 1110 ROW.) I RACE ORATTE VAULT ----SOO------_____ -.A-- --- --OPTOP- 003\1 \ 24 4 30 a 38. 'NOP-7-77- ----4-'''-----:--• 7.77-1•;.,,,_„_1 ------- .--- -I-- , I „...._. CISW ..'N.--"..77---••••- 740"7'....7.7 ...-------- .C.SW 4 •.- ,,... T- ----UV-------UV"----. I I I - ---4---- - - --...■-,n,----.---- TYPICAL PAVEMENT BORE DETAIL _ _ PROPOSED 2-2"HOPE .`,. ASPHALT PARKING , A-- RI,I4.00 , , ,, I ; , . . 1-15 JO ) „ I !t'l ', ..c.' MASONRY WALL • -a ',t , "I otrEwAT . ! 1 L•1 1-7. ??.. '1„. ; PROPOSED•-2•HDPE \...\I\ 71 1 I... sp —4. \._ , i —■• lip6otnilkisANAN1,KAtAKYAEx4cDo cC•olNi ; I WI 0.t. ; '.• 'F-''. 91 ; \ \P-17---'-- ., Ti •,, , i i ,\ \ ; ______----- . . i : 1 . 1 PJ.4+00 . , II' STA.•+30 % • RACE WALL 80X ..77,104.0-115 I '''.; I 12"x 24"x 24" \ ' r BORE I, \ ; RISE ON 81.00.W/ STA,0+00 GALVANIZED STEEL pin DID CAN PECE1AI.PEEESTAL 24'x 36"x 35' TYPICAL UTILITY CROSSING RESIN 1 co i li 1 : 2,00 • 1 1 TRENCH DETAIL I EXIST q OW-A ROT TO LE I ; 1 CF P-POSED'CONDUIT ' SCA a5 TR1004 _6150UND 1.1S___ 'nom(al 1 1 5°1 8". • GRACE I I. -_ MIN, R 1 SEPARATO . I . . - .31 111M441M"-. Mill II. bjliFill -05111, ..1111°- . %.,,i MINIM TO.P0 M EMC.11.1 UM, 1..-' III COSHICN SAND WM OEMS ME 24"MIN: ."... ficlfro I 00 550 SOlOS MEM,MUD STARKDON rSPEWITYT(') T 1 PREPARED BY: ESTIMATED SHEET TOTALS NORTH PROJECT: TRINITY RIVER KAYAK CO DESCRIAIION _DLANIITY DESCRIPTION D w. BORE Y R E.10 1,,3,,,,,,PcLAECEco8LIGTHIT 46162 PLACE OPEDUAZEISTE,ALVAULT f:r( ri ...4":;21A4 DIRECTIONAL BORE DOSE&PLACE STEEL CASING PLACE 3'X IV X 41 HANOVOLE PLACE 4'X 4'X 4'MANHOLE OJANTAY I /A1 li I AL. 40.. ___ ADDRESS: 1601 E SANDY LAKE RD . CITY,sinte., CORRELL,TX PULL THROUGH EXISTING CONDUIT PLACE T.-GUARD RISER C ABL. E R It R CONCRETE SIDEWALK AMIN.:PARTIASH SHEET HORIZONTAL SCALE VERTICAL SCALE JOB NUMBER: DATE: R lc R CONCRETE PAVEMENT AERIAL,NEW BUI-0 1 or 1 r 40 1"=10' DID-39164 03-22-2013