Trinity River Kayak-PT130327 A copy of the approved permit must be on the job site at all times.
CC: Applicant T 14 : c T Y a r Page 1 of 4
Public Works COPPELL Permit File Rev_ 06/2012
Opri . toPro'ect File ' e A ° 03- '5-1 3 F!1 J: RCVD govE
u, RIGHT-OF-WAY USE PERMIT APPLICATION
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept.,Town Center,255 Parkway Blvd.or e-mail to engineer@coppeiltx.gov(see button below)
Date of Submittal: 3/25/13 Applicant's Job # /Work Order#
PERMIT FEE: $100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppeli Ordinance No. 2001-944. Certificated Telecom Provider? Yes (i No f
0 Plans provided and approved (Erosion Control/Safetyfences must be installed prior to beginning work)
Project Name/Location or address Trinity River Kayak Co./ 1601 Sandy Lake Rd (cet 5 t)
General Contractor Texcomrn Contact# 817-822-7637
Email address to return permit I•west tberry @texcomm.net
Representative: $enny Carrasco
Franchise Telephone#: 972-877-6785
0 Company:
E-mail address:bonny.carrascolatwcable.com
(for contact if needed/If e-mall of approved permit is desired/permit cannot be e-mailed unless complete)
Utility Company Represented:
C` Oncor Electric Delivery C Atmos Energy C` Verizon C` SBC/AT&T
(T Time Warner Cable r CoSery Electric/Gas C Other
General Description of Work(tn accordance with Ord.No.2001-944):PLEASE ATTACH PLAN OF PROPOSED WORK
Bore and Place 2"Pipe
Estimated Start Date 3/27/13 Estimated Completion Date*4/27/13
* Completion requires submittal of Completion Verification Notice(see page 4)
">Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason: Yes C' No
>Is removal of existing streets, alleys, or sidewalks necessary? C Yes (+ No
if YES,project must have City inspection prior to concrete replacement
Right-of-Way Use Permit Application Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to: Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense)and barricading according to the Texas Manual on Uniform Traffic Control Devices.
ur . � ,n.i ti�`> � 61LI, n �e s " (grading, drainage,
vegetation,and erosion control). To schedule Public Works final inspection (Page 4)call 972-462-5155.
>Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department 0 972-304-3600
Fire Department @ 972-304-3512
Street Department 0 972-462-5150
Engineering Department 0 972-304-3679
>Attach barricade plan /trench safety plan if a lane or street closure is required.
NOTE: Street closures are allowed from 9:00 am,until 3:30 p.m.ONLY unless otherwise approved by City
Engineer.
>Attach Work Order(franchise only)and/or 1 set of prints showing proposed work.
Locates for Ming franchise utilities must be tone 48 hours prior to beginning work.;.
For City utility locates_ ,call 972 4 2.51.56 to schedule__ 44t;''limo; prior to i nning work
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept.for approval prior to beginning work.Submittals by e-mail should go to engineerwcQppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
-(ifrixr ant the approved permit returned via e-mail,provide a valid e-mail a#dress n Page 1,)
. /,7 , .13
Signa Utility Company Representative Date
Sig idature of Contractor Representative ep Date /-7,1 i
i a e s ity Representative Date
Comments
>NOTE: Notify City,inspector at 972-304-3679 prior to beginning work and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
•
,TimE WARNER
CABLE
GENERAL PROJECT NOTES
TRINITY RIVER KAYAK CO 1. ALL
CONSTRUCTION
R WITHIN THE MUNICIPALITY IN WHICH THE WORKOISETO IN ACCORDANCE BE PERFORMED.
THE
2. EXISTING UTILITY LOCATIONS SHOWN ARE TAKEN FROM AVAILABLE RECORDS AND MAY NOT BE ALL INCLUSIVE.
UTILITY LOCATIONS ARE GENERALLY SCHEMATIC IN NATURE AND MAY NOT ACCURATELY REFLECT THE SIZE AND
1601 E SANDY LAKE RD CONSTRUCTION SHALL
ACTUAL AND PROTECTION OF ALL EXISTING FACILITIES WHETHER NOT.
E CONSTRU ION CONTRACTOR SHALL ALSO FOR PNRS TO ANY EXISTING FACILITY
DAMAGED AS A DIRECT RESULT OF THE CONSTRUCTION ACTIVITIES WHETHER THE FACILITY IS SHOWN ON THE
X DRAWINGS OR NOT.
3.
C 0 P P E L L T/ \ THE CONSTRUCTION CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL DEPARTMENTS WITHIN THE
MUNICIPALITY AND THE UTILITY COMPANIES AT LEAST TWO WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORK.
CALL BEFORE YOU DIG
1-800-DIG-TESS
ITS THE LAW
VICINITY MAP 4. IT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR TO A) PREVENT DAMAGE TO PRIVATE AND
. I PUBLIC PROPERTY. B) RESTORE ALL AREAS EFFECTED BY THE CONSTRUCTION TO ORIGINAL OR BETTER CONDITION.
I ' I S. BARRICADING AND TRAFFIC CONTROL SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION CONTRACTOR AND
•
SHALL CONFORM TO THE "TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES". TRAFFIC FLOW AND ACCESS
'/� : SHALL BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION. THE CONSTRUCTION CONTRACTOR IS RESPONSIBLE
FOR PROVIDING TRAFFIC SAFETY MEASURES FOR WORK ON THE PROJECT. THE WORK SITE SHALL BE SUITABLY LIT
4��. !� AND BARRICADED AT NIGHT.
vOCA G. THE CONSTRUCTION CONTRACTOR SHALL ABIDE BY ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS GOVERNING
EXCAVATION.THE CONSTRUCTION CONTRACTOR SHALL PROVIDE ALL TRENCH SAFETY SYSTEMS THAT COMPLY WITH
ALL. LAWS GOVERNING EXCAVATION. THE CONSTRUCTION CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL
IiW'' ASPECTS OF IRORK RELATED TO EXCAVATION.
LI
z 7. ALL CONCRETE USED IN ANY ROADWAY SHALL BE IN COMPLIANCE WITH THE SPECIFIED CLASSES OF CONCRETE IN
THE STANDARD SPECIFICATIONS 5.B "PORTLAND CEMENT CONCRETE PAVEMENT"AND 7.4.5 "QUALITY OF CONCRETE"
AS AMENDED BY THE ADDENDUM TO THE NORTH CENTRAL TEXAS STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION - 2004. ALL OTIIER CONCRETE SHALL BE CLASS A CONCRETE.
3
B. ALL REINFORCING STEEL AND DOWEL BARS IN PAVEMENT SHALL BE SUPPORTED AND MAINTAINED AT THE CORRECT
CLEARANCES BY THE USE OF BAR CHAINS OR OTHER APPROVED SUPPORT.
9. ALL CONDUIT MUST BE PLACED WITH A MINIMUM 42' OF COVER, UNLESS OTHERWISE SPECIFIED.
10.ALL BACKFILLING WILL BE MECHANICALLY TAMPED IN LIFTS TO A DENSITY OF 95% PROCTOR. THE REQUIRED
DENSITY WILL BE OBTAINED BY USING TAMPERS, RAMMERS OR ROLLING EQUIPMENT. LIFTS MAY VARY ACCORDING TO
THE TYPE OF EQUIPMENT USED TO OBTAIN TIIC REQUIRED DENSITY. SAND AND DEBRIS FREE MATERIAL WILL BE
USED FOR BACKFILL.
PREPARED BY: DFW TELECOM,INC.
---
I f
/ .... _ ...... ....------- ,.....____
---SON--
.
. 1
, \ ----'
---Qv---- .---,,,_.--....--,,,,,,...---,.......,..... ,, - -- /./
- •--- - - ';'40.4 ,
E SANDY LAKE RD
1110 ROW.)
I RACE ORATTE VAULT ----SOO------_____
-.A--
--- --OPTOP- 003\1 \ 24 4 30 a 38. 'NOP-7-77-
----4-'''-----:--• 7.77-1•;.,,,_„_1 ------- .--- -I--
, I
„...._. CISW ..'N.--"..77---••••- 740"7'....7.7
...--------
.C.SW 4 •.- ,,... T- ----UV-------UV"----. I I I
- ---4---- - -
--...■-,n,----.----
TYPICAL PAVEMENT BORE DETAIL _ _
PROPOSED 2-2"HOPE .`,. ASPHALT PARKING
, A--
RI,I4.00 , , ,, I ; , . . 1-15 JO
) „ I !t'l ', ..c.'
MASONRY WALL
•
-a ',t , "I
otrEwAT . ! 1 L•1 1-7. ??.. '1„. ; PROPOSED•-2•HDPE
\...\I\
71 1 I... sp —4. \._ , i
—■•
lip6otnilkisANAN1,KAtAKYAEx4cDo
cC•olNi ; I WI 0.t.
; '.• 'F-''. 91 ; \ \P-17---'-- .,
Ti
•,, ,
i
i ,\ \ ; ______-----
. . i : 1
. 1 PJ.4+00 .
,
II' STA.•+30
% • RACE WALL 80X
..77,104.0-115 I '''.; I 12"x 24"x 24"
\ ' r BORE I, \ ; RISE ON 81.00.W/
STA,0+00 GALVANIZED STEEL pin
DID CAN PECE1AI.PEEESTAL
24'x 36"x 35' TYPICAL UTILITY CROSSING
RESIN 1 co
i li 1 : 2,00
•
1 1
TRENCH DETAIL I EXIST q OW-A
ROT TO LE
I ; 1 CF P-POSED'CONDUIT '
SCA a5
TR1004
_6150UND 1.1S___ 'nom(al 1 1
5°1 8". • GRACE I I. -_ MIN,
R
1 SEPARATO
. I . . -
.31
111M441M"-. Mill II. bjliFill
-05111, ..1111°- . %.,,i
MINIM TO.P0
M
EMC.11.1 UM,
1..-' III
COSHICN SAND WM OEMS ME 24"MIN: ."... ficlfro I
00 550 SOlOS
MEM,MUD STARKDON
rSPEWITYT(') T 1
PREPARED BY: ESTIMATED SHEET TOTALS NORTH
PROJECT: TRINITY RIVER KAYAK CO
DESCRIAIION _DLANIITY DESCRIPTION
D w.
BORE Y R E.10 1,,3,,,,,,PcLAECEco8LIGTHIT 46162 PLACE OPEDUAZEISTE,ALVAULT
f:r(
ri ...4":;21A4
DIRECTIONAL BORE
DOSE&PLACE STEEL CASING PLACE 3'X IV X 41 HANOVOLE
PLACE 4'X 4'X 4'MANHOLE OJANTAY
I
/A1 li
I AL.
40..
___ ADDRESS: 1601 E SANDY LAKE RD
. CITY,sinte., CORRELL,TX
PULL THROUGH EXISTING CONDUIT PLACE T.-GUARD RISER C ABL. E
R It R CONCRETE SIDEWALK AMIN.:PARTIASH SHEET HORIZONTAL SCALE VERTICAL SCALE JOB NUMBER: DATE:
R lc R CONCRETE PAVEMENT AERIAL,NEW BUI-0 1 or 1 r 40 1"=10' DID-39164 03-22-2013