Loading...
Cambridge Phase 1-CS 940713 ~==..-~-- ' .2_'¢-: ._.-~-=~" ~--~ ~ --- ~ ~ '~ '~ .~x 47~. ~/,~-=--~';" ~ ~-= i '.__~ C~, Tex~ 7~C'g A ~ /~ The C~ty W,th Beaubful F,~t~-e ~ ~2'~2-.D022. July 13, 1994 ' Mr. Bill Anderson ~ . j , Dowdey, Anderson and Associates, Inc. 16250 Dallas Parkway Suite 1~ Development Fee Assessment Dmr Mr. Anderson: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Estates of Cambridge Manor. Please provide a check made payable to the City of Coppell in the amount of $119,941.45 and forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer cc: Steve Goram, Director of Public Works Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL ._ DEVELOPMENT FEES Dale: July 13, 1994 Project: Eslales of Cambridge Manor TOTAL AMOUNT DUE FEES DUE PRV)R TO CC dNCIL AP! ROVAL Water Impact Fee S 39,650.00 $ 39,650.00 (100% due prior to Council Approval) Water Tap Inspection Fee $5.100.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 20,700.00 $ 20,700.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee $ 4,600.00 4)- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 2,300.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $ 1,023.50 4)- (100% due at Issuance of Building Permit) Water Meter Deposit (Non-Residential) -0- -0- (100% due at Issuance of Water Meters) Water Meter Deposit (Residential) $ 1,380.00 4)- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 313.50 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit $ 175.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee $ 631.45 $ 631.45 (100% due prior ti) Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Pm.ject) available Park Fee $ 59,110.00 $ 59,110.00 (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 134,983.45 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 119,941.45 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: July 11, 1994 TO: Engineering Department FROM: Public Works Staff RE: Development Fees for Cambridge Manor The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 46 - 5/8" x 3/4" Domestic Meter/s = 46 ESU's 4 - 1" Irrigation Meter/s = 10 ESU's 1 - 1 1/2" Fireline Meter/s = 5 ESU's Total 61 ESU's @ $650.00 ea = $ 39,650.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 46 - 5/8" x 3/4" Domestic Meter/s = 46 ESU's Total 46 ESU's @ $450.00 ea = $ 20,700.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 51 Connections @ $100.00 each = $ 5.100.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Sewer Tap Inspection Fee 46 Connections @ $100.00 each = $ 4,600.00 100% due prior to issuance of building permit. (Residential only) Development Fees Page 2 Utility Final Inspection Fee (Ail Development) 46 lots @ $50.00/lot = $ 2,300.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 46 - 5/8" x 3/4" Domestic Meters @ $22.25 ea = $ 1,023.50 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation/Fireline) 4 - 1" Irrigation Meter/s @ $ 46.10 ea = $ 184.40 1 - 1 1/2" Fireline Meter/s @ $ 129.10 ea = $ 129.10 100% due prior to issuance of water meter/s. Water Meter Deposit (Residential) 46 Meters @ $30.00 ea = $ 1,380.00 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) Meters @ $35.00 ea = 100% due prior to issuance of water meters. Irrigation Meter Deposit 5 Meters @ $35.00 ea = $ 175.00 100% due prior to issuance of water meters. Development Fees Page 3 Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: N/A Residential Lots at $150.00 each = $ N/A Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: N/A Residential Lots at $350.00 each = $ N/A Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: 46 Residential Lots at $1,285.00 each = $ 59,110.00 Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Development Fees Page 4 Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. cc: Steven G. Goram, Director of Public Works G. Greg Jones, Chief Building Official DEVELOPMENT FEES PROJECT NAME: The Estates of Cambridge Manor ENGINEER: Dowdey, Anderson & Associates REVISION DATE: 7/1 8/94 SENT ASSESSMENT ASSESSED FEE AMOUNT PAID DATE % 7/13/94 Park Fee $59,110.00 7/13/94 Water Impact Fee $39,650.00 7/13/94 Wastewater Impact Fee $20,700.00 7/13/94 Street Sign $631.45 Street Light Construction Insp. (Grading) $454.09 $454.09 5/17/94 Irrigation Street Escrow Street Cut Permit Overtime Inspection Total Fees Fees Paid Amount Owed TOTALS $120,545.54 $454.09 $120,091.45 NOTES Prior To Construction Prior To Final Acceptance Erosion Control Approved (w/Grading Plans) As Built Plan Recd. 5/17/94 E.P.A.-N.O.I. Recd. Paving Bond Recd. Const. Plan Approved Utilities Bond Recd. 4/20/94 Irrigation Plan Recd. Irrigation Plan Approved Homeowner's Maint. Erosion Control Maint. /:¢ RECEIPT Dote -~-,~ ,,~ ~ 0022442 Address ACCOUNT ~T PAID j~ ~ ~-- CHECK BALANCE MONEY