Loading...
Cambridge Phase 1-CS 940620 (2)~~ ~ DEVELOPMENT, INC. · June 20, 1994 Mr. Kenneth Griffin ~ [ ,~ ~.~ Ciny Engineer ~ ~ ~ J...,~_ -- %' City of Coppell P.O. Box 478 Coppell, Texas 75019 Dear Mr. Griffin: Reference our meeting, this date, regarding the transportation of soil (dirt) from 701 Deforest Road to 836 Deforest Road, Coppell, Texas. The vehicles transporting the soil (dirt) will travel approxi- mately six-hundred (600') feet west and exit at our property located at 836 Deforest Road. The caravan of vehicles will commence on Tuesday, June 21st, 1994 and will be hauling soil (dirt) for approximately twenty (20) days, or until July 10th, 1994. As a precaution for everyone concerned, Dowdey, Anderson Engineering has video-taped this section of Deforest Road in an effort to validate the present condition of the afore- mentioned street. Additionally, they will also video-tape the road after the soil (dirt) has been transported to compare the condition "before" and the condition "after". Beamer Development, Inc., will be responsible for any and all damage resulting from this soil (dirt) movement that may occur during this project and will contact your office when this task is completed for further directions regarding same. I have attached a current plat of all properties located on Deforest Road (east of MacArthur Bouldevard) and "hi-lighted" the route the vehicles will take in the movement of soil (dirt). Thanking You in advance for your co-operation in this project, and if you have any questions, whatsoever, please feel free to call me anytime @ 214/ 908-1068 or 214/ 393-1001. Sincerely, 1 Atch: Deforest Plat y Genial Manager POST OFFICE BOX 2312 · COPPELL, TEXAS 75019