Loading...
Coppell Ind 2-LR130327 (2) REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 287 3090 Olive Street, Suite 300 REPORT DATE: 03-27-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 03-22-13 TECHNICIAN: C. Eisenhardt PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Paving: 280-620’N, 10-130’E from SE building corner. Items Observed: Sheet C2.01 Reference Plans or Notes Used: X There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland CT/cdl (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 282 3090 Olive Street, Suite 300 REPORT DATE: 03-27-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 03-20-13 TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Pier Caps: Lines CC.75/1 and DD.5/1. Items Observed: Paving: 75’S - 285’N, 5-130’E from SE building corner. Sheet S-1.00 & RFI #32 Reference Plans or Notes Used: Sheet C-2.01 There were no deviations noted. X The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. E-MailSubmitted by: Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland CT/cdl (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 282 3090 Olive Street, Suite 300 REPORT DATE: 03-27-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 03-20-13 TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Pier Caps: Lines CC.75/1 and DD.5/1. Items Observed: Paving: 75’S - 285’N, 5-130’E from SE building corner. Sheet S-1.00 & RFI #32 Reference Plans or Notes Used: Sheet C-2.01 There were no deviations noted. X The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. E-MailSubmitted by: Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland CT/cdl (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 288 3090 Olive Street, Suite 300 REPORT DATE: 03-27-13 Dallas, Texas 75219 REG PROJECT NO. 18520 ATTN: Mr. Kerry Roetzel DATE OBSERVED: 03-23-13 TECHNICIAN: C. Eisenhardt PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Approach and paving: 75’S-105’N, 15-135’W from Items Observed: SW building corner. Sheet C2.01 Reference Plans or Notes Used: There were no deviations noted. X The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Ronald F. Reed, P.E. Mr. Thomas Holland CT/cdl (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX