Coppell Ind 2-LR130327 (2)
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 287
3090 Olive Street, Suite 300
REPORT DATE:
03-27-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
03-22-13
TECHNICIAN:
C. Eisenhardt
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Paving: 280-620’N, 10-130’E from SE building corner.
Items Observed:
Sheet C2.01
Reference Plans or Notes Used:
X There were no deviations noted.
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Submitted by:
E-Mail
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/cdl
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 282
3090 Olive Street, Suite 300
REPORT DATE:
03-27-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
03-20-13
TECHNICIAN:
J. Bowers
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Pier Caps: Lines CC.75/1 and DD.5/1.
Items Observed:
Paving: 75’S - 285’N, 5-130’E from SE building corner.
Sheet S-1.00 & RFI #32
Reference Plans or Notes Used:
Sheet C-2.01
There were no deviations noted.
X
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/cdl
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 282
3090 Olive Street, Suite 300
REPORT DATE:
03-27-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
03-20-13
TECHNICIAN:
J. Bowers
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Pier Caps: Lines CC.75/1 and DD.5/1.
Items Observed:
Paving: 75’S - 285’N, 5-130’E from SE building corner.
Sheet S-1.00 & RFI #32
Reference Plans or Notes Used:
Sheet C-2.01
There were no deviations noted.
X
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/cdl
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX
REPORT OF REINFORCING
STEEL PLACEMENT OBSERVATION
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:REPORT NO.
Hillwood 288
3090 Olive Street, Suite 300
REPORT DATE:
03-27-13
Dallas, Texas 75219
REG PROJECT NO.
18520
ATTN: Mr. Kerry Roetzel
DATE OBSERVED:
03-23-13
TECHNICIAN:
C. Eisenhardt
PAGE:
1 of 1
CONTRACTOR:
Hillwood Construction Services
Approach and paving: 75’S-105’N, 15-135’W from
Items Observed:
SW building corner.
Sheet C2.01
Reference Plans or Notes Used:
There were no deviations noted.
X
The reinforcing steel placed at the above referenced locations was observed with
respect to the referenced portions of the contract documents.
Submitted by:
E-Mail
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/Mr. Lance Clinton
(1) Macgregor Associates/
Ronald F. Reed, P.E.
Mr. Thomas Holland
CT/cdl
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX