Cambridge Phase 1-PT 940505CITY OF COPPELL Revised 3/12/92
P. O. BOX 478
COPPELL, TEXAS 75019
(214) 393-1016
Construction Development Permit Application
1. Name of Applicant: ~~K
Address: ~,~0 Z ox 2312
Phone Number: (2/~)
2. Location of Property:
Address
If ~at~ in a S~ivision:
Name of Subdivision Section No. Block No. Lot No.
If Not Located in a Subdivision:
Name and Nu~er of Survey/~tract Acreage
Location Description Attach a Vicinity Map
3. Nature of Proposed Construction or Development (Check and Complete):
'~-~) Residential ( ) Non-Residential
( ) Alteration of a Natural Waterway ( ) Other (Describe & Attach
Drainage Course a Drawing or Sketch
( ) Placement of Fill
4. Description of Proposed Construction or Development (Check and
Complete):
'~) New Construction ( ) House
( ) Mobile Home ( ) Non-Residential
(specify)
( ) Substantial Improvement to Existing Structure
( ) Commercial
Name and Type of Business
5. Description of Construction Permit Requested (Complete as Appropriate):
() Paving ~ ()Drive Approach ()Sidewalk
( ) Median or ~6~) Excavation ( ) Fill Area
Landscaping
( ) Water Main ( ) Sanitary Sewer ( ) Drainage
Main Channel
( ) R.C.P. ( ) Box Culvert Excavation
( ) Bridge ( ) Rip-Rap ( ) Inlet
* Please provide the name, address, and 24 hour phone number for a
contact supervisor for each and every contractor working under this general
permit.
6. All construction will follow the City of Coppell Subdivision Ordinances
and stamped approved plans. The activity shall be in compliance with
Erosion and Sedimentation Ordinance.
7. Applicant will provide one copy of approved plans, specifications, and
related cost estimate or contract of the proposed construction for the
purpose of permit calculation fee.
8. Construction Permit Fee:
Amount Paid
2 % Contract Construction
Cost on Items to be Dedicated ~ ~5~, o?
NOTE: A separate excavation permit is required anytime pavement is
cut or that there is work in the right-of-way not approved by
the ~ty Engineer.f~ . ~, .---/~- " /
· ~ ...~ ~. , -' '~ ,,,,~, ../,/
-' '-- ~ '"Signature of Appl~ant
FOR CITY USE ONLY
Is the fill area located in an identified flood hazard area? ( ) Yes ( ) No
If yes, then a Floodplain Development Permit is required before any
construction can start.
Is additional information required? ( ) Yes ( ) No
Are other federal, state, or local permits required? ( ) Yes ( ) No
( ) Permit Application Approved
( ) Permit Application Disapproved
City Approval Date
CONDEV '
DA.. M. DOWDEY AND ASSOCIATES, C.
CIWL ENGINEERS
16250 DALLAS PARKWAY SUITE 100
DALLAS. TEXAS 75248
(2~.4) 93~.-0694 FAX (2~4) 931-9538
May 16, 1994
Mr. Michael A. Martin
City of Coppell
Engineering Department
255 Parkway Boulevard
Coppell, Texas 75019
Re: The Estates of Cambridge Manor
Grading Permit
Dear Mr. Martin:
Please note the following calculations of the inspection fees for
the earthwork of the above referenced subdivision:
17,465.00 C.Y. Street Excavation
$ 1.30 Per Cubic Yard
$ 22,704.50
x 2% inspection fee
$ 454.09
Therefore, the inspection fee for the earthwork is $454.09.
Sincerely,
MSD; jrb ' '/
CRfl. 111-3
City of Coppell '~
255 Parkway Boulevard
Coppell. Texas 75019
214/462-0O22
~ ~ ~ --
/-c
41230 Federal Register / Vol. 57. No. 175/_.W__Wednesday] S~ptember g. lg<J2 / Notices - - -
' Appendix C ~ NOI Form Instructions
~ R~era4 for Inl~ru~l~r-- ~ ~' ~'~ "' ~
Ij,.~ .%,,~ E. ,,~, .,,.. - .'~ ~/I,gm'~ -. .
- EPA .....
~ Notlca o! Ini~ ~OD for Slo,-m Wst~r OIsc~ ~t:'~at~d w-lib Ir~lus~ral
,&ct~lTy' U~ Itt~ NPOES G~rmr'aJ Pm'mil
~-,,,: Lt~,E,~,~,c:,F..' ,O,~,.V,~_,c,o,?,~,e,u,~, ,i,lV,C ....... ! ~r.:l~,},Hll,°,$1
, J ,2~ ~ ~
~.... Ir,c, ,6,o,~, ,~,3 , , , , , , , , , , , , , , , , , , , , ~