Loading...
Cambridge Phase 1-PT 940505CITY OF COPPELL Revised 3/12/92 P. O. BOX 478 COPPELL, TEXAS 75019 (214) 393-1016 Construction Development Permit Application 1. Name of Applicant: ~~K Address: ~,~0 Z ox 2312 Phone Number: (2/~) 2. Location of Property: Address If ~at~ in a S~ivision: Name of Subdivision Section No. Block No. Lot No. If Not Located in a Subdivision: Name and Nu~er of Survey/~tract Acreage Location Description Attach a Vicinity Map 3. Nature of Proposed Construction or Development (Check and Complete): '~-~) Residential ( ) Non-Residential ( ) Alteration of a Natural Waterway ( ) Other (Describe & Attach Drainage Course a Drawing or Sketch ( ) Placement of Fill 4. Description of Proposed Construction or Development (Check and Complete): '~) New Construction ( ) House ( ) Mobile Home ( ) Non-Residential (specify) ( ) Substantial Improvement to Existing Structure ( ) Commercial Name and Type of Business 5. Description of Construction Permit Requested (Complete as Appropriate): () Paving ~ ()Drive Approach ()Sidewalk ( ) Median or ~6~) Excavation ( ) Fill Area Landscaping ( ) Water Main ( ) Sanitary Sewer ( ) Drainage Main Channel ( ) R.C.P. ( ) Box Culvert Excavation ( ) Bridge ( ) Rip-Rap ( ) Inlet * Please provide the name, address, and 24 hour phone number for a contact supervisor for each and every contractor working under this general permit. 6. All construction will follow the City of Coppell Subdivision Ordinances and stamped approved plans. The activity shall be in compliance with Erosion and Sedimentation Ordinance. 7. Applicant will provide one copy of approved plans, specifications, and related cost estimate or contract of the proposed construction for the purpose of permit calculation fee. 8. Construction Permit Fee: Amount Paid 2 % Contract Construction Cost on Items to be Dedicated ~ ~5~, o? NOTE: A separate excavation permit is required anytime pavement is cut or that there is work in the right-of-way not approved by the ~ty Engineer.f~ . ~, .---/~- " / · ~ ...~ ~. , -' '~ ,,,,~, ../,/ -' '-- ~ '"Signature of Appl~ant FOR CITY USE ONLY Is the fill area located in an identified flood hazard area? ( ) Yes ( ) No If yes, then a Floodplain Development Permit is required before any construction can start. Is additional information required? ( ) Yes ( ) No Are other federal, state, or local permits required? ( ) Yes ( ) No ( ) Permit Application Approved ( ) Permit Application Disapproved City Approval Date CONDEV ' DA.. M. DOWDEY AND ASSOCIATES, C. CIWL ENGINEERS 16250 DALLAS PARKWAY SUITE 100 DALLAS. TEXAS 75248 (2~.4) 93~.-0694 FAX (2~4) 931-9538 May 16, 1994 Mr. Michael A. Martin City of Coppell Engineering Department 255 Parkway Boulevard Coppell, Texas 75019 Re: The Estates of Cambridge Manor Grading Permit Dear Mr. Martin: Please note the following calculations of the inspection fees for the earthwork of the above referenced subdivision: 17,465.00 C.Y. Street Excavation $ 1.30 Per Cubic Yard $ 22,704.50 x 2% inspection fee $ 454.09 Therefore, the inspection fee for the earthwork is $454.09. Sincerely, MSD; jrb ' '/ CRfl. 111-3 City of Coppell '~ 255 Parkway Boulevard Coppell. Texas 75019 214/462-0O22 ~ ~ ~ -- /-c 41230 Federal Register / Vol. 57. No. 175/_.W__Wednesday] S~ptember g. lg<J2 / Notices - - - ' Appendix C ~ NOI Form Instructions ~ R~era4 for Inl~ru~l~r-- ~ ~' ~'~ "' ~ Ij,.~ .%,,~ E. ,,~, .,,.. - .'~ ~/I,gm'~ -. . - EPA ..... ~ Notlca o! Ini~ ~OD for Slo,-m Wst~r OIsc~ ~t:'~at~d w-lib Ir~lus~ral ,&ct~lTy' U~ Itt~ NPOES G~rmr'aJ Pm'mil ~-,,,: Lt~,E,~,~,c:,F..' ,O,~,.V,~_,c,o,?,~,e,u,~, ,i,lV,C ....... ! ~r.:l~,},Hll,°,$1 , J ,2~ ~ ~ ~.... Ir,c, ,6,o,~, ,~,3 , , , , , , , , , , , , , , , , , , , , ~