Cambridge Phase 1-CS 940428 (3) COPPELL PUBLIC WORKS
MEMORANDUM
DATE: April 28, 1994
TO: Gary Sieb, Director of Planning & Community Services
FROM: Steven G. Goram, Director of Public Works
RE: The Estates of Cambridge Manor Addition, Final Plat
Plan Review Comments
1. Ail fees will be calculated and sent to Engineering for
processing.
2. Block C, Lot 9 needs to be identified. Is this a residential
lot.
3. Block C, common area needs to be identified by metes and
bounds. There also needs to be defined a separation line
between this common area and Block C, Lot 9.
4. Please show location of Block B, Lot 5 identified as double
frontage or "key" lots.
5. Show sidewalk connection between hike and bike easement and
subdivision.
6. Irrigation controllers are required to have freeze protector,
rain sensor, and surge protection devices.
SGG/bc
cc: Kenneth Griffin, Assistant City Manager/City Engineer
Central File
CAMBRI.SG