Loading...
Corridor Dev Cert. Process• What. • Why • When • Who • Where • How • Status • Process to stabilize flooding risks along the Trinity River • Development is allowed, but must not: — raise flood water levels — reduce flood storage capacity — increase erosive water velocities 1 F uoilz)ipsunf s,xoggfiou notp ui siz)afojd uo luaunuoo of sopiunwwoo JOTO smoIln ssajold suoisioop furiliuuod IOAO IOJIUoo aluuziiln uiploi SJUMIuaanO�t Imor . (panuiluoa) ,LVHAA. :ssamm. [ awagi. yea') juauidolaalatj a[oppao3 aujL 2. Floodplain permitting could dramatically reduce flood risk • 1 st edition of manual implemented in 1991 • 2nd edition of manual implemented in 1998 4 • 49th edition of manual implemented in ? ? ?? 3 U 3litnsIA%0q 2uiAJI . AII.IoginV JQAT 1 XITUTr,I, QIJTlLljd puu.io . IOI.IisIQ JORM luuO'23N iuuzluZ gvOAk VOd o SloulSiQ tuio2 S gOuuJq saauuu3 sulluQ XiunoD uoluaQ lloddoD . it lunoo Iuuim jL uoilloinD XiunoD sulluQ uol�?ulliv . sopunoD (1W Art juaujdoia.Aa(T JopiaaoD au,L NEW MAPPING - Will be "State of the Art" • Digital format • From aerial photography • Covers 240 square mile area • 1" = 200' • 2' topography Development projects in the Regulatory Zone must meet the following permit criteria: • NO rise in the 100 -year flood elevation • maximum valley storage loss of- - 0% for the 100 -year discharge and — 5% for the Standard Project Flood discharge • no increase in erosive water velocities based on equal conveyance reductions on both sides of the channel incorporated into hydraulic modeling. 5 G� dpw uoiluool W suvId alts . suopuindwoo 32mols XaijVn — suoilunaia omjins aawm — saS.reuosip pooU — mup oilnu ipXq W Z)12010-IpXH . I9 •oja `joumo `uoijdTlosop loofold — uoiiuuuojui 100[Old . uoiju;)TlddV a(Ij, pazuap J.1wiad ❑ luauturoD 2s) ❑ sap!aap naatnaw jvu018a& iojv )s.lu.lwp6' upvldpoolg woo j ❑ p,a uvt8 'Wj "�;_ ® �T A � atna� / 1 17�1Zl11�a� % i � �vututt1a.rd / a���i,�t�.za7 �uc��udo��aA�Q aopr.zao7 a�{��- m • Hydraulic computations must be done using HEC- RAS model maintained by USACE • The HE.0 -RAS model incorporates existing and permitted projects • Hydrologic discharges are based on future conditions (2050) 0 • US Army Corps of Engineers (USAGE) reviews hydraulic and hydrologic modeling supporting CDC application 1 r • Fee is $1500 or $750 based on effective or ineffective flow area • USACE periodically incorporates permitted projects into their HEC -RAS hydraulic model M 7 n LEI agivivilvIviliT 7091,VOJ 7VO07 •suotstaap wauzdojanap IL'uiJ .Iano X11joginu suiMaJ IuauzuzOA02 I -eaol goUg sapx-.)a(l .1o113.1slulm -DV uilu dpooi 11701 jLM ssaaold nnaina1.iaad . iaafo.id pasodo.id aqj uo luomwoa oa aauUga aqj anUq ssaao.id DQD aqi ui .2upudiop iud satliunuziuoa III' • • Exemptions for specific activities outlined in the manual (e.g. bank stabilization activities, backfill for utility lines) • Variances may be issued, following Preliminary Technical Review and Regional Review & Comment, when: — the project is deemed to be in the public interest — strict enforcement of the process would cause undue hardship E of Zb 1b1O1 8 ssaa idul uoleoll e 0ao G pauopuege }oa.oad E paluea uoll wax3 l aoueuen 4lIM p91uea6 1lwaad 0do 6Z paluea 1.!wjad 040 suolleolp�3a�O jo # uollob llwaad SU0113V }ivaaad 303 Sf- UNILtiS INHW I2 IL, :ssaaoj,d juaurdoiana(I 1013iaao, } auZ Zti WWI 0 Alunoo luejael 5 811lnsIM9-1 L bUIAJI ahead pueaE) 8 4pom 1=1 0 43uej8 siawied t, seilea G unoo sellea E Ileddoo L uolllo.ueo 9 uol u!la`d suolleoll d oao io # uollolpslanr uoiloipsianr Aq suoi}e3ilddd 3a3 S CILL V,ZS IN HUH-1111- :ssaaoa� a�� �� �i�aa7 �uautd:o��ana� JOP!1103 agjL • Flooding risks stabilized • Common permit criteria • State -of -the -art floodplain mapping • Improved hydraulic modeling • Guarantee of local control of floodplain permitting decisions • Organize a group of representatives from communities along the stream corridor to guide development of the process — City /county policy leaders — Technical staff • Develop mapping and hydraulic modeling for the stream corridor — Necessary for evaluating whether proposed projects will raise water surface elevations and/or reduce valley storage 11 zi u0111culaoJui allow OA: jununuz pun `2uilapow `2uTddnuz ui salnpdn aTp�ouad o3pu -i `'OWIj .nano ssaaoJd aql Ijan.zJL . ssaaoid jQD oqj uT uollndpivud apnjouT of saaunuipio uinldpoolj .ITagl puauzn saTliunLutuoo fuiludTOT d . (InnuuW D(ID) soinpaaoid ssaaoid uaiium dolanaQ . ssaaoj4j 3(13 r, turdoj0,A34J ui sdals juropodiul