Loading...
Westhaven 1-CS130408 T H E C I T Y O F COPPELL A S 1 5 April 8, 2013 Mark Harris, P.E. Josh Bosler Kimley-Horn & Associates Standard Pacific Homes RE: Westhaven Addition, Phase 1 PRE-CONSTRUCTION CONFERENCE Dear Sirs: A pre-construction conference on the referenced project has been scheduled for Thursday, April 11, 2013 at 1:30 a.m. in the first floor Conference Room in Town Center at 255 Parkway Blvd. Please notify the franchised utility companies, contractors, sub-contractors, testing lab and any other interested parties so that they may have a representative present. If you have any questions concerning this project prior to the scheduled meeting, feel free to contact me at(972) 304-3684. Sincerely, Larry Davis, Construction Inspector Phone: 972-304-3684 Fax: 972-304-3570 cc: Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Assistant Public Works Director Michael Garza, P. E., Civil Engineer Michael Arellano, Chief Building Official Michael Hodge, Residential Building Inspector Tim Oates, Deputy Chief/Prevention David Malone, Deputy Fire Marshal 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 2 RESPONSIBILITY FOR PRE-CONSTRUCTION MEETING NOTIFICATION The owner/ owner's representative will be notified of the date, time and place of the pre-construction meeting once it is scheduled by the Construction Inspector assigned to the project. It is the owner/owner representative's responsibility to notify the following parties: • Franchise Utilities (including but not limited to electric, gas, cable, & telephone providers) • Geotechnical firm • Project Engineer • Contractors or subcontractors for excavation, utility, & paving operations • SWPPP representative