Loading...
Westhaven 1-PT130411T H C I T Y b p.._ COPPELL i CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Name of Applicant: Address of Applicant: Phone Number: c5% FAX Location of Construction (address, if available): AN CST RAVC� ) a n -ph 1. Subdivision Section # OR Date Submitted: Survey /Abstract # Acreage Location description (attach vicinity map): Block # Lot # 1. Type of proposed construction or development: (L- 'Residential O Alteration of a natural waterway drainage course O Non - residential O Other (describe & attach drawing or sketch) O Placement of Fill (in right -of -way or on private property) 2. Description of Construction Permit requested: ( Pav' g () Median or Landscaping ( idewalk (ter Main () Drive Approach ( ) Excavation ( ) Fire Lane ( ) Bridge (*97. C.P. ( unitary Sewer Main () Flume nlet ( ) Box Culvert ( ) Rip Rap ( ) Fill Area ( ) Drainage Channel Excavation ( ) Slope Protection /Retaining Wall ( ) Parking Lot Provide an attachment containing the name and 24 -hr. contact phone number of supervisor(s) for every contractor working under this general permit. 3. All construction shall be in compliance with, but not limited to, the City of Coppell Subdivision Ordinance, Standard Construction Details, Streetscape Plan and approved plans. The contractors shall adhere to the City's Erosion Control & Sedimentation Ordinance. 4. Applicant shall provide a copy of approved plans, specifications and related cost estimate or contract for the purpose of permit fee calculation verification. CONSTRUCTION DEVELOPMENT PERMIT APPLICATION Page 2 5. A Construction Inspection Permit Fee shall be paid prior to beginning work, in accordance with the City of Coppell Fee Ordinance. See Page 3 for calculation formula. Amount Due: $ �Q / j��'/ . 7 'F Date Paid: ` - 1113 NOTE. A separate excavation permit is required anytime pavement is cut or when there is work in the right -of -way not approved by the City Engineer. ➢ Any work requiring closure of a lane of traffic, street, or alley must be approved in advance by the Engineering Dept., with notification to the following prior to closure: Police Department 0 972 - 304 -3600 Street Department (& 972 - 462 -5150 Fire Department a 972 - 3043500 Engineering Dept. 0 972 - 304 -3679 ➢ Attach barricade plan / trench safety plan of a lane or street closure. (Required) ➢ It is a requirement of this permit that As -Built Drawings be turned in at the end of this project. As- Builts consist of 1 set full size paper copy, 1 set full size mylar and CD with Autocad.dwg files. NOTE. Street closures are allowed from 9.00 a. m. until 4.00 p m ONLY unless otherwise approved by City Engineer. ➢ A pre - construction meeting is required prior to beginning work related to this permit. 4S'a ntact the ' s for assigned to your project to schedule the meeting. rV f A is Printed Nam Contact Number /_A'2f(/ DD VlS 972! - 304 -3G.,N 46R- 576 =7747 Ci Inspector Contact Number(s) FOR CITY USE ONLY Is the rill area located in an identified flood hazard area? ( ) YES ( ) NO If YES, a Hoodplain Development Permit is required before any construction can begin. Is additional information required? ( ) YES ( ) NO Are other federal, state, or local permits required? ( ) YES ( ) NO ( ) PERMIT APPLICATION APPROVED ( ) PERMIT APPLICATION DENIED City Approval Date Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand or cause of action that may be made or come against it by reason: of or if any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such permit is granted. F�1 � 1�1 1.4 ' b o� u R H A z V �ti FBI a ti 0 O a� cd O 5 b Q„ O O y 'Z7 A C ) � o CA o �cn0 �o ac 0 4 v, d 8 �t O _! y N U id O pip O vi L. c °zs u . ° ' 03 c >o Q > ' o Ln _ E'er,., 4 o c C 0 �U y H ° T3 ° w +, a� =cd cd .° a C� °' ' w � W ° �v =� 0 U C V C) cz O. b0 U O' p U 0 QwTSw ►.� u II 0 N F a °Q E. a dz �o a M II •off . � f�V H OQ U a tY, w 3 � H p a¢, 3 cQn En ¢ M o�L a ot H z P a 0 d a d a A a C u 2 a 0 U Bid Form Westhaven Coppel, Texas February 28, 2013 Item No. Descriotion Unit Quantitv Unit Price Amount Division III - Paving 1 6" Reinf. Concrete Street Pavement (incl. curb & gutter) SY 23,496 $30.80 $723,676.80 2 6" Reinf. Concrete Street Paving - Parallel Parking Spaces SY 700 $30.80 $21,560.00 3 6" Street Pavement - Stamped Concrete SY 77 $145.00 $11,165.00 4 6" Reinf Concrete Alley Pavement SY 1,669 $34.60 $57,747.40 5 8" Street Pavement - TxDOT Turn Lanes SY 2,622 $42.50 $111,435.00 6 8" Subgrade Preparation SY 27,694 $2.05 $56,772.70 7 8" Subgrade Preparation - TxDOT Turn Lanes SY 2,850 $2.05 $5,842.50 8 Hydrated Lime TON 554 $141.00 $78,114.00 9 Hydrated Lime - TxDOT Turn Lanes TON 57 $141.00 $8,037.00 10 Pavement Header LF 28 $8.00 $224.00 11 Barrier Free Ramps EA 37 $1,500.00 $55,500.00 12 Street Barricade EA 1 $1,500.00 $1,500.00 13 5' Sidewalk LF 5,211 $17.50 $91,192.50 14 8' Sidewalk LF 2,694 $31.20 $84,052.80 15 15' Sidewalk LF 138 $60.75 $8,383.50 16 Sawcut & Remove Existing Curb LF 1,359 $15.00 $20,385.00 17 Combination Street Name Signs (2 blades per) & Stop Sign (111 -1) EA 14 $500.00 $7,000.00 18 Connect to Existing Street LS 3 $500.00 $1,500.00 19 Traffic Calming Device (per Sht. C -13) EA 1 $5,300.00 $5,300.00 Standard Pacific Homes / Kimley -Horn and Assoc. Page 1 of 2 4/8/2013 Standard Pacific Homes / Kimley -Horn and Assoc. Page 2 of 2 4/8/2013 • • Westhaven Coppel, Texas February 28, 2013 ADDENDUM: March 13, 2013 Item No. Description Unit Quantity Unit Price Amount Division II - Water Distribution, Sanitary Sewer, and Storm Drainage Systems Water Distribution System 1 8" PVC Waterline (including blocking, fittings, bends, tees, & plugs) LF 6,393 $20.40 $130,417.20 2 8" Gate Valve & Box (including blocking) EA 18 $1,055.00 $18,990.00 3 12 "x8" Tapping Sleeve & Valve EA 4 $3,865.00 $15,460.00 4 Fire Hydrant Assembly (including lead, tee, valve, and blocking) EA 13 $3,630.00 $47,190.00 5 2" Irrigation Service (where directed) EA 2 $1,985.00 $3,970.00 6 1" Single Water Service EA 143 $905.00 $129,415.00 7 Trench Safety LF 6,393 $0.10 $639.30 8 Pressure Test and Chlorination LF 6,393 $0.35 $2,237.55 9 Geotechnical Testing LF 6,393 $1.05 $6,712.65 Subtotal Water Distribution System: $355,031.70 ■ Standard Pacific / Kimley -Horn and Assoc. Page 1 of 5 4/8/2013 Item No. Description Unit Quantity Unit Price Amount Division II (cont.) - Water Distribution, Sanitary Sewer, and Storm Drainage Systems Sanitary Sewer System 1 8" PVC Sanitary Sewer Line LF 4,975 $17.50 $87,062.50 2 10" PVC Sanitary Sewer Line LF 1,755 $19.95 $35,012.25 3 12" PVC Sanitary Sewer Line LF 1,874 $28.40 $53,221.60 4 10" FIVC .•ranitxry Sewer Ling By Aerial crossing J" 96 $576,00 $55,296.00 5 4' Diameter Manhole EA 22 $2,885.00 $63,470.00 6 4' Diameter Manhole With Sealed Lid EA 3 $3,035.00 $9,105.00 7 Connect to Existing Manhole EA 1 $1,900.00 $1,900.00 8 4" Sanitary Sewer Service EA 181 $504.00 $91,224.00 9 Concrete Encasement (10" Line) LF 20 $26.50 $530.00 10 Concrete Encasement (12" Line) LF 20 $28.50 $570.00 11 Cleanout EA 3 $550.00 $1,650.00 6 Trench Safety LF 8,604 $0.10 $860.40 7 Testing LF 8,604 $0.90 $7,743.60 8 Geotechical Testing LF 8,604 $1.05 $9,034.20 Subtotal - Sanitary Sewer System: $416,679.55 ■ Standard Pacific / Kimley -Horn and Assoc. Page 2 of 5 4/8/2013 Item No. Description Unit Quantity Unit Price Amount Division II (cont.) - Water Distribution, Sanitary Sewer, and Storm Drainage Systems Storm Drainage System 1 18" RCP LF 1,804 $33.50 $60,434.00 2 21" RCP LF 819 $37.50 $30,712.50 3 24" RCP LF 78 $41.00 $3,198.00 4 30" RCP LF 202 $52.50 $10,605.00 5 33" RCP LF 87 $60.50 $5,263.50 6 36" RCP LF 584 $67.00 $39,128.00 7 42" RCP LF 275 $88.00 $24,200.00 8 48" RCP LF 731 $103.00 $75,293.00 9 5' Curb Inlet EA 20 $2,250.00 $45,000.00 10 10' Curb Inlet EA 14 $2,675.00 $37,450.00 11 3 -Grate Inlet EA 5 $2,575.00 $12,875.00 12 4' Storm Manhole W/ Access EA 2 $3,200.00 $6,400.00 13 5' Storm Manhole W/ Access EA 1 $4,050.00 $4,050.00 14 6' Storm Manhole W/ Access EA 3 $5,650.00 $16,950.00 15 18" Dry Rock Rip -Rap SY 71 $56.00 $3,976.00 16 Temporary Hadwall for 42" RCP EA 1 $2,450.00 $2,450.00 17 Temporary Grade to Drain Outfall CY 2,215 $2.70 $5,980.50 18 Connect 18" RCP to Existing Inlet EA 1 $950.00 $950.00 19 Pond Outlet Structure - 4'X4' Junction Box (12' In Height) EA 1 $5,250.00 $5,250.00 20 Pond Outlet Structure - 5'X5' Junction Box (14' In Height) EA 1 $7,100.00 $7,100.00 21 Pond Outlet Structure - 5'X5' Junction Box (15' In Height) EA 1 $7,500.00 $7,500.00 22 Sloped End Headwall for 48" RCP EA 2 $3,200.00 $6,400.00 Standard Pacific / Kimley -Horn and Assoc. Page 3 of 5 4/8/2013 Standard Pacific / Kimley -Horn and Assoc. Page 4 of 5 4/8/2013 Standard Pacific / Kimley -Horn and Assoc. Page 5 of 5 4/8/2013 PareF:. 3.'46244 CITY COPPELL•• Check N9 C4!Flt Date 04/10/13 .: ••• DATE FPO REMARKS GROSS DEDUCTION •AMOUNT PAID WESTHAyEN FEES 040913 . • -,4::130sdWay fees - „-274,703 .00 .„. 376,684 79 cAs' RECEIPT Date 4/11/1 3 082595 Received From pi3a/Fic or 12( 15 8 Ts Address • a.?) Dollar 7?: 1 „ .T„:,'•• ..,C) . p4t. p IL) 8- ACCOUNT HOW PAID AMT OF„, C) , „ CASH c1 . 51153097 0, A P 374 i://5„ f7 BALANCE MT. co DUE . , Standard Pacific Payee: 146244 CITY. OF COPPELL • .• Check- Check Date INvoicE DATE FPO REMARKS GROSS DEDUCTION AMOUNT PAID WESTHA yE N FEES 040913 ' 274,703 .00 - 376,684.79 376,684.79 CITY OF COPPELL """""•""":":""•:""":".•”: . . 70-2328/719 Standard Pacific of Texas,Inc. •.•• .• • . .: • :' • Dallas Division • Bank of America • : 909 Lake Carolyn Parkway,Suite 1700 Commercial Disbursement Account NO.. .51153097'. -----, Irving TX 75039 Northbrook,IL (972)550-0426 DATE AMOUNT . • ' ' - ' . • ;• 04/1 0/13 .„ - : THREE HUNDRED SEVENTY SIX THOUSAND SIX HUNDRED EIGHTY FOUR AND 79/100 AAAAAAAAAAAAAA PAY TO THE ' ' STANDARD PACIFIC CORP, - GENERAL ACCOUNT ---- ORDER OF:-- CITY OF COPPELL . . PO BOX 9478 •••• , COPPELL TX 7 5 0 1 9 . - . • • .. •., 4110.1!