Loading...
Villas at LV 2-CS130319 March 19, 2013 LEWISVILLE Deep Roots.Broad Wings.Bright Future. Mr. Scot Whitwer Engineering Division JBGL BF Development, LLC IL 3131 Harvard, Suite 103 Dallas, TX 75205 Re: Villas at Lake Vista Phase 2 Project No. 216242 Dear Mr. Whitwer : Please consider this a letter of final acceptance of the public improvements associated with the referenced project. The following maintenance bonds will be in effect for two (2) years until March 19, 2015. 1. Maintenance Bond No. 4389760 in the amount of$31,062.08 posted by SureTec Insurance Company will cover street approach, sidewalk, and barrier free ramp improvements at Lake Vista Drive constructed by GM Construction TX. 2. Maintenance Bond No. 4390502 in the amount of$3,239.00 posted by Sure Tec Insurance Company will cover the storm sewer and water improvements in the Lake Vista Drive right- of-way constructed by Kart Construction&Equipment Co., Inc. If you have any questions,please feel free to contact me at(972)219-3492. Sincerely, Jeff Kelly, .E. Assistant City Engineer c: David Salmon, City Engineer David Stocks, Public Works Manager Jason Kirkland, GIS Eric Schrack, Chief Construction Inspector Tamara Brooks,Administrative Secretary Ken Griffin, City of Coppell Beverly M. Trimble, Attorney-in-Fact, SureTec Insurance Company Allyson Dean,Attorney-in-Fact, SureTec Insurance Company File 151 W.Church Street•PO.Box 299002•Lewisville,Texas 75029-9002 [V] 972.219.3490•[F]972.219.3487 www.cityofiewisville.corn ti.w