CF-Andrew Park 1-CS 940128(214) 335-4510 PUBLIC WORKS 6831-B Ash Street Frisco, TX 75034 January 28, 1994 Re: Andrew Brown, Jr. Commun:i'~:y ParK-Phase II Coppell, Texas Meeting Minutes Tuesday, January 25, 1994 The following is a list of the topics discussed in our last meeting at the above referenced project. i. remove-replace select fill in portions of the building pad where the moisture conten~ is %oo high and compaction can not be properly achieved. 2. existing 2" water line was exposed to determine if it may have been leaking, however it is not the source of the water 3. reviewed revised lake layout drawing which was received by contractor on Mon. Jan. 24, .~-3~ 4. will field verify walk alignment: along lake edge at the time the walks will be formed. 5. wetlands vs sidewalk, will address afSer rough grading takes place. 6. clarified that the 18" RCP's on the south side of existing lake which the wetland area drains to will have the flow line below the lakes proposed water surface. 7. Steve Giovannini of Mesa will verify lake bottoms elevation. It is shown on the plans to be 439. 8. progress schedule is to be upda%ed once monthly. 9. due to recent rains and the discovery of the 24" RCP storm sewer line, we feel that we are currently 2 weeks behind our submitted schedule. ©~