Loading...
FIRM-930112r LMA UbL U.N LY dc e e CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER FORM 2 AND /OR LAND SURVEYOR 1. This certification is in accordance with 44 CFR Ch. I, Section 65.2. 2. I am licensed with an expertise in Land Surveying (example: water resources (hydrology, hydraulics, sediment transport, interior drainage)* structural, geotechnical, land surveying.) 3. I have 15 years experience in the expertise listed above. 4. I have ❑ prepared ® reviewed the attached supporting data and analyses related to my expertise. 5. I [,x have ❑ have not visited and physically viewed the project. 6. In my opinion, the following analyses and/or design, were performed in accordance with sound engineering practices: N/A 7. Based upon the following review, the modifications in place have been constructed in general accordance with plans and specifications. Basis for above statement: (check all that apply) a. ❑ Viewed all phases of actual construction. b. ❑ Compared plans and specifications with as -built survey information. c. [3 Examined plans and specifications and compared with completed projects. d. E] Other Supervised Field Survey 8. All information submitted in support of this request is correct to the best of my knowledge I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Charles Michael Daniel (please print or type) Title: Director of Surveying (please print or type) Registration Rio. 4199 Expiration Date: Z 31Z/ y -3 State Texas Type of License Rperisterdd Professional Land Surveyor 'Signature z 1-7 3 Date *Specify Subdiscipline Seal (Optional) Note: Insert not applicable (N /A) when statement does not apply. Uctober 1991 Page 1 of 1 APPLICATION/CERTIFICATION FORMS FOR CONDITIONAL LETTER OP MAP REVISION. LETTER OF MAP REVISION AND PHYSICAL MAP REVISION 1. 2. 3. 4. 5. 6. 7. r r AIA U Jr. U, 'N L T e e CERTIFICATION BY REGISTERED PROFESSIONAL ENGINEER FORM 2 AND/OR LAND SURVEYOR This certification is in accordance with 44 CFR Ch. I, Section 65.2. I am licensed with an expertise in water Resources (example: water resources (hydrology, hydraulics, sediment transport, interior drainage)* structural, geotechnical, land surveying.) I have 32 years experience in the expertise listed above. I have ® prepared ❑ reviewed the attached supporting data and analyses related to my expertise. I ® have ❑ have not visited and physically viewed the project. In my opinion, the following analyses and/or design, were performed in accordance with sound engineering practices: HEC -2 Model Cross sections were revised to ref lect "as - built' conditions Based upon the following review, the modifications in place have been constructed in general accordance with plans and specifications. Basis for above statement: (check all that apply) a. ❑ Viewed all phases of actual construction. b. Compared plans and specifications with as -built survey information. c. ❑ Examined plans and specifications and compared with completed projects. d. ❑ Other 8. All information submitted in support of this request is correct to the best of my knowledge. I understand that any false statement may be punishable by fine or imprisonment under Title 18 of the United States Code, Section 1001. Name: Ervin A. Meyer (please print or type) Title: vice President (please print or type) Registration No. 48275 State Texas Type of se Professional Engineer Signature i�r193 ate *Specify Subdiscipline Expiration Date: 12/93 Note: Insert not applicable (N /A) when statement does not apply. October 1992 Seal (Optional) Page 1 of 1 APPUCATION,CERTIFICATION FORMS FOR CONDITIONAL LETTER OF MAP REVISION. LETTER OF" REVISION AND PHYSICAL MAP REVISION