Loading...
FIRM Case#92-06-110P-930310SID March 10, IS Mr. Kenneth City of Copp 225 Parkway P. O. Box 471 Coppell, Tex UDA NATHAN D. MAIER CONSULTING ENGINEERS, INC. NDMJob No. 92 -01 -014 Dear Mr. Griffin: By letter dated February 1, 1993, I briefed you on the subject project that has been submitted to FEMA for a LOMR. FEMA had requested that joining cities ( Coppell) write a letter of agreement to the revision request. The map revision includes a revised baseline floodway due to a previously unmapped high ground area just west of the Carrollton landfill. The nursery is within the ineffective flow area north of the high ground and the Carrollton landfill. This being the existing condition, there is no change in the baseline or the floodway 100 - year water surface elevations when existing and proposed mapping are compared. A second item required is a copy of a public notice or notification of all affected property owners in the City of Coppell. The following notice is being published in the Citizen's Advocate newspaper to satisfy this requirement. NOTICE OF PROPOSED REVISION OF FLOODPLAIN MAPS Southwest Landscape Nursery, in cooperation with the City of Carrollton, has submitted a study to the Federal Emergency Management Agency which requests changes to the 100 -year floodplain elevations and floodway for Elm Fork of the Trinity River within the Carrollton corporate limits. The corrections are for a reach of Elm Fork and the Trinity River from Belt Line Road to approximately 3,000 feet upstream of Sandy Lake Road. The revisions are intended to demonstrate the impacts of improvements to Belt Line Road and more detailed topographic information on the floodplain and floodway. These modifications will impact the blood Boundary and Floodway (Panel 15) for the City of Carrollton.) A copy of a floodplain Study "Southwest Landscape Nursery" can be reviewed at the Engineering Department, 1945 Jackson, Carrollton, Texas 75006 or Tipton Engineering, Inc., 6330 Belt Line Road, Suite C, Garland, Texas 75043. Three NorthPark /8800 N. Central Expwy. /Suite 300 /Dallas, Texas 75231/(214) 739 -4741 Mr. Kenneth M. Griffin, P.E. March 10, 1993 Page 2 I understand that you have visited with Tim Tumulty, City of Carrollton Engineer, concerning this request and he is in agreement that this information be provided to FEMA. If you have any additional questions or need further data please call. I appreciate your assistance in this matter. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. kA-lk CAI-I� Michael H. Boyd Project Manager MHB /cmh