Loading...
FIRM Case#92-06-37R-920908JUN -26 -1995 Igo 13:29 GRAND HOMES ,ederal Emergency Management Agency Washington, D.C, 20472 CERTIFIED MAIL SE RETURN RECEIPT REQUESTED The Honorable Mark 'Wolfe Mayor, City of Coppell P.O. Box 47$ 255 Parkway Boulevard Coppell, Texas 75019 Dear Mayor Wolfet i P.03 /04 Case Na.: 92 -06 -0378 Re: Denton Creek /Villages Of Coppell, Phases 3 and 4 Communityl City of Coppell, Texas Community No.: 480170 This is in response to a letter dated April 10, 1992, from Mr. Kenneth Griffin, P.E., City Engineer, City of Coppell, regarding a request for a Conditional Letter of Map Revision (CLOMR) to the effective Flood Insurance Rate Map (FIRM) for the City of Coppello Texas, dated October 16, 1991. The CLOMR request represents a revision to the effective 100 -year floodplain and effective floodway boundaries along Denton Creek and Elm Fork of Trinity River. The request is based On proposed fill between Cross Sections 104880 and 105500 along Elm Fork of Tr4 pity River, and between -Cross Sections 1$440 and 19930 along Denton Creek. All of the data necessary to process this request were received with a letter dated April 10, 1992, from Mr. Griffin; a letter dated June 5, 1992, from Mr. Robert Porter, Project Manager, Tipton Engineering, Inc.g and a letter dated June 30, 1992, from Mr. Richard Hovas, P.E., Vice President, Tipton Engineering, Inc. Fees necessary to process this CLOMR (a total of $1,410) have been received. We have completed our review of the submitted data with regard to the data used to produce an ongoing restudy of the Flood Insurance Study for the City of Coppell, We believe Chat' a revision to the 100 -year floodplain and f140dw6y would be warranted after the ongoing restudy becomes effective and if the proposed project is constructed as shown on "Exhibit B, Reclamation Plan, Villages of Cappelli Phases h 3 and n 4, City lof Coppell, Texas," prepared by Don A. Tipton, Inc., dated January 1991, and as described in the report entitled "Elm Fork Trinity River and Denton Creek, City of Coppell, Dallas Country, Texas, Floodpl -ain Reclamation Study, Village$ Of Coppell, Phases 3 and 4, Request for Conditional LOMR," prepared by Don A. Tipton, Inc. Floodplain and floodway boundaries would be revised according to those shown on the same plan. Upon completion of this project, please submit an "as- built" grading and site plan, certified by a registered professional engineer, for the reclamation area; certification that fill, placed in the currently effective floodplain as a result of this . project is compacted to 95 percent of the maximum density obtainable with the Standard Proctor Test method issued by the American Society for Testing and Materials JASTM Standard D- analysis for the proposed Gabion Wall along Deforest Road between Cross JUN -,-16 -19950 13:29 GRAND HOMES P.04/04 Sections 18440 and 19930. We will make a final determination on revising the FIRM upon receipt of the dater listed above. Please note that the City of Cnppell is undergoing A citywide restudy and that the study hAs been appealed. The appeal does not affect the Denton Creek and Elm Fork of Trinity River associated wi.rh this project. IC is anticipated that the restudy will become effective in 1993, Because this request is based 'on flooding information contained in the restL!dy, $ final map revision for this project: can only be processed after the restudy becomes effective. Please note that the Federal, Emergency Management Agency (FEMA) has developed detailed application and certification forms for use in requesting revisions or amendments to NFIP maps„ These forms will be used for all requests received by FEMA on or after October 1, 1992. These forms highlight technical considerations in a fashion that facilitates an eliiciE!nt review,, therefore, use of these forms prior to October 1 is strongly recommended. Applications are available for Letter of Map Amendment and Letter of Map Revision Based on Fill requests. Application forms for all other revision requests should be available after September 1. If you- have any questions, please call Mr. Jim Technological Hazards Division, FEMA, Region Lvl,otin, Denton, Natural and at (817) 898 -5162, or Mr. Alan Johnson of my staff in Washington, D.C., at (202) 646 -3443, cc: Mr. Ron Morrison Morrison Hydrology /Engineering Inc, Mre Kenneth Griffin, P.E„ City Engineer ,ar- it o'nTipton Don A. Tipton, Inc. Sincerely, William R. Locke Chief, Risk Studies Divisinj. Federal Insurance Administr,Iti(in TOTAL P.04