FIRM-920618MEMO FILE COPY TO: Frank Trando, Finance Director FROM: Kenneth M. Griffin, P.E.: City Engineer SUBJECT: - Floodplain Management Ordinance Review/Revisions to the Flood _Lnsurar�ce Rate Maps (FIRM) and Flood Insurance Study (FIS) RE: City Council work Session /June 23, 1992 DATE: June 18, 1992 During the above referenced work session, Staff will make a presentation on the Floodplain Management Ordinance. in particularly, the presentation will focus on giving a clear understanding of the one - hundred year storm, floodplain, floodway, floodplain management area, floodplain development permit and valid reasons for variances to the requirements of the ordinance. Our current Flood Insurance Rate Maps are dated October 16, 1991. However, since December 1991, the City has had revised maps under review. A report from the City was submitted to FEMA on June 8, 1992. Some time this summer the City will be adopting the new maps. If City Council provides direction on any changes to the ordinance, based on the presentation, then those changes could be evaluated and incorporated into the new Floodplain Management Ordinance when the revised maps are adopted. If you should have any questions, please let me know. KMG /bd FMOAGI 100-YEAR FLOOD PLAIN FLOOD FRINGE FLOODWAY ]I- - FLOOD STREAM FRINGE CHANNEL FLOOD ELEVATION WHEN CONFINED WITHIN FLOOD Y ENCROACHMENT ENCROACHMENT IC D ONE FOOT AREA OF FLOOD PLAIN THAT COULD X: X: .................. ................. X DEVELOPMENT BY RAISING::':*:'::'*:*%%.* :X BE USED FOR ................... -X ..... ....... .. ........ ... GROUND *****-BASE FLOOD ELEVATION BEFORE ENCROACH-: *%*:::: .. . ....... X ..... ...... ME N ON -.FLOOD. PLAIN . ................. LINE AB IS THE FLOOD ELEVATION BEFORE ENCROACHMENT LINE CD IS THE FLOOD ELEVATION AFTER ENCROACHMENT b;�plltl 011 Lake Travis d 3 0 0 0 a w x 3 z Q a a A O O J w w x H 1 s 3 'C O c 7 -f ---------- w z nr w. ar C :z. oc g C3 z c 0 s I LU 14 f E `c m c a a tr .i A O O w 3 a A O O w w �-3 "Base flood" The flood having a one percent chance of being equaled or exceeded in any given year.:` ; It should be noted that the magnitude of the "base flood is subject to change as the watershed conditions change: thus, the term "base flood" as used in this ordinance may mean either of two (2) the design base floods: (1) the base flood" bf the effective FIS or, flood. See "Design base flood." "Desi ,dn base flood" The one - hundred year mean recurrence interval (100 - year) flood which will result during the design discharge from runoff from a fully urbanized watershed. For design purposes in this ordinance, it can be assumed that a 100 -year precipitation event will produce a 100 -year runoff event. "Development" Any manmade change to improved or unimproved real estate, including but not limited to buildings or other structures, mining, dredging, filling. grading, paving, excavation or drilling operations located within the floodplain management areas of the City. See "Floodplain development permit." "Development permit" See "Floodplain development permit." "Elevated building" A building located in SFHA Zones Al -99, AE. A, A0, AH, B, C, X, or D, with the lowest floor elevated above the ground level and above the design base flood by means of pilings, columns (posts and piers), or shear walls parallel to the flow of the water and adequately anchored so as not to impair structural integrity of the building during a flood of up to the magnitude of the design base flood and further includes a building elevated by means of fill or solid foundation perimeter walls with openings sufficient to facilitate the unimpeded movement of flood waters. "Encroachment" Any activity in a floodplain which hinders the passage of water or otherwise affects flood flows: e.g. fill, buildings, fences, and so on. "Flood elevation determination A determination by the Administrator of the water surface elevations of the base flood, that is, the flood level having a one percent or greater chance of occurrence in any given year under existing or design., conditions. "Flood elevation study" Ari examination, evaluation and determination of flood hazards and, if appropriate, corresponding water surface elevations and/or flood- related erosion hazards under existing or design conditions. "Flood fringe" or " floodway fringe" The portion of the floodplain outside of the regulatory floodway but still subject to flooding. "Flood Hazard Boundary Map" (FHBM) An official map of the flood areas delineating the boundaries of the flood and related erosion areas having special hazards designated as Zones A, M. and /or E. "Flood Insurance Rate Map" (FaM) The official map on which the Federal Insurance Administration has delineated both the areas of special flood hazards and the risk premium zones applicable to the City. "Regulatory fl way" The channel of a river or other watercourse and the adjacent land areas that must be reserved in order, to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. "Flood plain," "floodplain land" or "flood -prone area" Any normally dry land area susceptible to being inundated by water from any source (see "flooding ") and referenced to some statistical mean recurrence interval. most frequently the 100 -year mean recurrence interval floodplain. "Flood plain manakement area" All floodplain lands within the jurisdiction of the City whether or not the land is within an identified special flood hazards area. "Flood plain Development Permit" A permit which must be obtained by any person before any development begins on land within a floodplain. See "Development." SECTION D. Variances 1. Appeal Board The Appeal Board will near and decide appeals and requests for variances from the requirements of this ordinance. The City Council will serve as the Appeal Board unless a specific Appeal Board is otherwise appointed by ordinance. 2. Variance Procedures a. The Appeal Board shall hear and render judgement on an appeal when it is alleged there is an error in any requirement. decision or determination made by the Floodplain Administrator in the enforcement or administration of this ordinance. b. Any person aggrieved by the decision of the Appeal Board may appeal such decision in the courts of competent jurisdiction. c. The Floodplai4 Administrator shall report any variances, including the justification for . their issuance, to the Federal Emergency Management Agency upon request. 3. Variance Conditions a. Variances shall not be issued within any designated floodway if any increase in flood levels during the effective FIS base flood discharge would result. b. Variances may be issued for new construction and substantial improvements and for other development necessary for the conduct of a functionally dependent use provided that all other conditions of this section (Section D of Article 4) are met, and that the structure or other development is protected by methods that minimize flood damages during the base flood and create no additional threats to public safety. greater than one -half acre contiguous to, and surrounded by, non- complying lots will only be considered with c. ' Variances may be issued for the reconstruction, rehabilitation or restoration of structures listed on the National Register of Historic Places or the State Inventory of Historic Places, without regard to the procedures set forth in the remainder of this ordinance. d. Variances may be issued for new construction and substantial improvements to be erected on a lot of one -half acre or less in size contiguous to, and surrounded by, lots with existing structures constructed below the base flood level, for cases of exceptional hardship, providing the other relevant factors in Sub- section 60.6 of 44 CFR 1.1 have been fully considered. Variances for lot sizes greater than one -half acre contiguous to, and surrounded by, non- complying lots will only be considered with appropriate technical justification. e. Upon consideration of the factors noted, and the intent of this ordinance, the Appeal Board may attach such conditions to the granting of variances as it deems necessary to further the purpose and objectives of this prdinance. 4. Prerequisites for urant:nq variances a. Varianct_ shall only be issued upon determination that the variance is the minimum necessary, considering the flood hazard, to afford relief. b. Variances shall only be issued upon: (1) Showing a good and sufficient cause; (2) A determination that failure to grant the variance would result in exceptional hardship to the applicant; and h (3) A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or a conflict with existing local laws or ordinances. c. Any applicant .o whom a variance is granted shall be given written notice that the structure will be permitted to be built with the lowest floor elevation below the base blood elevation, and that the cost of flood insurance will be commensurate with the increased risk resulting from the reduced lowest floor elevation. 6. Foodways a. Encroachments are prohibited within designated floodways, including fill, new construction, substantial improvements and other development unless . ".certification by a registered professional engineer is provided demonstrating that equal conveyance encroachments do not result in any increase in flood levels at any floodplain location and that all other provisions of this ordinance are met during the occurrence of the base flood discharges. b. When a floodway has not been designated, no new construction, substantial improvements, or other development (including fill) shall be permitted within the 100 -year floodplain until it is demonstrated that either: (1) The cumulative effect of the proposed development, will not increase the water surface elevation of the design base flood more than oae foot above the August, 1980, FIS, or above the - most =z , em of f ective Flood Insurance Study base flood elevations, whichever is less, at any point within the stream: or, (2) The cumulative effect of the proposed development, will not increase the water surface elevation of the design base flood at any point in the stream above that which would occur without the proposed development. DEVELOPMENT PERMI' 'RMIT NO. PROPERTY WITHIN FLOODPLAIN STATE OF TEXAS COUNTY OF DALLAS CITY OF COPPELL: NAME OF PERMITTEE: The above named permittee applied for a DEVELOPMENT PERMIT on The application has been reviewed by the ADMINISTRATOR and it is his determination that the proposed development IS located within an identifiable flood plain of The ADMINISTRATOR has reviewed plans and specifications of the proposed development for conformance with the development standards required by COPPELL flood plain management regulations. You are hereby authorized to proceed with the following described work: on the following described property: To maintain compliance with the development standards of COPPELL flood plain management regulations and to eliminate or minimize flood damage potential to the proposed development, you are hereby directed to construct your proposed development in accordance with the following special provisions: ( ) For residential structures, the lowest floor (including basement) must be elevated to two (2) feet above the 100 -year base flood elevation. Minimum finished floor elevations must be shown on the plat for the development as approved by the City Engineer. (The lowest floor must be elevated two (2) feet above BFE, or one (1) foot above ultimate condition whichever is higher). ( ) For non - residential structures, the lowest floor (including basement) must be elevated or floodproofed to two (2) feet above the 100 -year base flood elevation. Minimum finished floor elevations must be shown on the plat or site plan as approved by the City Engineer. (The lowest floor must be elevated two (2) feet above BFE, or one (1) foot above ultimate condition whichever is higher. ( ) Permittee must submit a certification from a registered professional engineer, architect, or land surveyor that the finished floor level of the residential structure has been constructed two (2) feet above the 100 -year base flood elevation, or one (1) foot above ultimate condition whichever is higher. ( ) For non - residential floodproofing, a registered professional engineer or architect must certify that the floodproofing methods are adequate to withstand the flood depths, pressures, velocities, impact and uplift forces and other factors associated with the base flood. ( ) For fill activities, the permittee must submit a certification from an engineer or land surveyor that the level of the compacted fill material is at or above the elevation of the Base Flood. ( ) Provide a certified copy of all final plans or As -Built Drawings to the ADMINISTRATOR. ( ) OTHER PROVISIONS: ACKNOWLEDGEMENT OF CONDITIONS BY PERMITTEE DATE SIGNATURE OF ADM,1111STRATOR DATE