Loading...
CF-Andrew Park 1-CS 940112P.O. Box 478 Coppell, Texas 75019 214 - 462 - 0022 DATE: ATi~ENDANCE SHEET NAME: COMPANY: PHONE: (i) CITY OF COPPV. LL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: DATE: TIME: ASSIGNED INSPECTOR: I. ATI~A~DANCE: II. III. IV. (See Attached List) PLANS FURNISHED TO: A) B) c) UTILITY COMPANIES NOTIFIED: CITY YES NO CONTRACTOR YES NO OWNER YES NO A ) TELEPHONE B) GAS C ) W.T,F. CTRIC D) CABLE T.V. E) OTHER STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: V. INSPECTION: EASEMEN1S YES HIC4~qAY PERMIT YES RAILROAD PERMIT YES STREET CUT PERMIT YES BORING PERMIT YES A. DAILY INSPECTION BY ASSIGNED INSPECTOR Bo AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST RWENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SS~_Jl/STORM SEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. · APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. VIII. IXe STREET CLOSING REQUIRED: YES __ IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-~WO (72) HOURS IN ADVANCE. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: A. REQUIRED B. TRAFFIC DETOUR C. WARNING LIGHTS IF STREET DEPARTMENT HAS TO COME OUT TO MOVE THE BARRICADES AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY. INFORMATION: DEVELOPER: NO ADDRESS: PHONE: PROJECT MANAGER: CONSULTING ENGINEER: NAME: ADDRESS: PHONE: PROJECT ENGINEER: (3) GENERAL CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: EXCAVATING CONTRACTOR: NAME: ADDRESS: PHONE: SUPERINTENDENT: PAVING CONTRACTOR: ADDRESS: PHONE: SUPERINTENDENT: AS-BUILT DRAWINGS - UTILITIES 1 - MYLAR 3 - BLUE LINES DATE AS-BUILT DRAWINGS - PAVING, DRAINAGE 1 - MYLAR 3 - BLUE LINES MAINTENANCE BOND - UTILITIES PRO-RATA WORK SNRET COMPLETED/ STREET ASSESSMENTS WATER AND S~WER FINALED PAVING AND DRAINAGE FINALED DEVELOPMENT INSPECTION FEE: (4) LETIT_,R OF ACCEPTANCE WRITI~EN DATE: LETI~ER OF 'ACCEPTANCE WILL NOT BE WRITI~EN UNTIL THE PUNCH LIST MADE FROM THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE DEPARTMENTS. THIS INCLUDES SUBMI%TING: AS-BUILTS, BONDS, AND PAYING PRO-RATA. PRE-CONSTRUCTION NOTES DEFICIENT PAVEMENT, STRENGTH, THICKNESS SCREEN WALL. DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER TO THE CITY OF COPPV. LL ENGINEERING DEPARTMENT. CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL REPORTS ARE RECEIVED. COR-TEN BOLTS IN FITTINGS. FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER. STEPS IN MANHOLES. WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL. 4' BURY ON HYDRANTS. FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ). COLOR CODE HYDRANTS, TOP BONNET AND CAPS. CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE ENGINEERING DEPARTMENT. TEMPORARY SANITARY FACILILTIES. CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS). LANDSCAPE CON~ITIT~NT. LANDSCAPE MAINTENANCE AGREEMENT. PRE.CNSTRCTN. PZAGN (5)