CF-Andrew Park 1-CS 940112P.O. Box 478
Coppell, Texas 75019
214 - 462 - 0022
DATE:
ATi~ENDANCE SHEET
NAME: COMPANY: PHONE:
(i)
CITY OF COPPV. LL
PRE-CONSTRUCTION CONFERENCE
PROJECT NAME:
DATE:
TIME:
ASSIGNED INSPECTOR:
I. ATI~A~DANCE:
II.
III.
IV.
(See Attached List)
PLANS FURNISHED TO: A)
B)
c)
UTILITY COMPANIES NOTIFIED:
CITY YES NO
CONTRACTOR YES NO
OWNER YES NO
A ) TELEPHONE
B) GAS
C ) W.T,F. CTRIC
D) CABLE T.V.
E) OTHER
STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
V. INSPECTION:
EASEMEN1S YES
HIC4~qAY PERMIT YES
RAILROAD PERMIT YES
STREET CUT PERMIT YES
BORING PERMIT YES
A. DAILY INSPECTION BY ASSIGNED INSPECTOR
Bo
AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST RWENTY-FOUR (24) HOURS
BEFORE WATER/SANITARY SS~_Jl/STORM SEWER/
PAVING CONSTRUCTION BEGINS.
(2)
VI.
TESTING OF MATERIALS:
1. DENSITIES
2. · APPROVED CONCRETE BATCH DESIGN
3. CONCRETE PAVING INCLUDING CORES
4. APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII.
VIII.
IXe
STREET CLOSING REQUIRED: YES __
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE
AND FIRE DEPARTMENT SEVENTY-~WO (72) HOURS IN
ADVANCE.
CONSTRUCTION BARRICADES AND TRAFFIC CONTROL:
A. REQUIRED
B. TRAFFIC DETOUR
C. WARNING LIGHTS
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE
THE BARRICADES AND/OR REPLACE ANY BARRICADES,
THE CONTRACTOR WILL BE CHARGED FOR THEIR TIME.
AS-BUILT PLANS:
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY.
INFORMATION:
DEVELOPER:
NO
ADDRESS:
PHONE:
PROJECT MANAGER:
CONSULTING ENGINEER:
NAME:
ADDRESS:
PHONE:
PROJECT ENGINEER:
(3)
GENERAL CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
EXCAVATING CONTRACTOR:
NAME:
ADDRESS:
PHONE:
SUPERINTENDENT:
PAVING CONTRACTOR:
ADDRESS:
PHONE:
SUPERINTENDENT:
AS-BUILT DRAWINGS - UTILITIES
1 - MYLAR 3 - BLUE LINES
DATE
AS-BUILT DRAWINGS - PAVING, DRAINAGE
1 - MYLAR 3 - BLUE LINES
MAINTENANCE BOND - UTILITIES
PRO-RATA WORK SNRET COMPLETED/
STREET ASSESSMENTS
WATER AND S~WER FINALED
PAVING AND DRAINAGE FINALED
DEVELOPMENT INSPECTION FEE:
(4)
LETIT_,R OF ACCEPTANCE WRITI~EN
DATE:
LETI~ER OF 'ACCEPTANCE WILL NOT BE WRITI~EN UNTIL THE PUNCH LIST MADE FROM
THE WALK-THROUGH HAS BEEN COMPLETED AND RE-INSPECTED BY THE RESPECTIVE
DEPARTMENTS.
THIS INCLUDES SUBMI%TING:
AS-BUILTS, BONDS, AND
PAYING PRO-RATA.
PRE-CONSTRUCTION NOTES
DEFICIENT PAVEMENT, STRENGTH, THICKNESS
SCREEN WALL.
DISCUSS ANY CHANGES IN DESIGN - MUST BE IN WRITING FROM DEVELOPER'S ENGINEER
TO THE CITY OF COPPV. LL ENGINEERING DEPARTMENT.
CONSTRUCTION WATER - NOT AVAILABLE UNTIL PRESSURE TEST AND BACTERIOLOGICAL
REPORTS ARE RECEIVED.
COR-TEN BOLTS IN FITTINGS.
FIRE HYDRANT BURY LINE AT TOP OF CURB OR HIGHER.
STEPS IN MANHOLES.
WATEROUS VALVES AND HYDRANTS OR APPROVED EQUAL.
4' BURY ON HYDRANTS.
FORD DOUBLE CHECK METER LOOP (SEE CITY SPECIFICATIONS ).
COLOR CODE HYDRANTS, TOP BONNET AND CAPS.
CITY OF COPPELL GENERAL CONSTRUCTION SPECIFICATIONS AVAILABLE AT THE
ENGINEERING DEPARTMENT.
TEMPORARY SANITARY FACILILTIES.
CONSTRUCTION HOURS AND TRAFFIC CONTROL CONSTRICTIONS (HOURS).
LANDSCAPE CON~ITIT~NT.
LANDSCAPE MAINTENANCE AGREEMENT.
PRE.CNSTRCTN.
PZAGN
(5)