Loading...
FIRM-921006FILE COPY MEMO TO: Steve Goram, Director of Public Works VIA: Kenneth M. Griffin, P.E., City Engineer �4 FROM: M. Shohre Daneshmand, P.E., Civil Engineer SUBJECT: Flood Insurance Rate Map Revision Denton Tap Road Bridge Crossing Grapevine Creek DATE: October 6, 1992 . As you may know, FEMA is in the process of revising our floodplain maps. Apparently, there are still some items that need to be addressed as related to the referenced Denton Tap Road Bridge (i.e. as-built plans, maintenance, etc.). It is requested by FEMA, per subparagraph 60.3 (b)(7) of NFIP regulations, the City shall assure that the channel modifications related to the Denton Tap Road bridge replacement be properly maintained. (See attached check list dated January 3, 1991) Please provide a letter to FEMA to the attention of Matthew Miller, P.E., addressing the channel maintenance, at your earliest convenience, and forward it to me for inclusion with other necessary documents before submitted to FEMA. If I can be of any assistance, please advise. I appreciate your help. KMG/MSD/bd firm