CF-Andrew Park 1-CS 930714COPPELL PUBLIC WORKS
MEMORANDUM
DATE: July 14, 1993
TO: Larry Davis, Construction Inspector ~
FROM: Howard L. Pafford, Utilities Superintendent zi~x~
RE: Final Walk Through of Andrew Brown Park PhaseN~ (Water/Sewer)
Utilities personnel performed a walk through on the above referenced project this morning
and the following items need to be corrected prior to acceptance.
1. Bolt down lids on sanitary sewer manholes in flood plain.
2. Line markers on manholes and cleanouts - Utility markers.
Please ensure these items are corrected prior to final acceptance of the project.
HLP/dm
WALKTHRU. HLP/ABPARK