Coppell Ind 2-LR130415 (2)
REPORT OF FIELD GRADATION TESTS
Tradepoint Center II
Creekview Road & Freeport Parkway
Coppell, Texas
REPORTED TO:
Hillwood
REPORT NO.
3090 Olive Street, Suite 300 335
Dallas, Texas 75219
REPORT DATE:
04-15-13
ATTN: Mr. Kerry Roetzel
REG PROJECT NO.
18520
TECHNICIAN:
J. Bowers
CONTRACTOR:
Hillwood Construction Services
PAGE:
1 of
Specification
SievePercentSievePercentSievePercent
SizePassing (%) SizePassing (%) SizePassing (%)
1 3/4” 100 3/4” 85 #4 60
PassingPassingPassing
DateLocation1-3/4” Sieve3/4” Sieve #4 Sieve
03-28-13 Paving: Spine Rd. Extension: STA 17+50 100 99 68
Paving: Spine Rd. Extension: STA 16+00 100 98 64
Paving: Spine Rd. Extension: STA 14+50 100 99 69
Paving: Spine Rd. Extension: STA 13+00 100 99 66
Paving: Spine Rd. Extension: STA 11+50 100 99 65
Approach: Spine Rd. Ext.: STA 10+15 100 99 67
E-MailSubmitted by:
Distribution:
(1) Hillwood/Mr. Kerry Roetzel
REED ENGINEERING GROUP, LTD.
(1) Hillwood Construction Services/
Registration Number F-3114
Mr. Gary Jones
(1) Halff Associates/
Mr. Stephen Crawford
(1) Halff Associates/
Mr. Lance Clinton
Bill Woolwine
(1) Macgregor Associates/
Sr. Manager, CMT
Mr. Thomas Holland
BW/cdl
(1) Macgregor Associates/
Mr. Lee Rader
(1) City of Coppell/Mr. Lee Stone
(1) City of Coppell/
Mr. Michael Arellano
(1) City of Coppell/Mr. Rick O’Dell
(1) Ms. Sacha Miner
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019
TELFAX