Loading...
CF-Andrew Park 1-CS 930329COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: March 29, 1993 Rick Wieland, Parks and Recreation Manager R.D. Slayton, Parks Crewleader Punchlist for Kid Country Project Here is a list of the items that need to be corrected in order to complete the project at Kid Country: 1. Sleeves need to be located and marked in their proper location with a brass pin. 2. In compliance with contract, rye grass was sewn but did not receive a good stand. The contractor shall reseed designated areas as agreed per conversation on March 26, 1993. 3. Steve Giovannini wishes to have concession stand pad checked to verify proper grade and compaction. 4.. Contractor spread excess dirt and in doing so changed the integrity of the existing plans. Contractor shall have area reshot and report findings to Steve Giovannini so that he can change reference specs. The drainage flume on Northwest corner of shed needs to be reworked for ease of maintenance. Ail leftover concrete, rock, and debris shall be removed from job site. Need keys to electrical boxes. Parking lot needs the corrections agreed upon on March 26, 1993; i.e., blow out sidewalks, cracks in structure, etc. KCREPAR.RDS