Loading...
Tax 2012A-CS130418 MEMORANDUM TO: Tax 2012 Folder – Mockingbird FROM: Keith Marvin, P.E. DATE: April 18, 2013 REF: Public Meeting Introductions   Keith Marvin – Project Engineer  Matt Atkins – Design Engineer  Albert Samaniego – Construction Inspector  RKM Utilities – Shane Huffman (PM)  Stakeholders Scope of Project:  New 12” water line – New services & meter cans for school & houses that front Mockingbird. New 8” Sewer line – new sewer services with cleanout at property line for houses that front Mockingbird. New Paving – 9” thick with compacted subgrade 38’ back to back. Sidewalk – 4’ both sides – ADA requirements of 5’x5’ passing area every 200 feet will be met by the addition of passing areas. Funding Source: ¼ cent sales tax allocated to streets during November 2007 election, and reauthorized in 2011. Contract amount - $987,155.00 with $60,000 potential bonus for early completion Schedule : Project to begin on or about April 22, 2013. 175 Calendar Day max schedule, providing for an October 2013 completion date. $20,000 allocated for early completion bonus. $1,000 per day penalty for late completion. Access: Two way traffic will be maintained through the last day of school, June 5th. Beginning as early th as June 6 traffic will be restricted to one-way northbound. One-way traffic will be maintained th through August 25, when all paving is to be complete. Two-way traffic will be re-established th prior to the start of school on August 26. A $40,000 incentive has been established if the contractor is able to meet this schedule. A $2,000 per day penalty will be assessed if the contractor is unable to have all paving open to traffic and sidewalk to the school property open th by August 25. • MOCKINGBIRD LN RECONSTRUCTION PROJECT PUBLIC MEETING — APRIL 18, 2013 NAME ADDRESS PHONE EMAIL M CLIA.A.2A- on2, 3 ,) %4 lotc■ AL-ZA CCoVc ('b.:4-)01 Y /(NP) 11114. MCV4V1 7417., FoLf—oli AJAX- 114 727.61533 pli14 e t SAT Pc:014 • Cø t4'1 N (AM) L,o p IAA/mai/ o11l-c1et- ot4 divi7,10o-r6q,o( can N At(e.c kí L 3-2 Hoek'IAJ6- /S q7 -7464 4T Az z , Y N f4.54LUe/Vie( .- if2cCIV(A) ereSf C)S 13, N Y I N Y I N Y I N Y / N Y I N Y / N Y I N Y / N Y / N NAB ADDRESS PI EONS EMAIL RECE1' UPDA'T '' 1��, kr J,e\,e. , 2 Al IC 7 -��V-1646. e . 1crvt*NeC: "3tt`e sa✓ y / N [-m•\ \) Ire r 7211 a a1WA:tv'Mg .FQ g Y N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N Y / N