Amberpoint 2R&3R-CS130419 ■■• HALFF. 1201 North Bowser Road
Richardson,Texas 75081
(214)346-6200
Fax(214)739-0095
LETTER OF TRANSMITTAL
To: City of Coppell- Engineering Date: April 19, 2013
255 Parkway Blvd. "4�-�T� 3CA 1 -
Coppell, Texas 75019
Attn: Mike Garza f"bt Z - ""
From: Jared Canuteson, P.E. AVO: 28744
Email: JaredCanuteson @halff.com
WE ARE SENDING YOU DAttached ❑ Under separate cover via_ the following:
❑ Shop Drawings ❑ Prints ❑ Plans ❑ Drawings El Specifications
❑ Copy of letter ❑ Report(s) ❑ CD/DVD ❑ Other:
VIA: ❑Hand Delivery DUS Postal Service Courier ['Overnight Express
THESE ARE TRANSMITTED as checked below:
® For approval El Approval as submitted ❑ Resubmit_copies for approval
❑ For your use ❑ Approved as noted ❑ Submit copies for distribution
❑ As requested ❑ Returned for corrections ❑ Return corrected prints
® For review/comment ❑ Other:
ITEMS SENT:
• 6 Sets of the Construction Plans dated 04-19-2013 for stamping (3 for City of Coppell, 2 for Contractor CF
Jordan, and 1 for Halff Associates).
COMMENTS:
SIGNED: Jared Canuteson, P.E.
COPIES:
® File ® Owner ® Contractor ❑ Other:
rj_ Ain 13