CF-Andrew Park 1-CS 930326COPPEL?. PUBLIC WORKS DATE: TO: FROM: RE: MEMORANDUM March 26, 1993 Larry Davis, Construction Inspector Howard L. Pafford, Utilities Superintendent~ Walk-Through Andrew Brown Park Phase I I/~ (Water/Sanitary Sewer) The above referenced walk through was conducted by Utilities personnel this morning at 9:30 a.m. The following items were found to be deficient during this walkthrough. 1. Two of the 3 - 2" meter sets net an 18" meter can placed over lower cut-off on pressure side of setter. 2. 8" Water main line valve needs pad repoured and brought to grade. 3. Manholes need chimney seals. Chimney seals will need special fittings to allow application where cone has no monolithic rise from angle of cone. 4. The two cleanouts on the sanitary sewer mainlines need to clean concrete off caps and bolts. Also, if the cleanouts are only 4", was this called for in construction plans? Please ensure these items are corrected prior to acceptance of this project. If you have any questions, please advise. HLP/dm cc: Steven G. Goram, Director of Public Works