Loading...
Coppell Ind 2-LR130409REEL7 EI-IG I M1-=EFRIMES GEOTECHNICAL AND G R O U P ENVIRONMENTAL CONSULTANTS CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO: Hillwood 3090 Olive Street, Suite 300 Dallas, Texas 75219 ATTN: Mr. Kerry Roetzel CONTRACTOR: Hillwood Construction Services REPORT NO. 275 REG PROJECT NO. 18520 SAMPLE DATE: 03 -12 -13 TECHNICIAN: Contractor PAGE: 1 of 1 _ocation of Sample Set Number Location Quantity Represented (c.y.) 1 Inlet top: Storm Lateral A -2A, STA 1 +34 8/8 )esi n Information Source of Concrete Mix Identification Specified Strength (psi) Redi Mix 101-11524 4000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load lbs. Compressive Strength (psi) Average Strength (psi) 1 5248 03 -19 -13 7 76110 6060 5248 04 -09 -13 28 90000 7160 5248 04 -09 -13 28 82370 6560 5248 04 -09 -13 28 91260 7260 6990 5248 Hold H Note: (1) Concrete cylinders were tested in accordance with ASTM C -39 E -Mail Distribution: (1) Hillwood /Mr. Kerry Roetzel (1) Hillwood Construction Services/ Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates /Mr. Lance Clinton (1) Macgregor Associates/ Mr. Thomas Holland (1) Macgregor Associates/ Mr. Lee Rader (1) City of Coppell /Mr. Lee Stone (1) City of Coppell /Mr. Michael Arellano (1) City of Coppell /Mr. Rick O'Dell (1) Ms. Sacha Miner Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F -3114 Bill Woolwine Sr. Manager, CMT BW /cn 2424 STUTZ DR. • SUITE 400 • DALLAS, TX 75235 • TEL [214] 350 5600 • FAx [214] 350 0019