Oak Grove-CS130425 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Alford Media Addition, Lot 1R and Lot 2, Block 1, Replat, being a replat of Lot 1, Block 1, of the Alford Media Addition to allow the retention of the existing uses and easements on Lot 1R (10.9 acres) and the subdivision of Lot 2 for single family (3.6 acres) on 14.5 acres of property located along the east side of Freeport Parkway, north of Rolling Hills Memorial Center, at the request of Alford Coppell Real Estate Holdings, being represented by Lynn Kadleck & Associates. STAFF REP.: Gary SiebPROJECT ID# RPNR-13-0023 DRC DATE: April 25, 2013 and May 2, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. We are moving Alford Media’s fire lane off of Freeport Parkway further south, can we re-plat that with this plat? I will have our engineer send Kadleck the location. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: PD-263-SF-9, The Preserve at Oak Grove, a zoning change request from LI (Light Industrial) to PD-263-SF-9 (Planned Development-263-Single Family-9), to attach a Detail Site Plan on 3.56 acres of property to allow the development nine (9) single-family homes to be located at the extension of Oak Grove Lane, at the request of Alford Coppell Real Estate Holdings, being represented by Lynn Kadleck & Associates. STAFF REP.: Gary SiebPROJECT ID# PD-13-0024 DRC DATE: April 25, 2013 and May 2, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Remove the note about the city creek maintenance. The HOA or property owner will be responsible for maintenance of the creek. The easement is just for conveyance of the creek. 2. Sidewalks will be required. 3. Are you filling in the little creek on lots 1-4? You will need to make sure that it is properly filled, compacted and tested. I do have some concerns with this. 4. What does the drainage do coming off of the existing Oak Grove, coming from a 60’ ROW to a 50’? is there a bar ditch that needs to be accommodated? 5. Lot 16 on Irby addition sewer service is tied into the sewer you are abandoning, you will need to accommodate them with sewer if you plan to abandon them. 6. There will be additional comments during detailed engineering plan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Irby Addition, PH II, - The Preserve at Oak Grove, Replat, being a replat of a portion of Lot 2, Block 1, of the Alford Media Addition to allow the subdivision of nine (9) single-family lots on 3.56 acres of property to be located at the extension of Oak Grove Lane, at the request of Alford Coppell Real Estate Holdings, being represented by Lynn Kadleck & Associates. STAFF REP.: Gary SiebPROJECT ID# RPR-13-0025 DRC DATE: April 25, 2013 and May 2, 2013 CONTACT: Michael Garza, P.E., Civil Engineer, 972-304-7019 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z 1. Label the base flood elevation for the floodplain and the finish floor. The finish floor must be at least 2’ feet above the BFE.