Loading...
Coppell Ind 2-LR130419 (2) CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 313 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 03-22-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: J. Bowers PAGE: 1 of 1 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Retaining wall: 150’N, 30’W from SE building corner 10/20 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter Redi-mix 9337 3000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 5464 03-29-13 7 115630 4090 5464 04-19-13 28 170500 6030 5464 04-19-13 28 163890 5800 5920 5464 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 5464 5.0 3:45 PM 50 61 1.9 149.2 N/A Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-MailSubmitted by: Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX CONCRETE CYLINDER TEST REPORT Tradepoint Center II Creekview Road & Freeport Parkway Coppell, Texas REPORTED TO:REPORT NO. Hillwood 312 3090 Olive Street, Suite 300 REG PROJECT NO. 18520 Dallas, Texas 75219 SAMPLE DATE: 03-22-13 ATTN: Mr. Kerry Roetzel TECHNICIAN: C. Eisenhardt PAGE: 1 of 3 CONTRACTOR: Hillwood Construction Services Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 280’N, 90’E from SE building corner 40/840 2 Paving: 295’N, 120’E from SE building corner 140/840 3 Paving: 300’N, 60’E from SE building corner 240/840 4 Paving: 360’N, 125’E from SE building corner 340/840 5 Paving: 415’N, 100’E from SE building corner 440/840 6 Paving: 460’N, 40’E from SE building corner 540/840 7 Paving: 510’N, 120’E from SE building corner 640/840 8 Paving: 580’N, 110’E from SE building corner 740/840 9 Paving: 279’N, 129’E from SE building corner 840/840 Design Information Source of Concrete Mix Identification Specified Strength (psi) Potter 7752TP 4000 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 1 5440 03-29-13 7 108120 3830 5440 04-19-13 28 144540 5120 5440 04-19-13 28 144680 5120 5120 5440 Hold H 2 5441 03-29-13 7 128350 4540 5441 04-19-13 28 147370 5220 5441 04-19-13 28 155000 5490 5360 5441 Hold H 3 5442 03-29-13 7 116760 4130 5442 04-19-13 28 151340 5360 5442 04-19-13 28 158080 5590 5480 5442 Hold H 4 5443 03-29-13 7 119600 4230 5443 04-19-13 28 136810 4840 5443 04-19-13 28 149520 5290 5070 5443 Hold H 2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 [214] 350 5600 [214] 350 0019 TELFAX REPORT NO. 312 REG PROJECT NO. 18520 SAMPLE DATE: 03-22-13 PAGE: 2 of 3 Test Results SetCylinder Age @ Total Load Compressive Average Strength No. ID Date Tested Test(lbs.)Strength (psi) (psi) 5 5444 03-29-13 7 102710 3630 5444 04-19-13 28 145610 5150 5444 04-19-13 28 142280 5040 5100 5444 Hold H 6 5445 03-29-13 7 108860 3850 5445 04-19-13 28 143690 5090 5445 04-19-13 28 147510 5220 5160 5445 Hold H 7 5446 03-29-13 7 109420 3870 5446 04-19-13 28 129410 4580 5446 04-19-13 28 140440 4970 4780 5446 Hold H 8 5447 03-29-13 7 104950 3710 5447 04-19-13 28 153360 5430 5447 04-19-13 28 147650 5230 5330 5447 Hold H 9 5448 03-29-13 7 104620 3700 5448 04-19-13 28 145380 5150 5448 04-19-13 28 142670 5050 5100 5448 Hold H Cylinder Data Air ConcreteAir Unit SetCylinder SlumpTime of Temp.Temp.EntrainmentWeightTicket 3 No. ID (inches)Sample(°F)(°F)(%) (lbs/ft)Number 1 5440 5.0 5:00 AM 64 62 4.0 146.4 32591 2 5441 5.25 6:00 AM 64 68 4.1 146.8 32601 3 5442 5.0 7:00 AM 55 70 4.1 146.4 32611 4 5443 5.25 8:10 AM 50 62 4.5 146.4 32621 5 5444 5.75 9:10 AM 51 60 4.3 147.1 32631 6 5445 5.0 10:45 AM 49 61 4.3 146.8 32641 7 5446 5.25 12:15 PM 50 60 4.2 146.4 32651 8 5447 5.25 1:45 PM 51 61 4.5 147.0 32661 9 5448 5.0 3:30 PM 52 60 4.3 146.8 32671 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 312 REG PROJECT NO. 18520 SAMPLE DATE: 03-22-13 PAGE: 3 of 3 Submitted by: E-Mail Distribution: (1) Hillwood/Mr. Kerry Roetzel REED ENGINEERING GROUP, LTD. (1) Hillwood Construction Services/ Registration Number F-3114 Mr. Gary Jones (1) Halff Associates/ Mr. Stephen Crawford (1) Halff Associates/Mr. Lance Clinton (1) Macgregor Associates/ Bill Woolwine Mr. Thomas Holland Sr. Manager, CMT (1) Macgregor Associates/ BW/cn Mr. Lee Rader (1) City of Coppell/Mr. Lee Stone (1) City of Coppell/Mr. Michael Arellano (1) City of Coppell/Mr. Rick O’Dell (1) Ms. Sacha Miner